Municipal Land-Use Plan
A municipal land-use plan is a binding document that sets the allowed use and building limits for each part of a municipality.
What is a municipal land-use plan?
A municipal land-use plan (Slovak: územný plán obce) is the planning document for the whole territory of one municipality. It follows the regional concept and the national concept (Zákon 200/2022 Z. z., § 22 ods. 1). The city version is called územný plán mesta. For Bratislava and Košice it is called metropolitný územný plán.
The plan has a text part and a graphic part, and both have an informative part and a binding part (§ 18 ods. 7). The binding part decides what you may build. The Office for Spatial Planning and Construction sets the content and method by a generally binding regulation (§ 39 ods. 1). Two or more municipalities may agree on a joint plan, which every council must approve (§ 22 ods. 2). This page uses version 01.03.2026 of the act. The same act repealed the 1976 building act, which governed plans before.
Where does it sit among the five planning levels?
The act names five levels of planning documents (§ 18 ods. 4). The binding part of a higher level binds the lower level. A lower-level rule that conflicts with a higher level is invalid in that part (§ 18 ods. 3).
| Level | Document | Approved by |
|---|---|---|
| 1 | Koncepcia územného rozvoja Slovenska | Government, by regulation (§ 34 ods. 6) |
| 2 | Koncepcia územného rozvoja regiónu | Self-governing region, with a generally binding regulation (§ 34 ods. 7) |
| 3 | Územný plán mikroregiónu | Self-governing region, with a generally binding regulation (§ 34 ods. 7) |
| 4 | Územný plán obce | Municipality, with a generally binding regulation (§ 34 ods. 8) |
| 5 | Územný plán zóny | Municipality, with a generally binding regulation (§ 34 ods. 8) |
Must every municipality have a municipal land-use plan?
Yes. Every municipality must have one, with one exception: the duty ends if the whole municipal territory is part of a microregion plan (§ 22 ods. 1). The act sets no minimum number of inhabitants.
A municipality without a plan must procure and approve one by 31 March 2032. Until then it issues a statement for building permits, and that statement only recommends (§ 40 ods. 2). From 1 April 2025 the act adds a stricter rule for a municipality that still has no plan on 31 March 2032. In that case a building may stand only inside the built-up area marked in the cadastre on 1 January 1990. Outside it, only farming, forestry and water buildings, a significant investment, and some transport and technical infrastructure are possible (§ 40e ods. 1).
What does a municipal land-use plan contain?
The plan determines, among other things, the urban concept and the way and intensity of land use. It sets the spatial and functional limits of development. It also covers transport and technical infrastructure with their protection zones, public spaces, green infrastructure and heritage protection (§ 22 ods. 3). It also shows the areas where a zonal plan is needed (§ 22 ods. 3 písm. k). Protected areas and protection zones set by other laws must be carried into the plan (§ 22 ods. 4).
The binding part has two main pieces (§ 18 ods. 7):
- A regulatory drawing (regulačný výkres) that shows the spatial and functional regulation.
- Regulatory sheets (regulačné listy), one for each spatial-functional unit (priestorovo-funkčný celok) of the territory.
The act defines a regulative as a parameter or limit that sets conditions for building. It can be written as text, as a number or as a drawing (§ 5). The act itself sets no national value for building coverage, floor-area ratio or green-space coefficient. The municipal plan sets them, so read them in the plan for your plot.
How do I read a municipal land-use plan before buying a plot?
Start with the regulatory drawing, find your plot, and read the regulatory sheet of the unit it lies in. Check these points in order:
- The function. The act splits land use into a basic function, an allowed function and a forbidden function (§ 5). Your planned house must fit the basic or allowed function.
- The regulatives for that unit. They are the limits on building that the sheet lists.
- Whether an area for a road, a public building or green infrastructure covers the plot (§ 22 ods. 3 písm. d, f, l).
- Any protected area or protection zone that touches the plot (§ 22 ods. 4).
- Whether a zonal plan covers the plot. The binding opinion checks the lowest available level first (§ 24 ods. 2), so a zonal plan can add stricter detail.
- Whether a building moratorium (stavebná uzávera) applies while the plan or a change is in preparation (§ 30).
Then check the date. A plan approved before 31 March 2024 stays valid until it is replaced, and the replacement is due by 31 March 2032 (§ 40 ods. 3 and 4).
Where can I find the municipal land-use plan of my municipality?
The public part of the information system of the Office shows the planning documentation and the register of planning documents (§ 25 ods. 2 and § 34 ods. 5). The municipality must also publish and update its approved plan (§ 11 písm. h). The paper copy is kept at the seat of the municipality (§ 34 ods. 5).
For one plot you can ask for an extract from the binding part. It shows a cut of the regulatory drawing and the regulatory sheet of the unit (§ 25 ods. 12). The municipality issues a paper extract when the system cannot supply it (§ 11 písm. j). For plans approved before 1 April 2024 the municipality also issues, on request, a územnoplánovacia informácia. It is not a binding opinion and does not approve a building (§ 40 ods. 13).
