Spatial Planning Act

The Spatial Planning Act (Zákon o územnom plánovaní, 200/2022 Z. z.) is the Slovak act that governs spatial plans and planning authorities.

What is the Spatial Planning Act?

The Spatial Planning Act (Zákon o územnom plánovaní, Act 200/2022 Z. z.) is the Slovak act that governs spatial planning, the powers of planning authorities and the information system for planning and construction (§ 1). Parliament passed it on 27 April 2022 and it was promulgated on 7 June 2022. It took effect in stages on 15 June 2023, 1 April 2024 and 1 April 2025 (§ 43). The current version runs from 1 March 2026.

Its title is not "zákon o územnom plánovaní a stavebnom poriadku". That was the title of act 50/1976 Zb., which the Spatial Planning Act repeals in § 41 point 1. The building procedures now sit in the Building Act 25/2025 Z. z.

Which planning documents does the act set up?

The act sets five levels of planning documentation (§ 18 ods. 4). The binding part of a higher level binds the lower level. A lower plan is invalid in any part that conflicts with a higher plan (§ 18 ods. 3).

LevelSlovak nameCoversSection
NationalKoncepcia územného rozvoja SlovenskaThe whole country§ 19
RegionKoncepcia územného rozvoja regiónuThe area of a self-governing region§ 20
MicroregionÚzemný plán mikroregiónuSeveral municipalities or another special area§ 21
MunicipalityÚzemný plán obceOne municipality§ 22
ZoneÚzemný plán zónyA part of a municipality§ 23

A municipality must have a plan. The duty ends if the whole municipality lies in a microregion plan (§ 22 ods. 1). A plan of a town is a town plan (územný plán mesta). The plan of Bratislava and Košice is a metropolitan plan. See municipal land-use plan, regional land-use plan and zonal land-use plan.

How do I read a municipal plan before buying a plot?

Read the binding part of the plan for your plot. Each plan has an informative part and a binding part. The binding part of a municipality, microregion or zone plan holds a regulatory drawing (regulačný výkres). It also holds regulatory sheets (regulačné listy) for each spatial-functional unit (§ 18 ods. 7). Check three things:

  1. The functional use. The act divides use into basic, permitted and prohibited function (§ 5 písm. g).
  2. The limits of development and the rules for the spatial arrangement of the area (§ 22 ods. 3 písm. c).
  3. The protected areas and protection zones. The plan must show them (§ 22 ods. 4).

The binding part is the basis for decisions on the building intent (§ 22 ods. 5). A plan alone does not give you a right to build. The building office also checks other conditions (25/2025, § 57 ods. 2).

Where do I find the plan and a statement for one plot?

The public part of the information system of the Office for Spatial Planning and Construction holds the planning documentation. It also holds the binding opinions (§ 25 ods. 2). The electronic extract for a chosen area is a cut of the regulatory drawing and the regulatory sheet of the unit (§ 25 ods. 12). The municipality or the region issues a paper extract if the system cannot supply it (§ 10, § 11).

For plans approved by 31 March 2024, a municipality issues a planning information (územnoplánovacia informácia) on request. It states the conditions of use and the regulations of the binding part. It is not a binding opinion (§ 40 ods. 13). For a purchase, the binding opinion is the formal test of conformity (§ 24 ods. 1). It is issued for a building intent, not for a plot alone.

What is a binding opinion of the planning authority?

A binding opinion (záväzné stanovisko) is the assessment by the planning authority. It states whether a building conforms to the binding part of the planning documentation (§ 24 ods. 1). The authority uses the lowest level that exists, from the zone plan up to the national concept (§ 24 ods. 2). The municipality is the competent authority. If the municipality has no plan, the region is competent (§ 24 ods. 4 and 5). See binding opinion.

The authority issues the opinion as an affected authority in four procedures. They are the building intent proceedings, a change of use, the review of fitness for use and the later permit. It also issues it for a notified small building with a built area over 25 m² (§ 24a ods. 1). The periods run from a complete application:

  • 30 days for notified buildings and simple buildings
  • 60 days for other buildings
  • 90 days for reserved buildings (§ 24a ods. 5)

The opinion is valid for two years from delivery. It is valid for five years for transport and technical infrastructure and some other buildings. It stays valid if the builder files the application in that period (§ 24a ods. 6). If the authority issues no opinion in time, it is inactive. The act then presumes that it has no comments and that the building conforms to the plan (§ 24a ods. 13, § 35 ods. 1 písm. a).

