Green Space Coefficient

A green space coefficient is a plan limit that sets the minimum share of a plot or zone that must stay vegetated ground.

What is the green space coefficient?

A green space coefficient is a limit in a land-use plan that sets the minimum share of a plot or zone covered by vegetation on the ground. The Slovak term is koeficient zelene, also written index zelene. Czech users write koeficient zeleně.

The national decree does not use these names. It calls the limit regulatív vegetačných plôch, the vegetation area regulative. It defines this regulative as a minimum percentage of vegetation areas on terrain. The base is the whole spatial-functional unit, a part of it, or the plot (decree 392/2023 § 2).

No act sets one national percentage. The plan for each municipality or zone sets the number. The plan text for your plot gives the figure.

Where does the green space coefficient come from in law?

The Spatial Planning Act, zákon č. 200/2022 Z. z., says planning documents set conditions and regulatives for spatial arrangement and land use (§ 18 ods. 1). It defines a regulative as a text, number or graphic parameter or limit for construction (§ 5).

The Spatial Planning Office issued decree 392/2023 Z. z. under the act. Its § 16 lists the regulatives a plan contains. The vegetation area regulative is a basic regulative. A basic regulative is always part of the plan.

  • A municipal plan (územný plán obce) always contains it, together with the building coverage, building height and public space regulatives (§ 16 ods. 2).
  • A zone plan (územný plán zóny) always contains it, together with the building coverage or floor area, height, public space, street line and building position regulatives (§ 16 ods. 5).

Read the municipal land-use plan and the zonal land-use plan entries for how these plans relate.

How is the green space coefficient measured?

The decree defines a vegetation area as an area that holds or receives green infrastructure elements or landscape infrastructure elements (§ 2). Green infrastructure is a system of existing and planted vegetation and water elements.

The coefficient is a percentage. Divide the vegetation area on terrain by the total area of the unit or plot. A plot with 300 m² of vegetation on terrain out of 1,000 m² has a share of 30 percent. These numbers are an arithmetic example only, not a limit from any plan.

The decree says "on terrain" (na teréne). It does not say in the text we read whether a green roof over an underground structure counts. Ask the planning authority, because the plan text may add its own rule.

How is it different from the building coverage ratio?

The building coverage regulative is a maximum. The vegetation area regulative is a minimum. The decree defines building coverage as a maximum percentage share of the area built over by buildings (§ 2). The two limits are separate, so the plan can set both.

Regulative (decree 392/2023 § 2)Type of limitMeasured against
Building coverage (zastavanosť)Maximum share of area built over by buildingsUnit, part of a unit, or plot
Vegetation areas (vegetačné plochy)Minimum share of vegetation on terrainUnit, part of a unit, or plot
Permeable areas (vodopriepustné plochy)Minimum share of area that lets rain water into the groundUnit, part of a unit, or plot

One limit does not equal 100 percent minus the other. Paved yards, paths and parking count as neither building nor vegetation. A plot can meet one limit and fail the other. See building coverage ratio.

The floor area is a third limit. The regulative of floor areas is a maximum share of the floor area of all floors against the area of the unit or plot (§ 2). See floor area ratio. People often search these limits together as index zastavanosti a koeficient zelene.

What are the eco-index and the permeable area regulative?

The eco-index (ekoindex) is a vegetation regulative that also weighs the quality of the vegetation area by its effect on its surroundings (decree 392/2023 § 2). It is an optional regulative only in the metropolitan plans of Bratislava and Košice (§ 16 ods. 4).

The permeable area regulative (regulatív vodopriepustných plôch) is a separate optional limit. It is a minimum share of area that lets rain water pass into the ground (§ 2, § 16 ods. 3 písm. m and ods. 6 písm. g). A plan may use it next to the vegetation limit.

How does the coefficient affect a building permit?

