Protection Zone
A protection zone is a strip of land around a line, facility or site where a special act limits building and other activity.
What is a protection zone?
A protection zone (Slovak: ochranné pásmo) is a strip of land around a line, a facility or a protected site where the law limits building and other activity. Each special act defines its own zone.
The railway act describes the zone as the space on both sides of the railway, set to protect the railway, its operation and its traffic (zákon č. 513/2009 Z. z., § 5 ods. 1). The energy act describes the zone as the space next to the equipment, set to keep it running and to protect life, health and property (zákon č. 251/2012 Z. z., § 43 ods. 1). The heritage act sets its zone around a monument, a heritage reserve or a heritage zone, to protect and guide the setting (zákon č. 49/2002 Z. z., § 18 ods. 1).
The owner keeps the land. The zone limits what the owner may build, plant or dig. The Building Act (zákon č. 25/2025 Z. z.) does not set zones. It makes the authority or operator behind each zone take part in the building procedure (§ 20 and § 21).
Does a protection zone make a plot unbuildable?
No. Most zones ban some activities and allow others with consent, an exemption or a binding opinion. Some acts list the ban without a consent route. The water-pipe strip is one: earthworks, structures, permanent planting and terrain changes are banned there (zákon č. 442/2002 Z. z., § 19 ods. 5).
| Zone | Who must agree | Act and section |
|---|---|---|
| Road | The road authority may allow an exception to the ban by a binding opinion. The request goes in at the preparatory documentation stage. | 135/1961 Zb., § 11 ods. 2 and 5 |
| Railway | The railway operator consents and the special building authority gives a binding opinion, for the activities the act lists. | 513/2009 Z. z., § 6 ods. 1 |
| Electricity | The system operator consents to building, changing or removing a structure. | 251/2012 Z. z., § 43 ods. 14 |
| Gas | The network operator consents to building, changing or removing a structure. | 251/2012 Z. z., § 79 ods. 5 |
| Forest | The state forestry authority gives a binding opinion. See forest protection zone. | 326/2005 Z. z., § 10 ods. 2 |
For a permitted structure, the operator gives its consent inside its binding statement (záväzné vyjadrenie) in the building procedure (§ 43 ods. 14 and § 79 ods. 5). Other authorities give a binding opinion to the building intent (zákon č. 25/2025 Z. z., § 21 ods. 3).
How wide are protection zones?
The width depends on the act, the structure and the size or voltage. The table lists distances that the acts fix. Every row is a statutory figure, read in the version named in the references.
| Zone | Distance in the act | Act and section |
|---|---|---|
| Motorway and higher-class roads, outside built-up area | 50 to 100 m from the axis of the adjacent carriageway. The exact width per class comes from an implementing decree. | 135/1961 Zb., § 11 ods. 1 |
| Lower-class roads and local roads, outside built-up area | 15 to 25 m from the road axis. The exact width per class comes from an implementing decree. | 135/1961 Zb., § 11 ods. 1 |
| Railway | 60 m from the axis of the outermost track, at least 30 m from the outer boundary of the railway perimeter, unless the building intent decision sets otherwise | 513/2009 Z. z., § 5 ods. 3 písm. a |
| Other track railways and ground cable railways | 15 m from the axis of the outermost track | 513/2009 Z. z., § 5 ods. 3 písm. b |
| Overhead electric line, 1 kV to 35 kV | 10 m from the outer conductor for bare conductors, 4 m for conductors with basic insulation, 1 m for a suspended cable | 251/2012 Z. z., § 43 ods. 2 písm. a |
| Overhead electric line, above 35 kV | 15 m (to 110 kV), 20 m (to 220 kV), 25 m (to 400 kV), 35 m (above 400 kV) | 251/2012 Z. z., § 43 ods. 2 písm. b až e |
| Underground electric line | 1 m from the outer cable up to 110 kV, 3 m above 110 kV | 251/2012 Z. z., § 43 ods. 7 |
| Outdoor electric substation | 10 m from the fence or boundary below 110 kV, 30 m at 110 kV and above. An indoor substation: the fence or the building line. | 251/2012 Z. z., § 43 ods. 9 |
