Land-Use Study
A land-use study is a planning basis that assesses development options for an area and proposes solutions, but it is not a binding plan.
What is a land-use study?
A land-use study (Slovak: územná štúdia) is a planning basis that assesses options for sustainable spatial development and verifies conditions for change in a territory. It also proposes solutions to selected problems there.
The Spatial Planning Act (Act 200/2022 Z. z.) defines it in § 16 ods. 4. A study covers built-up and non-built-up land of a municipality or a self-governing region. Its subject is any problem or phenomenon that can affect or condition the spatial layout and functional use of the territory.
Is a land-use study binding?
No. A land-use study is a planning basis (územnoplánovací podklad), and the act gives a binding part only to planning documentation (§ 16 ods. 1, § 18 ods. 2 and 7).
Planning documentation has five levels, and a study is none of them (§ 18 ods. 4). Building must follow the binding part of planning documentation (Act 25/2025 Z. z., § 21 ods. 1). A binding opinion tests conformity with that binding part, not with a study (Act 200/2022 Z. z., § 24 ods. 1). The act sets no public discussion or approval for a study. Its discussion rules cover only the draft of planning documentation (§ 31).
How does a land-use study differ from a zonal plan?
A zonal plan is binding planning documentation for a part of a municipality. A study only prepares the ground for such documentation.
| Question | Land-use study | Zonal plan |
|---|---|---|
| Legal class | Planning basis (§ 16 ods. 1) | Planning documentation, the fifth level (§ 18 ods. 4) |
| Binding part | None. The act gives it only to documentation (§ 18 ods. 7) | Yes, declared by a generally binding ordinance (§ 34 ods. 8) |
| Discussion and approval in the act | None stated | Discussion of the draft and approval by the municipality (§ 31, § 34) |
| Test in a binding opinion | Not used | Checked first (§ 24 ods. 2) |
The municipal plan sits one level above the zonal plan (§ 18 ods. 4). The regulatory plan is not a level in this act.
What is a landscape-planning study?
A landscape-planning study (krajinnoplánovacia štúdia) is a kind of land-use study. It describes the actual state of the landscape and verifies or proposes part of the urban concept (§ 16 ods. 4).
It covers mainly the protection, renewal and creation of landscape infrastructure, landscape structure and green infrastructure in a defined area.
What replaced the urban study, the territorial general plan and the territorial prognosis?
The land-use study replaced them. Each of the three older documents counts as a land-use study if it was procured and in progress by 31 March 2024 (§ 40 ods. 8).
| Older document | Slovak name | Status under Act 200/2022 |
|---|---|---|
| Urban study | urbanistická štúdia | Counts as a land-use study |
| Territorial general plan | územný generel | Counts as a land-use study |
| Territorial prognosis | územná prognóza | Counts as a land-use study |
Who orders and pays for a land-use study?
The planning authority procures the study, on its own initiative or on the initiative of another person (§ 28 ods. 2). The municipality procures current bases for its municipal and zonal plans (§ 11 písm. b).
The authority procures through a qualified person (§ 27 ods. 1). The authority bears the cost (§ 27 ods. 4). It may ask for full or partial repayment from the person whose initiative or need caused the procurement.
The authority may also use a basis prepared under an agreement with another person. That basis must meet the content, method and qualification conditions of the act (§ 28 ods. 3).
The act sets no price for a study. The cost depends on the area and the content that the assignment requires.
What rules must a study follow?
A study must not conflict with four sets of rules (§ 16 ods. 4). These are the standards and methodology for its preparation, the content requirements, the general requirements on spatial layout and functional use, and the technical requirements on construction.
The Office for Spatial Planning and Construction sets these by decree (§ 39 ods. 1 písm. a to c). A study does not decide a building intent. For the development of one plot, see feasibility study and architectural study, which are not planning bases under this act.
Who prepares a land-use study?
A processor (spracovateľ) prepares it. The processor is a person with the qualification and authorisation that a separate regulation requires. A legal entity can act as processor through such a person (§ 14 ods. 1 and 2).
A qualified person (odborne spôsobilá osoba) entered in the register of the Office procures the study for the authority (§ 13 ods. 1, § 27 ods. 1). Entry needs a university degree in a listed field, practice, and an exam.
Where is a land-use study published, and can it support a plan change?
The authority makes the bases it procures available in the information system and updates them at least once every four years (§ 28 ods. 9).
A study can support a change to documentation. The authority procures bases to find out whether a change is needed and to prepare it (§ 28 ods. 2). See spatial plan amendment.
Frequently asked questions
- What is a land-use study?
- A land-use study (územná štúdia) is a planning basis. It assesses options for sustainable development, verifies conditions for change and proposes solutions to selected problems (Act 200/2022 Z. z., § 16 ods. 4).
- Is a land-use study the same as an urban study?
- No, but it replaced it. An urban study (urbanistická štúdia) procured and in progress by 31 March 2024 counts as a land-use study (§ 40 ods. 8).
- Does a land-use study have legal force?
- No. The act gives a binding part only to planning documentation. A study is a planning basis, not one of the five levels of documentation (§ 16 ods. 1, § 18 ods. 4 and 7).
- Who pays for a land-use study?
- The planning authority bears the cost. It may require full or partial repayment from the person whose initiative or need caused the procurement (§ 27 ods. 4).
- How much does a land-use study cost?
- The act sets no price. The cost depends on the area and the content in the assignment, so ask the authority or the qualified person that procures the study.
- Is a land-use study the same as a feasibility study?
- No. A feasibility study (štúdia realizovateľnosti) of a project is not a planning basis. The act names only technical-territorial bases and land-use studies as planning bases (§ 16 ods. 1).
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 21 ods. 1
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 11, § 13, § 14, § 16, § 18, § 24, § 27, § 28, § 31, § 34, § 39, § 40 ods. 8