Building Act
The Building Act (Stavebný zákon, 25/2025 Z. z.) is the Slovak act that governs how buildings are prepared, built, used and removed.
What is the Building Act?
The Building Act (Stavebný zákon, Act 25/2025 Z. z.) is the Slovak act that governs how buildings are prepared, built, used and removed. It applies from 1 April 2025. Parliament passed it on 5 February 2025 and it was promulgated on 19 February 2025. Article I, the building rules, applies from 1 April 2025 and the rest of the act took effect on 15 March 2025.
The full title is "Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon)". The title "zákon o výstavbe" belongs to a different act, the repealed Construction Act (2022).
Where can I read the current text of the Building Act?
The current text is on Slov-Lex, the official legal portal. The static pages are informative and the PDF is the binding text. Slov-Lex lists these versions of Act 25/2025:
| Version in force | Amending act |
|---|---|
| 15 March 2025 to 31 March 2025 | Promulgated text |
| 1 April 2025 to 16 April 2025 | None |
| 17 April 2025 to 31 October 2025 | 77/2025 |
| 1 November 2025 to 31 December 2026 | 144/2025 and 269/2025 |
| From 1 January 2027 | 243/2026 |
On 1 November 2026 the text in force is the version of 1 November 2025. This page describes that text. It names the changes of 2027 in a separate section.
Which earlier acts did it replace?
Act 50/1976 Zb. held the building procedures until 31 March 2025. Slov-Lex shows that act as repealed by the Spatial Planning Act 200/2022 Z. z., not by the Building Act. Section 86 of the Building Act repeals act 201/2022 Z. z. on construction. That act was due to start on 1 April 2025. The Building Act repealed it on that day.
How did the names of the procedures change?
Section 84 ods. 11 says which new term replaces which old term where another law still uses the old one.
| Old term (until 31 March 2025) | Current term | Slovak |
|---|---|---|
| Territorial proceedings | Building intent proceedings | konanie o stavebnom zámere |
| Building proceedings | Project verification | overenie projektu stavby |
| Final inspection proceedings | Final inspection | kolaudácia |
| Binding opinion on the territorial proceedings | Binding opinion on the building intent | záväzné stanovisko k stavebnému zámeru |
| Binding opinion on the building proceedings | Declaration of compliance | doložka súladu |
The table maps terms. It does not say that old and new steps are identical. The act has no step called building permit (stavebné povolenie). A builder builds on a project verified in the building intent proceedings, or on a notification (§ 25). The building permit now matters only for cases started under the old rules. See building intent proceedings and building intent decision.
Does the new act still have two stages?
Yes, but under new names. The building intent decision comes first and the project verification second. The building office may do both at once if the builder files compliance clauses from the affected authorities with the application (§ 57 ods. 3). If the application already contains the project, the office verifies it with the decision (§ 65 ods. 2). It does not do so if the project needs rework.
Which buildings need a decision, a notification or neither?
Every building needs a building intent decision unless the act says otherwise (§ 18 ods. 2). The building intent decision (rozhodnutie o stavebnom zámere) ends the building intent proceedings.
- A small building (drobná stavba) needs a notification (ohlásenie) to the building office. An example is a ground-floor shed or garage up to 50 m² built area and 5 m high (§ 2 ods. 4 písm. a, § 18 ods. 3).
- Maintenance needs a notification if it could affect stability, fire safety, the look from public space or the environment (§ 18 ods. 4 písm. c).
- Routine maintenance needs neither, for example a facade repair or new roof covering, windows and doors (§ 18 ods. 5 písm. a).
Do I need a permit for a paved area?
The act lists paved areas up to 40 m² as an exterior work (vonkajšia úprava, § 2 ods. 9 písm. d). Such a work needs a notification only if one of the conditions in § 18 ods. 3 applies. One condition is work on a public space and another is work in a protected area. Otherwise it needs neither a decision nor a notification (§ 18 ods. 5 písm. k). From 1 January 2027 the limit is 50 m² (Act 243/2026, Art. I point 24).
What time limits does the act set?