| Gas pipeline | Each side of the axis: 4 m to DN 200, 8 m for DN 201 to 500, 12 m for DN 501 to 700, 50 m above DN 700, 1 m for a distribution pipe inside a built-up area below 0.4 MPa | 251/2012 Z. z., § 79 ods. 2 |
| Public water supply and sewer pipe, outside built-up area | 1.8 m from the pipe axis up to 500 mm diameter, 3.0 m above 500 mm | 442/2002 Z. z., § 19 ods. 2 |
| Forest | 50 m from the boundary of forest land | 326/2005 Z. z., § 10 ods. 1 |
| Cemetery | Set by municipal ordinance, at most 50 m from the cemetery boundary | 131/2010 Z. z., § 15 ods. 7 |
| Monument, heritage reserve, heritage zone | No fixed distance. The heritage office draws the area in its decision. | 49/2002 Z. z., § 18 ods. 2 |
The gas act also sets a separate safety zone (bezpečnostné pásmo), up to 250 m for some equipment (§ 80). In it too, building needs the consent of the network operator (§ 80 ods. 4). Details for each type are on the pages for road, railway and utility zones.
How do I find out whether my plot is in a protection zone?
Ask the owner or operator of the line, and check the municipal land-use plan and the zoning documentation. The municipal plan must show protection zones set under special acts (zákon č. 200/2022 Z. z., § 22 ods. 4).
For public water and sewer pipes, the owner or operator must answer within 30 days. The answer says whether the plan conflicts with the protection strip (zákon č. 442/2002 Z. z., § 19 ods. 7). The cadastre can also help. Sometimes a structure stands in a gas protection or safety zone without the operator's consent. Then the gas permit holder may ask the cadastre to enter a note on the property (zákon č. 251/2012 Z. z., § 79 ods. 5 and § 80 ods. 4).
Measure from the right point. The acts measure from different places, such as the track axis, the outer conductor, the fence or the forest boundary. Use the survey of a licensed surveyor for a plot near a limit.
What happens if I build in a protection zone without consent?
The building inspectorate must order the removal of a structure built in the protection or safety zone of energy equipment without the operator's consent or against its conditions (zákon č. 25/2025 Z. z., § 74 ods. 8 písm. e). For electricity, the person who built without consent must remove the structure at their own cost. If that person is unknown or refuses, the operator may remove it (zákon č. 251/2012 Z. z., § 43 ods. 15).
For roads, the road authority may order the owner to remove or change a structure, a tree or a shrub in the zone (zákon č. 135/1961 Zb., § 11 ods. 3). Compensation is paid only for a structure that stood before the zone was set. Another structure is paid for only if it was built under conditions set in its permit, and the permit does not exclude compensation. Other structures are removed without compensation.
Do small works in a protection zone need a notification?
In some zones, yes. A minor structure or a small alteration needs notification to the building office in two cases. The first is works in the protection zone of a protected area. The second is works in the protection zone of a water source, a natural healing source or a natural mineral source (zákon č. 25/2025 Z. z., § 18 ods. 3 písm. g and i).
From 1 January 2027, the amendment 243/2026 Z. z. changes this list. It adds heritage cases to písm. g (a monument, and a building in a heritage zone when the works change the exterior). It also deletes the words "and the protection zone" from the exemptions for repair of electric, communication, gas, water and sewer lines. The condition then is only that the route does not change (čl. I bod 61, 63, 64).
What is the difference between a protection zone and an easement?
A protection zone comes from a special act or from an authority decision. An easement (vecné bremeno) obliges an owner to tolerate something, refrain from something or do something for another person. It arises from a written contract, a will, a decision of an authority or by law (zákon č. 40/1964 Zb., § 151n ods. 1 and § 151o ods. 1).
