Regional Land-Use Plan
A regional land-use plan is the planning document of one self-governing region that sets its settlement, transport and landscape structure.
What is a regional land-use plan?
A regional land-use plan is the planning document for the territory of one self-governing region (Zákon 200/2022 Z. z., § 20 ods. 1). The act calls it Koncepcia územného rozvoja regiónu. This page keeps the English name "regional land-use plan" because readers search for it. The older Slovak name územný plán regiónu belongs to the previous rules. For binding opinions the act treats a plan approved under those rules as a regional concept (§ 40 ods. 4).
The region is a samosprávny kraj. The act on self-governing regions says a vyšší územný celok (short form VÚC) is a self-governing region (Zákon 302/2001 Z. z., § 1 ods. 1). The regional concept must match the national concept, Koncepcia územného rozvoja Slovenska (200/2022, § 20 ods. 1). This page uses version 01.03.2026 of the act.
Where does it sit among the planning levels?
It is the second of five levels (§ 18 ods. 4). The binding part of a higher level binds the lower level, and a conflicting lower-level rule is invalid in that part (§ 18 ods. 3).
| Level | Document | Approved by |
|---|---|---|
| 1 | Koncepcia územného rozvoja Slovenska | Government, by regulation (§ 34 ods. 6) |
| 2 | Koncepcia územného rozvoja regiónu | Self-governing region (§ 34 ods. 7) |
| 3 | Územný plán mikroregiónu | Self-governing region (§ 34 ods. 7) |
| 4 | Územný plán obce | Municipality (§ 34 ods. 8) |
| 5 | Územný plán zóny | Municipality (§ 34 ods. 8) |
A microregion plan covers a compact part of a region, or parts of several regions, that serves the needs of several municipalities (§ 21 ods. 1). The regional concept can mark the area for which such a plan is needed (§ 20 ods. 2 písm. l).
What does a regional land-use plan decide?
The act lists what the regional concept determines (§ 20 ods. 2):
- settlement structure, landscape structure and landscape infrastructure
- transport and technical infrastructure
- amenities and cultural heritage
- protection and use of natural resources
- protection against geological hazards, floods, fires and industrial accidents
- measures for climate change
- limits, barriers and potentials for the use of land
- corridors for green infrastructure and for public-interest buildings of regional and wider importance
- the area of a microregion that needs its own plan
It does not set building limits for a single plot. That is the job of the municipal plan and the zonal plan, whose regulatory sheets carry the limits (§ 18 ods. 7).
Who prepares and approves a regional land-use plan?
The self-governing region procures, discusses and approves it (§ 10 písm. a). It approves the concept together with a generally binding regulation that declares the binding part (§ 34 ods. 7). The draft rests on a landscape-planning study (§ 31 ods. 1). The region also writes a report on the state of the concept at least once in four years (§ 10 písm. a).
The draft goes through public discussion and opinions of the Office for Spatial Planning and Construction and other bodies before approval (§ 31). A draft approved without these steps is invalid in full (§ 31 ods. 27). The approved text is published in the register of planning documents in the public part of the information system (§ 34 ods. 5).
The act sets deadlines for the first generation of regional concepts. The first landscape-planning study is due by 30 September 2027, and the binding part must be approved by 30 September 2028 (§ 40 ods. 7).
Does a regional land-use plan bind my building project?
Indirectly. Construction must follow the binding part of the planning documentation (Zákon 25/2025 Z. z., § 21 ods. 1). The planning authority checks this in a binding opinion. It checks the lowest available level first, in this order: zonal plan, municipal plan, microregion plan, regional concept, national concept (200/2022, § 24 ods. 2).
So the regional concept decides your project only when no lower plan exists. It also decides when the municipal plan does not match it. In both cases the self-governing region is the authority that issues the opinion (§ 24 ods. 5). If a municipality has a plan that matches, the municipality issues the opinion. A regional concept does not replace the municipal plan check on your plot.
What happens to older regional plans?
A planning document approved under the previous rules stays a basis for binding opinions until the authority replaces it. A regional plan of that kind counts as a regional concept for those opinions (§ 40 ods. 4). The authority must replace documents approved by 31 March 2024 by 31 March 2032. If it does not, they lose validity on 1 April 2032 (§ 40 ods. 3).
The older rules ran under the 1976 building act (zákon 50/1976 Zb.). The 2022 spatial planning act repealed it. Permits follow a separate law, the 2025 building act.
Where can I find the regional land-use plan?
The region must publish and update the approved concept (§ 10 písm. j). It appears in the register of planning documents. That register is in the public part of the information system on the website of the Office (§ 25 ods. 2, § 34 ods. 5). The region issues a paper extract from the binding part when the system cannot supply one (§ 10 písm. l).
How does a regional plan differ from a municipal plan?
| Point | Regional concept | Municipal plan |
|---|---|---|
| Area | The territory of the self-governing region (§ 20 ods. 1) | The territory of the municipality (§ 22 ods. 1) |
| Approved by | The region (§ 34 ods. 7) | The municipality (§ 34 ods. 8) |
| Binding part | Binds municipal and zonal plans | Binds zonal plans and permits (§ 22 ods. 5) |
| Regulatory sheets | None are named for this level | Yes, for each unit (§ 18 ods. 7) |
Read the municipal land-use plan to see what you may build on a plot.
Frequently asked questions
- What is a regional land-use plan and who prepares it?
- It is the planning document for one self-governing region, called Koncepcia územného rozvoja regiónu in the act (200/2022, § 20 ods. 1). The self-governing region procures and approves it (§ 10 písm. a).
- What does VÚC mean?
- VÚC is the older short form of vyšší územný celok, which the law defines as a samosprávny kraj, a self-governing region (Zákon 302/2001 Z. z., § 1 ods. 1). The spatial planning act uses the term samosprávny kraj.
- How does a regional land-use plan differ from a municipal land-use plan?
- The regional concept covers a whole region and sets its structure, such as settlement, transport and landscape (§ 20 ods. 2). The municipal plan covers one municipality and sets use and building limits for each unit (§ 22, § 18 ods. 7). The municipal plan must match the regional concept.
- Is a regional land-use plan binding on my building project?
- Only in part. The planning authority checks the lowest available plan first, so the regional concept decides when no lower plan exists or when the municipal plan conflicts with it (§ 24 ods. 2 and 5). In both cases the region issues the binding opinion.
- Who approves and publishes a regional land-use plan?
- The self-governing region approves it with a generally binding regulation (§ 34 ods. 7) and publishes it in the register of planning documents (§ 34 ods. 5, § 10 písm. j).
Sources
- Zákon č. 200/2022 Z. z. o územnom plánovaní a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 10, § 18, § 20, § 21, § 24, § 25, § 31, § 34, § 40
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 21 ods. 1 a 5
- Zákon č. 302/2001 Z. z. o samospráve vyšších územných celkov (zákon o samosprávnych krajoch) · Národná rada Slovenskej republiky, Slov-Lex · § 1 ods. 1