Building Plot

A building plot is a part of the territory that the spatial plan designates for building, or a plot that already carries a building.

What is a building plot?

A building plot (stavebný pozemok) is a part of the territory that the plan designates for building, or a plot with a building on it. The Building Act (25/2025 Z. z.) gives this definition in § 7 ods. 1. It applies since 1 April 2025 and replaces the rules of the repealed 1976 act.

The status has two sources. Either the plan designates the land for building, or a building already stands on it. See municipal land-use plan and zonal land-use plan.

Is a building plot a land type in the cadastre?

No. The cadastre sorts land into 11 types, for example arable land, gardens, forest land, built-up areas and yards, and other areas (162/1995 § 9). None is called "building plot". A plot recorded as arable land can lie in an area that the plan designates for building. The cadastre also records the land use method, which expresses the purpose of use (461/2009 § 19 ods. 1). It does not replace the plan.

Can agricultural or forest land become a building plot?

Yes, but two steps are needed. The plan designates the land for building, and the competent authority decides on withdrawal from agricultural or forest use.

  • Agricultural land. A plan proposal that uses agricultural land needs the approval of the agricultural land authority before the plan is approved (220/2004 § 13 ods. 2). Building on such land needs a decision on withdrawal (rozhodnutie o odňatí, § 17 ods. 1). If the municipality has no plan, the authority may consent to an individual proposal. The consent is valid three years unless it states longer (§ 15). The cadastre records the change of land type on the basis of a final decision, a binding opinion or an opinion of the authority, plus a geometric plan (§ 12 ods. 1).
  • Forest land. The forest authority decides on temporary or permanent withdrawal (vyňatie). Permanent withdrawal is a permanent change of land type (326/2005 § 5 ods. 1 and § 7 ods. 1 písm. a).

The two laws use two words. Agricultural land is "odňatie", forest land is "vyňatie". The new land type is whatever the decision and the geometric plan state. A levy applies to agricultural land (220/2004 § 12 ods. 2 písm. l). The amount depends on the soil quality code.

What must a plot have before a building is approved?

The act does not list required utilities for a plot. It lists grounds for refusing an application (25/2025 § 59 ods. 1). Two concern the plot:

  • The building has no access from a public road of sufficient capacity for the operator, users and visitors (písm. e).
  • A utility owner states that the building cannot connect to public water, public sewer or the electricity grid at that place (písm. f).

The second ground does not apply to a building that needs no connection or when the networks are not within reach. A well or a septic tank therefore does not by itself block approval. See utility connections. The same section refuses the application when the siting conflicts with the binding opinion of the planning authority (písm. a).

What rights to the plot does a builder need?

The builder (stavebník) must own the plot or hold another right to it. The act names four rights besides ownership. They are a contract that allows building, an easement attached to the land, a right from another law, and a right from a concession contract (25/2025 § 29 ods. 1). A right recorded in the cadastre needs no further proof (§ 29 ods. 2 písm. a). The same rule covers land owned by the state or a municipality. The builder then needs one of the listed rights, for example a contract. See easement.

Who owns the neighbouring plot?

The act defines the neighbouring plot (susedný pozemok) as a plot that shares a boundary with the plot where works are proposed. A plot without a shared boundary also counts. That applies if the planned building or its operation can directly affect the current use of that plot or its building. A neighbouring building is a building on a neighbouring plot (25/2025 § 7 ods. 2 and 3).

Is a building plot the same as a building permission?

No. The status of the plot does not authorise building. The authority decides on the building intent (building intent decision). It refuses the application on the grounds in 25/2025 § 59 ods. 1 and otherwise decides under § 60 ods. 1. See also buildability of land, which covers the checks on a whole plot.

What should I check on a plot before I buy it for a house?

  1. Read the spatial plan and ask the planning authority for a binding opinion on your project (200/2022 § 24).
  2. Read the ownership sheet for land type, rights and the built-up area (land registry extract). See cadastre of real estate.
  3. Ask the utility owners whether the plot can connect, and check access from a public road.
  4. Check protection zones and any building moratorium.
  5. Plan for surveys. The builder arranges geodetic and engineering-geological surveys unless the contract with the designer says otherwise (25/2025 § 30 ods. 2).

The full list is in buildability of land and site due diligence.

Frequently asked questions

What is a building plot?
A building plot is a part of the territory that the plan designates for building, or a plot with a building on it. The Building Act gives this definition in § 7 ods. 1. It is a legal status and not a cadastre land type.
Is a building plot a land type in the cadastre?
No. The cadastre has 11 land types and none is called building plot (162/1995 § 9). The status comes from the spatial plan or from an existing building.
Can arable land become a building plot?
Yes. The plan must designate the land for building and the agricultural land authority must issue a decision on withdrawal (220/2004 § 17 ods. 1). The decision and a geometric plan are the basis for the new land type in the cadastre.
Does a building plot need water, sewer and electricity?
Not as a fixed list. The authority refuses an application if a utility owner states that the building cannot connect. It also refuses if the access road is too small (25/2025 § 59 ods. 1 písm. e and f). The refusal does not apply if no connection is needed or the networks are not within reach.
What should I check before buying a plot for a house?
Read the spatial plan, ask for a binding opinion and read the ownership sheet. Then check access, utility connection and protection zones. Plan for geodetic and geological surveys, which the builder arranges unless agreed otherwise (25/2025 § 30 ods. 2).
Can I build on land I do not own?
Yes, if you hold one of the rights the act lists, for example a contract that allows building or an easement (25/2025 § 29 ods. 1). A right recorded in the cadastre needs no further proof (§ 29 ods. 2 písm. a).

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky · § 7, § 29, § 30 ods. 2, § 59 ods. 1, § 60 ods. 1
  2. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky · § 5 písm. j), § 18 ods. 2, § 24, § 24a, § 30, § 40, § 40e
  3. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada Slovenskej republiky · § 8, § 9
  4. Vyhláška Úradu geodézie, kartografie a katastra Slovenskej republiky č. 461/2009 Z. z., ktorou sa vykonáva zákon č. 162/1995 Z. z. (katastrálny zákon) · Úrad geodézie, kartografie a katastra Slovenskej republiky · § 19 ods. 1
  5. Zákon č. 220/2004 Z. z. o ochrane a využívaní poľnohospodárskej pôdy a o zmene zákona č. 245/2003 Z. z. · Národná rada Slovenskej republiky · § 12 ods. 1, § 13 ods. 2, § 15, § 17 ods. 1, 2 a 14
  6. Zákon č. 326/2005 Z. z. o lesoch · Národná rada Slovenskej republiky · § 5 ods. 1, § 7 ods. 1