The planning documentation is a binding basis for the decision on a building intent (stavebný zámer) under the Building Act (zákon č. 200/2022 § 18 ods. 2). The binding part of a municipal plan binds the decision on a building intent (§ 22 ods. 5).

The planning authority assesses whether the building intent complies with the binding part of the plan. It does so in a binding opinion (záväzné stanovisko, § 24). Since 1 April 2025 the building act zákon č. 25/2025 Z. z. names the old zoning procedure konanie o stavebnom zámere (§ 84 ods. 11). Read building intent decision for the steps.

We found no rule in the acts that the check of vegetation share is a separate step. It is part of the compliance assessment against the plan.

Where can you find the coefficient for your plot?

The binding part of the plan holds the figure. It contains a regulatory drawing (regulačný výkres) and a regulatory sheet (regulačný list) for each spatial-functional unit (zákon č. 200/2022 § 18 ods. 7).

An electronic extract from the binding part of the planning documentation shows the binding conditions for a selected area (§ 25 ods. 12). It consists of a cut-out of the regulatory drawing and the regulatory sheet of the unit. Where the information system cannot supply it, an authority issues it on paper.

The municipality issues the paper extract in its area, and the region does the same in its area (§ 10, § 11). The municipality is also the planning authority for the binding opinion. If the municipality has no plan, the region issues it (§ 24 ods. 4 and 5).

A municipality without a plan must adopt one by 31 March 2032 (§ 40 ods. 2). See buildability of land and building plot.

Can Bratislava and Košice change the limits?

Yes, in part. Bratislava and Košice may set special conditions for spatial arrangement by a generally binding ordinance (všeobecne záväzné nariadenie). They may also decide that the limit of a basic regulative does not apply to a chosen unit (zákon č. 200/2022 § 39 ods. 2 a 3).

For other municipalities, the act gives no such power in the text we read. The limit in the plan applies.

Frequently asked questions

What is the difference between index zastavanosti and koeficient zelene?
Index zastavanosti is a maximum share of the plot covered by buildings, and koeficient zelene is a minimum share covered by vegetation on terrain. The decree defines the building coverage regulative as a maximum and the vegetation area regulative as a minimum (decree 392/2023 § 2). The two limits are separate. Paved areas count as neither.
Is there a national minimum green space coefficient in Slovakia?
No. We found no act or decree that sets one national percentage. The decree requires every municipal plan and zone plan to contain a vegetation area regulative (decree 392/2023 § 16 ods. 2 and 5). The plan sets the number.
Where do I find the koeficient zelene for my plot?
Read the regulatory sheet of the spatial-functional unit that holds your plot, in the binding part of the municipal or zone plan (zákon č. 200/2022 § 18 ods. 7). An electronic extract from the binding part shows the drawing cut-out and the sheet (§ 25 ods. 12).
What is the ekoindex?
The ekoindex is a vegetation regulative that also weighs the quality of the vegetation area (decree 392/2023 § 2). It is an optional regulative only in the metropolitan plans of Bratislava and Košice (§ 16 ods. 4).
Does a green roof count toward the coefficient?
The decree counts vegetation areas on terrain (decree 392/2023 § 2). The text we read does not say whether a green roof counts, so ask the planning authority and check the plan text.
Does the green space coefficient affect my building permit?
Yes, through the compliance check against the plan. The planning authority assesses the building intent against the binding part of the plan in a binding opinion (zákon č. 200/2022 § 24). The plan is a binding basis for the decision (§ 18 ods. 2).

Sources

  1. Zákon č. 200/2022 Z. z. o územnom plánovaní a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 5, 10, 11, 18, 22, 24, 25, 39, 40
  2. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky č. 392/2023 Z. z. o obsahu a spôsobe spracovania územnoplánovacej dokumentácie a o územnoplánovacích podkladoch a všeobecných požiadavkách na priestorové usporiadanie územia a funkčné využívanie územia · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 2, § 16
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 84 ods. 11