The act sets a period for most steps.
| Step | Time limit | Section |
|---|---|---|
| Notification | 30 days from delivery | § 63 ods. 6 |
| Building intent decision | 30 days without a hearing or site inspection, otherwise 60 days, and 90 days in listed cases such as reserved buildings | § 58 ods. 1 and 2 |
| Validity of the decision | 2 years from legal force, 3 years for linear and reserved buildings | § 61 ods. 1 |
| Project verification | 30 days | § 65 ods. 2 |
| Final inspection | Date within 7 working days, inspection within 30 days of the notice, certificate within 15 days of the inspection | § 66 ods. 3 and 7 |
A reserved building (vyhradená stavba) is a technically demanding or structurally unusual building (§ 2 ods. 8). The periods of the decision run from the day the application is complete. See reserved structure.
Do offices have to decide faster under the new act?
The act sets a period for each step, as the table shows. An affected authority has 30 days for a binding opinion, or 60 days for a complex building (§ 21 ods. 9). If it issues no opinion, the act presumes it has no comments, unless a special act says otherwise (§ 21 ods. 9). For a planning authority the Spatial Planning Act says the building conforms to the plan if the authority is silent (200/2022, § 35 ods. 1 písm. a).
How do I get approval for a family house?
The act describes these steps for a building that needs a decision:
- A designer prepares the building intent. The office refuses an application without one (§ 57 ods. 2 písm. g, § 59 ods. 1 písm. b).
- The builder or the designer shares the documents in the information system. They ask the planning authority and the affected authorities for binding opinions (§ 20 ods. 1).
- The builder applies for the building intent decision. The office decides in 30, 60 or 90 days (§ 58).
- The builder applies for project verification and attaches the compliance clauses (§ 65 ods. 2).
- The builder builds only to the verified project (§ 25) and ends with the final inspection (§ 66).
The act defines four levels of project documentation: building intent, building project, building project for notification and detailed design. The detailed design (vykonávací projekt) is compulsory for a reserved building (§ 9 ods. 1 and 5). The act holds no fee list. Fees come from another act, which this page does not cover.
Who may design a house under the act?
A house with up to three flats is a simple building (jednoduchá stavba). It has a built area up to 300 m² and up to two above-ground floors (§ 2 ods. 6 písm. a). Designing a simple building is not a reserved activity. Two exceptions apply: a residential building with more than three flats and a building used by the public (§ 34 ods. 4). Besides authorised designers, a person with a university degree in architecture, civil engineering, mechanical or electrical engineering may do this work. So may a person with a secondary technical education and three years of practice (§ 34 ods. 5). Construction supervision is a reserved activity (§ 34 ods. 2).
Which authorities apply the act and how does it link to spatial planning?
The building office (stavebný úrad) is the municipality, acting as delegated state administration (§ 15 ods. 1). The regional office hears appeals against its decisions (§ 14 ods. 1). The Office for Spatial Planning and Construction runs the information system that stores the building documentation (§ 8 ods. 3, § 13). See building office.
The act allows construction only in line with the binding part of the spatial planning documentation (§ 21 ods. 1). The builder or the designer first asks the planning authority for a binding opinion (§ 20 ods. 1 písm. a). The Spatial Planning Act 200/2022 Z. z. governs that opinion. A municipal land-use plan is one kind of spatial planning document (§ 22 of that act).
How does the final inspection work?
A finished building may be used permanently only after the final inspection (kolaudácia). The act requires it for a new building and for a change to a finished building (§ 66 ods. 1). The builder attaches the energy certificate when the building must have one (§ 66 ods. 2 písm. j). The office checks, among other things, that the building is safe and its technical systems work. It also checks that the building meets the required energy performance (§ 66 ods. 4).
If it does, the office issues a final inspection certificate (kolaudačné osvedčenie, § 66 ods. 7). The old rules ended the final inspection with a decision, the kolaudačné rozhodnutie (§ 84 ods. 5). See occupancy approval.
What happens to a building built without a permit?
Works done without a verified project, or against it, are unpermitted works (nepovolené stavebné práce, § 28 ods. 1). For buildings from the time of the old act, two old-rules procedures remain. The owner may apply for a review of fitness for use (preskúmanie spôsobilosti stavby na užívanie) by 31 March 2029. A building that does not qualify for that review may get a later permit (dodatočné povolenie). The owner applies from 1 April 2025 to 31 March 2029 (§ 84 ods. 7).
