Building Coverage Ratio

A building coverage ratio is a limit on the share of a plot that buildings may cover. A land-use plan sets the limit.

What is the building coverage ratio?

A building coverage ratio is a limit on the share of land that buildings may cover. A land-use plan sets it as a percentage. Slovak practice calls it index zastavanosti or koeficient zastavanosti. The decree that governs plans calls the limit regulatív zastavanosti (decree 392/2023 Z. z., § 2 písm. w).

This page covers Slovak rules only. Other countries set their own definitions under their own laws.

How do you calculate the building coverage ratio?

Divide the built area by the area of the land, then multiply by 100. The decree defines the limit as a maximum percentage of the built area against a stated area (§ 2 písm. w).

The plan chooses what the land area is. It can be the whole spatial-functional unit (priestorovo-funkčný celok), a part of it, or the plot. The decree also says the calculation must consider whether the land was already counted in another building intent. The same land cannot support two buildings at the full limit.

Example, for illustration only. A plot of 1,000 m² in a zone with a 30 percent limit allows a built area of 300 m². The 30 percent is an assumed value, not a Slovak limit.

What counts as built area?

Built area (zastavaná plocha pozemku) is the projection of all above-ground floors of a building onto the original terrain (§ 2 písm. v). It follows the outline of the building seen from above. An upper floor that overhangs the lower floor is counted by its projection.

The limit applies to buildings. The decree handles underground structures with a separate optional rule, the regulatív podzemnej stavby. It limits the built area of an underground structure and its depth (§ 2 písm. ap, § 16 ods. 3 písm. l). The decree text does not say how a plan counts paving, driveways or terraces. Ask the planning authority how your plan counts them.

Where is the building coverage limit set?

The limit sits in the binding part of a land-use plan. The municipal plan sets the manner and intensity of land use and the limits of development (zákon 200/2022 Z. z., § 22 ods. 3 písm. c). The municipal land-use plan and the zonal land-use plan both hold such regulatives.

There is no national maximum. Neither act nor the decree gives a percentage. Each plan sets its own values for each zone, so a figure quoted for one town does not apply to another.

Does every plan set a building coverage limit?

Every municipal plan and zonal plan must hold either a built-area limit or a floor-area limit. The decree lists the "regulatív zastavanosti alebo podlažných plôch" as one basic regulative (§ 16 ods. 2 písm. a, ods. 5 písm. a). A plan may therefore use only the floor area ratio.

The decree lists three more basic regulatives for a municipal plan: building height, vegetation areas and public space (§ 16 ods. 2). Older plans follow older rules. Plans approved before 31 March 2024 remain the basis for binding opinions until the authority replaces them. They lose validity on 1 April 2032 if nobody replaces them (zákon 200/2022 Z. z., § 40 ods. 3 a 4). Their wording and their values can differ from the current decree.

How do you find the limit for your plot?

Ask for the extract from the binding part of the plan. The information system gives it as a cut-out of the regulation drawing and a regulation sheet (regulačný list). The sheet belongs to the unit that holds your plot (zákon 200/2022 Z. z., § 25 ods. 12). Read the planning information glossary entry for the document itself.

The binding opinion (záväzné stanovisko) checks the building intent against the plan. The authority tests it against the lowest available level of plan, starting with the zonal plan, then the municipal plan (§ 24 ods. 1 a 2). The municipality issues the opinion. If the municipality has no plan, the self-governing region issues it (§ 24 ods. 4 a 5).

Can you exceed the building coverage limit?

No general rule lets a builder exceed it. Construction may proceed only in line with the binding part of the planning documentation (zákon 25/2025 Z. z., § 21 ods. 1). A design that breaks the limit does not match the plan, and the binding opinion records that.

The act names one deviation rule. In Bratislava and Košice an agreement linked to an investment can set deviations from the binding part of the municipal plan. Special laws set the extent (zákon 200/2022 Z. z., § 22 ods. 5).

How does it differ from the floor area ratio and the green space coefficient?

The building coverage ratio limits the footprint. The floor area ratio limits the total floor area of all floors. A tall building and a low building can have the same coverage and different floor area.

RegulativeWhat it limitsType of limit
Built area (zastavanosť)Projection of above-ground floorsMaximum percentage (§ 2 písm. w)
Floor area (podlažné plochy)Sum of floor areasMaximum percentage (§ 2 písm. z)
Vegetation areas (vegetačné plochy)Planted land on the terrainMinimum percentage (§ 2 písm. ac)

The vegetation limit is the legal base of what people call the green space coefficient. The coverage limit sets a maximum, the vegetation limit sets a minimum, and a project must meet both.

Related entry: zoning documentation.

Frequently asked questions

What is index zastavanosti?
Index zastavanosti is the common Slovak name for the limit on the share of land that buildings may cover. The decree 392/2023 Z. z. names it regulatív zastavanosti and defines it as a maximum percentage of built area against the area of a unit or plot.
How do I calculate the building coverage of my plot?
Divide the area of the building footprint by the area of the plot and multiply by 100. The footprint is the projection of all above-ground floors onto the original terrain. A plot of 1,000 m² with a 200 m² footprint has 20 percent coverage.
What is the maximum building coverage of a plot in Slovakia?
No national maximum exists. Each land-use plan sets its own value for each zone. Ask for the extract from the binding part of the plan for your plot to read the value.
Where do I find the coverage limit for my plot?
Read the regulation sheet of the spatial-functional unit that holds your plot. The extract from the binding part of the plan shows it, together with a cut-out of the regulation drawing. The municipality or the information system issues the extract.
Does an underground garage or cellar count as built area?
Built area counts the projection of above-ground floors. A plan limits underground structures with a separate optional regulative, the regulatív podzemnej stavby. Check the regulation sheet of your zone for it.
What is the difference between index zastavanosti and koeficient zelene?
Index zastavanosti sets a maximum share of land covered by buildings. Koeficient zelene is the common name for a minimum share of planted land. The decree names the second one regulatív vegetačných plôch.

Sources

  1. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky č. 392/2023 Z. z. o obsahu a spôsobe spracovania územnoplánovacej dokumentácie a o územnoplánovacích podkladoch a všeobecných požiadavkách na priestorové usporiadanie územia a funkčné využívanie územia · Úrad pre územné plánovanie a výstavbu SR, Slov-Lex · § 2 písm. v, w, x, y, z, aa, ab, ac, ap; § 16 ods. 1, 2, 3, 5
  2. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 2 písm. j, § 18 ods. 1 a 2, § 22 ods. 3 a 5, § 24 ods. 1, 2, 4, 5, § 25 ods. 12, § 40 ods. 3 a 4
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 21 ods. 1