What if my building does not conform to the plan?

The building office refuses the application if the siting conflicts with the opinion (25/2025, § 59 ods. 1 písm. a). The builder may ask the Office for Spatial Planning and Construction to review the opinion (§ 24a ods. 8). The Office reviews it in 30 days after it receives the statement of the planning authority. If the opinion conflicts with the binding part of the plan, the Office issues a new opinion (§ 24a ods. 9). The Office does not change the plan. A change of the plan is a separate procedure (§ 33).

How does the Spatial Planning Act work with the Building Act?

The Spatial Planning Act decides whether a use fits the plan. The Building Act decides whether the building is allowed. The Building Act allows construction only in line with the binding part of the planning documentation (25/2025, § 21 ods. 1). The builder asks the planning authority for a binding opinion on the building intent (25/2025, § 20 ods. 1 písm. a). The Spatial Planning Act governs how the authority issues it (§ 24 ods. 8). A binding opinion is not a permit. The building intent decision follows it.

Before 1 April 2025 the territorial proceedings and the zoning decision came first. Since then konanie o stavebnom zámere replaces them (25/2025, § 84 ods. 11). The opinions issued by 31 March 2025 with no time limit stay valid until 31 March 2027 (§ 40e ods. 6).

Which dates matter for municipalities and plans?

DateWhat it concernsSection
31 March 2027Approval of the binding part of the national concept§ 40 ods. 7
31 March 2028Last day to announce the start of procurement of changes to documentation approved under the old rules§ 40 ods. 4
30 September 2028Approval of the binding part of the regional concepts§ 40 ods. 7
31 March 2032A municipality without a plan procures and approves one. Documentation approved by 31 March 2024 is replaced§ 40 ods. 2 and 3
1 April 2032Documentation not replaced loses validity§ 40 ods. 3

Until replacement, the old documentation stays the basis for binding opinions (§ 40 ods. 4).

If a municipality has no approved plan by 31 March 2032, a building may stand only inside its built-up area. The area is the one drawn in the cadastre on 1 January 1990. Outside it, the act allows only farming, forestry and water buildings, significant investments and infrastructure with no individual purpose (§ 40e ods. 1).

Can a municipality stop building while it prepares a plan?

Yes. The planning authority may ban or limit building in the planned area with a building closure (stavebná uzávera, § 30 ods. 1). It may declare the closure for up to 24 months from legal force. It may extend it by 12 months (§ 30 ods. 5). The closure does not cover a building that already has a favourable binding opinion (§ 30 ods. 6).

Frequently asked questions

What is Act 200/2022 Z. z.?
It is the Spatial Planning Act (Zákon o územnom plánovaní). It governs spatial plans, planning authorities and the information system for planning and construction (§ 1). It was passed on 27 April 2022 and took effect in stages from 15 June 2023.
Is the old act on spatial planning and building order still valid?
No. Act 50/1976 Zb. was repealed by the Spatial Planning Act in § 41 point 1, effective 1 April 2025. Its last version ran to 31 March 2025. Building procedures are now in Act 25/2025 Z. z.
How do I read a municipal plan before buying a plot?
Read the binding part for your plot. It has a regulatory drawing and regulatory sheets that give the functional use and the limits of development (§ 18 ods. 7). The planning authority states conformity in a binding opinion (§ 24).
Where can I find a municipal plan?
The public part of the information system of the Office for Spatial Planning and Construction holds the planning documentation (§ 25 ods. 2). The municipality issues a paper extract if the system cannot supply it (§ 11).
How long does a binding opinion take and how long is it valid?
The authority issues it in 30, 60 or 90 days from a complete application, by type of building (§ 24a ods. 5). It is valid for two years from delivery, or five years for some infrastructure (§ 24a ods. 6).
What happens if a municipality has no plan by 2032?
A building may then stand only inside the built-up area as drawn in the cadastre on 1 January 1990. Outside it, the act allows only listed exceptions such as farming and infrastructure (§ 40e ods. 1).

Sources

  1. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 1, § 5, § 10, § 11, § 18 to 25, § 30, § 33, § 35, § 40, § 40e, § 41, § 43
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 20, § 21, § 57, § 59, § 84 ods. 11
  3. Zákon č. 50/1976 Zb. o územnom plánovaní a stavebnom poriadku (stavebný zákon) · Federálne zhromaždenie ČSSR, Slov-Lex