Does the old act still apply?
Yes, for older cases. The old rules apply to submissions delivered to the building office by 31 March 2025. They also apply to proceedings started by that date (§ 84 ods. 4). Where a territorial decision exists under the old rules, those rules also cover later building permit and final inspection applications (§ 84 ods. 5). Paper filing is allowed until 31 March 2029, and a natural person may file on paper after that date (§ 84 ods. 15).
What changes on 1 January 2027?
Act 243/2026 Z. z. was promulgated on 7 October 2026. It takes effect on 15 November 2026. Articles I to XIII apply from 1 January 2027 (Art. XV). Article I changes the Building Act. Four changes matter for a builder.
- The definition of a building (stavba) in § 2 changes. A building is joined to the ground by a foundation or by attachment to a foundation, another building or an anchor in the ground.
- The notification rules in § 18 change. A solar power plant from 50 kW to 300 kW needs a notification if it is an alteration. A heat or cold plant from renewable sources in the same range also needs one.
- The date in § 84 ods. 7 moves from 31 March 2029 to 31 December 2040.
- A building intent decision is also needed to legalise some works. These are alterations and similar works done from 1 April 2025 to 31 December 2026 without a verified project or against it.
This page does not describe the 2027 text as law until it applies. The section numbers in § 2 shift in 2027.
Frequently asked questions
- What is Act 25/2025 Z. z.?
- It is the Building Act (Stavebný zákon), the Slovak act on preparing, building, using and removing buildings. Its full title is "Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon)". It is not called "zákon o výstavbe". That title belongs to the repealed act 201/2022 Z. z.
- Where can I find the current text of the Building Act?
- Read it on Slov-Lex, the official legal portal, under Act 25/2025 Z. z. On 1 November 2026 the version in force runs from 1 November 2025 to 31 December 2026. The PDF is the binding text. A new version from 1 January 2027 follows Act 243/2026 Z. z.
- When did the Building Act take effect?
- Article I of Act 25/2025 Z. z. applies from 1 April 2025. The rest of the act took effect on 15 March 2025. Proceedings started by 31 March 2025 continue under the old rules (§ 84 ods. 4).
- Does a building permit still exist?
- No, the act has no step called building permit (stavebné povolenie). A builder builds on a project verified in the building intent proceedings or on a notification (§ 25). The old permit still matters for cases started under the old rules (§ 84 ods. 5 and 6).
- Is the final inspection (kolaudácia) still required?
- Yes, for a new building, a change to a finished building and a landscaping work that needed a building intent decision (§ 66 ods. 1). It ends with a final inspection certificate (kolaudačné osvedčenie), not a decision (§ 67).
- Do I need a permit for a paved area?
- Not usually. A paved area up to 40 m² is an exterior work. It needs a notification only if a condition in § 18 ods. 3 applies, such as work on a public space. Otherwise it needs neither a decision nor a notification (§ 18 ods. 5 písm. k).
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2, § 9, § 18, § 20, § 21, § 25, § 28, § 34, § 57 to 67, § 84 to 86, Čl. IV
- Zákon č. 25/2025 Z. z. History of the act (versions and amendments) · Slov-Lex, Ministerstvo spravodlivosti SR
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · Čl. I bod 1 to 4, 24, 58 to 62, 224, Čl. XV
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 22, § 35 ods. 1
- Zákon č. 201/2022 Z. z. o výstavbe (zrušený) · Národná rada Slovenskej republiky, Slov-Lex · § 66
- Zákon č. 46/2024 Z. z., ktorým sa mení a dopĺňa zákon č. 50/1976 Zb. o územnom plánovaní a stavebnom poriadku (stavebný zákon) v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Národná rada Slovenskej republiky, Slov-Lex · Čl. VIII bod 12, Čl. XI
- Zákon č. 50/1976 Zb. o územnom plánovaní a stavebnom poriadku (stavebný zákon) · Federálne zhromaždenie ČSSR, Slov-Lex