Does the plan decide whether I get a building permit?
Yes. Construction may be carried out only in line with the binding part of the planning documentation (Zákon 25/2025 Z. z., § 21 ods. 1). The planning authority is an affected authority in the proceedings and gives a binding opinion on that match (§ 21 ods. 5). The municipality issues the opinion. Where the municipality has no plan, the self-governing region issues it (200/2022, § 24 ods. 4 and 5).
Who approves a municipal land-use plan and how long does it take?
The municipality approves the plan together with a generally binding regulation that declares the binding part (§ 34 ods. 8). The approval document is a resolution of the municipal council (§ 22 ods. 6). The steps are the assignment (zadanie), the draft, the public discussion, the consent and opinions of other bodies, and the approval (§ 17, § 31).
The authority must approve a draft within two years of the notice that discussion starts. For Bratislava and Košice the limit is three years. After that the discussion must start again (§ 34 ods. 3). A change to the plan has a limit of one year, or two years in Bratislava and Košice (§ 34 ods. 4).
How is a municipal land-use plan changed?
Anyone can send a suggestion for a change. The authority must assess each suggestion and tell the sender within 30 days whether it enters the register of suggestions (§ 32 ods. 2). At least once in four years the municipality writes a report on the state of the plan. That report is the basis for a decision on changes or a new plan (§ 32 ods. 1 and 8).
A change can place a public-interest building. Then the person who made the suggestion can pay the costs of the change and so bring it forward (§ 33 ods. 1). The act holds no price list. Any price you read elsewhere has no basis in the act.
How does it differ from a zonal land-use plan?
A zonal plan covers one part of the municipality and sets detailed conditions for each spatial-functional unit and plot (§ 23 ods. 1). It must match the municipal plan (§ 23 ods. 1). The authority procures a zonal plan for a monument reserve or monument zone. It also procures one where the municipal plan requires it or development needs detailed treatment (§ 23 ods. 2).
| Point | Municipal plan | Zonal plan |
|---|---|---|
| Area | The whole municipality | One part of the municipality |
| Duty | Every municipality (§ 22 ods. 1) | Only in the cases of § 23 ods. 2 |
| If they conflict | A later municipal plan names which part of the zonal plan is void (§ 22 ods. 5) | Must match the municipal plan |
A land-use study is different. It is a planning basis and not planning documentation, so it does not bind (§ 16 ods. 1 and 4, § 18 ods. 2).
Frequently asked questions
- Is a municipal land-use plan mandatory in Slovakia?
- Yes, every municipality must have one, unless the whole municipality is part of a microregion plan (§ 22 ods. 1). A municipality without a plan must approve one by 31 March 2032 (§ 40 ods. 2). The act has no limit of 2,000 inhabitants.
- How do I read a municipal land-use plan before I buy a plot?
- Find the plot on the regulatory drawing and read the regulatory sheet of its unit. Check the function, the regulatives, the protection zones and any zonal plan or building moratorium. Ask the municipality for an extract from the binding part before you sign.
- How is a municipal land-use plan changed?
- The municipality procures a change and approves it with a generally binding regulation (§ 33, § 34 ods. 8). Anyone can send a suggestion, and the authority must assess it and reply within 30 days (§ 32 ods. 2). A change must be approved within one year of the notice that discussion starts (§ 34 ods. 4).
- What happens if a municipality has no plan?
- Until it approves one, it only issues a statement that recommends and does not bind (§ 40 ods. 2). The self-governing region issues the binding opinion (§ 24 ods. 5). If no plan exists on 31 March 2032, building outside the 1990 built-up area is mostly excluded (§ 40e ods. 1).
- How long is a municipal land-use plan valid?
- The act sets no end date for a plan made under it. The authority must report on its state at least once in four years (§ 32 ods. 1). Plans approved before 31 March 2024 must be replaced by 31 March 2032, or they lose validity on 1 April 2032 (§ 40 ods. 3).
- Does a municipal land-use plan set a maximum building coverage?
- The act sets no national maximum. The plan of the municipality sets the regulatives for each unit, and you find the value on the regulatory sheet of your plot (§ 5, § 18 ods. 7).
Sources
- Zákon č. 200/2022 Z. z. o územnom plánovaní a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 5, § 11, § 16 to 18, § 22 to 25, § 30 to 34, § 39, § 40, § 40e
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 21 ods. 1 a 5
- A house in town or in a satellite?
- Flat Roof on a Family House: Build-up and Waterproofing
- Taking a Plot Out of Agricultural Land
- Roof Coverings: Tile, Metal or Membrane
- Rainwater: Retention and Reuse
- How to Read a Municipal Land-Use Plan
- A House on a Slope: Upsides and Risks
- Protection Zones and Easements on a Plot
- How to choose a building plot: checks before you buy