A plot may have both. A line crosses it under an easement, and its protection zone limits building around the line. See easement.
How does a heritage protection zone differ from this one?
The heritage act uses the same word, ochranné pásmo, for the area around a monument. It also declares a separate pamiatková zóna, a heritage zone. The heritage office declares the buffer by a decision that sets its area and its conditions (zákon č. 49/2002 Z. z., § 18 ods. 2). It can change or cancel the buffer when the public interest requires it (§ 20 ods. 1). The ministry declares a heritage zone (§ 17 ods. 2). The buffer protects the surroundings of a monument, reserve or zone. See heritage protection zone.
Where do cemeteries and crematoria fit in?
A municipality may set a cemetery protection zone by ordinance, up to 50 m from the cemetery boundary. The ordinance sets the rules for buildings in it (zákon č. 131/2010 Z. z., § 15 ods. 7). The owner of a plot in the zone may claim reasonable compensation for the limited use (§ 15 ods. 8).
The transitional rules cover the 50 m zone of an existing cemetery and the 100 m zone of an existing crematorium. There, only buildings approved before 1 November 2005 may be placed. Buildings built before that date stay (§ 36 ods. 3 and 4).
Frequently asked questions
- What does ochranné pásmo mean in Slovak building law?
- Ochranné pásmo is a strip of land around a line, facility or protected site where a special act limits building and other activity. Each act sets its own width and its own rules. The Building Act does not define it, but it requires the affected authority to give a binding opinion.
- Can I build in a protection zone?
- It depends on the zone. Some activities are banned, such as digging or building within the water-pipe strip. Others are allowed with the consent of the operator or a binding opinion of the authority, as for electric lines, gas pipelines, railways and forests.
- How do I know if my plot is in a protection zone?
- Ask the owner or operator of the nearby line and read the municipal land-use plan, which must show protection zones set by special acts. For a public water or sewer pipe, the operator must answer within 30 days whether your plan conflicts with the protection strip.
- How wide is the protection zone of a substation or a solar plant?
- For an outdoor electric substation it is 10 m from the fence below 110 kV and 30 m at 110 kV and above. For equipment that generates electricity, the 30 m figure of § 43 ods. 9 písm. a applies unless a special act says otherwise (§ 43 ods. 13). Whether that covers a solar plant depends on its equipment, so ask the grid operator.
- How wide is the protection zone of a road?
- Outside the built-up area it is 50 to 100 m from the axis for motorways and higher-class roads, and 15 to 25 m for lower-class and local roads. An implementing decree sets the exact width per class. The road authority may allow exceptions by a binding opinion.
- Do I get compensation for building limits in a protection zone?
- It depends on the act. The cemetery act gives the owner a claim to reasonable compensation. The road act pays for a removed structure only if it stood before the zone was set, or was built under permit conditions that did not exclude compensation.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky · § 18 ods. 3, § 20, § 21, § 74 ods. 8
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky · čl. I bod 61 až 64, 73 až 78, čl. XV
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky · § 22 ods. 4
- Zákon č. 135/1961 Zb. o pozemných komunikáciách (cestný zákon) · Národná rada Slovenskej republiky · § 11
- Zákon č. 513/2009 Z. z. o dráhach a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky · § 5, § 6
- Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky · § 43, § 79, § 80
- Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách · Národná rada Slovenskej republiky · § 19
- Zákon č. 326/2005 Z. z. o lesoch · Národná rada Slovenskej republiky · § 6 ods. 3, § 7 ods. 3 a 4, § 10
- Zákon č. 131/2010 Z. z. o pohrebníctve · Národná rada Slovenskej republiky · § 15 ods. 7 a 8, § 36 ods. 3 a 4
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu · Národná rada Slovenskej republiky · § 18
- Zákon č. 40/1964 Zb. Občiansky zákonník · Národná rada Slovenskej republiky · § 151n, § 151o