Road Protection Zone
A road protection zone is a strip beside a road outside built-up areas where activity that could endanger the road or its traffic is banned or limited.
What is a road protection zone?
A road protection zone (cestné ochranné pásmo) is a strip along a motorway, road or local road outside the built-up area. It protects the road and its traffic. Activity that could endanger either is banned or limited inside it (zákon 135/1961 Zb., § 11 ods. 1 a 2).
The zone is not a ban on all building. The act bans or limits activity that could endanger the road or its traffic, and the road authority may allow exceptions. The zone is one of several protection zones that can touch a building plot.
How wide is a road protection zone?
The width depends on the road class. The act sets a range and the implementing decree 35/1984 Zb. fixes the distance for each class. The zone runs from the axis of the carriageway, not from the edge of the pavement or the plot boundary.
| Road | Distance from the axis |
|---|---|
| Motorway and road built as an expressway | 100 m, from the axis of the adjacent carriageway |
| Class I road | 50 m |
| Class II road and local road built as an expressway | 25 m |
| Class III road | 20 m |
| Local road of class I and II | 15 m |
The act states the same ranges: 50 to 100 m for motorways and roads of higher classes, and 15 to 25 m for roads of lower classes and local roads (§ 11 ods. 1). It also says the zone applies above and below the road. On roads with separate carriageways, the decree measures from the axis of the adjacent carriageway (§ 15 ods. 3). Near a crossing with another road or a railway, the decree sets the zone by sight triangles. If that zone is narrower than the distances above, the distances above apply (§ 15 ods. 4).
The decree text dates from 1984. It names zones for motorways, roads and local roads of class I and II in § 15 ods. 1, but lists 20 m for class III roads in § 15 ods. 3. Ask the road administrator which distance applies to a class III road.
Where does a road protection zone apply?
It applies outside the continuously built-up area of a municipality. The built-up area is the one set by the valid municipal land-use plan. A municipality that does not need a plan has a zone outside its actually built-up area (§ 11 ods. 1).
The decree adds that a gap of up to 200 m generally does not break up a built-up area (§ 15 ods. 2). Inside the built-up area the road act sets no zone. Check the municipal land-use plan for the boundary.
For a new or rebuilt motorway, road or local road, the zone starts when the decision on the building intent becomes final (§ 11 ods. 1). See building intent decision.
What can I not build or do in a road protection zone?
You may not do anything that could endanger the road or the traffic on it, unless the road authority allows an exception (§ 11 ods. 2). The act lists no types of building. It uses one test: danger to the road or its traffic.
Some items are outside the limits. These are parts of the road itself, stop signs, bus stops and shelters, survey marks, and signals and mapping equipment placed so they do not reduce safety or make maintenance harder (§ 11 ods. 4).
How do I get an exception in a road protection zone?
You ask the competent road administrative authority (cestný správny orgán) for an exception. You file the request at the stage of preparatory documentation. The authority grants it by a binding statement (§ 11 ods. 2 a 5).
- The authority grants exceptions only in justified cases that do not harm public interests, especially traffic interests and the interests of the road administrator.
- It may attach conditions.
- It decides on the opinion of the road administrator and of the traffic inspectorate. For a motorway zone, it uses the opinion of the Ministry of Interior instead of the traffic inspectorate.
- The general rules on administrative procedure do not apply to the exception.
What happens to a building that already stands in the zone?
The road authority may order the owner, administrator or user to remove or change a building, structure, tree, shrub or other growth in the zone, or to change the ground surface (§ 11 ods. 3).
Compensation depends on the date. Removed buildings and equipment that stood before the zone was set are compensated. A building put up after the zone was set is compensated only if it was built under the conditions of its permit, and those conditions do not exclude compensation. The road authority sets the amount. All other buildings must be removed without compensation (§ 11 ods. 3).
Does the road protection zone make my plot unbuildable?
Not by itself. The act bans only endangering activity and allows exceptions, so a plot partly inside the zone may still hold a building outside the zone or one the authority allows. Whether the plot is buildable depends on the land-use plan and other zones too, for example a utility protection zone or a railway protection zone.
The act changes in 2027. Article II of the amendment 243/2026 Z. z. changes the road act from 1 January 2027, but it does not change § 11 (the zone rules) or the decree.
Frequently asked questions
- How far from the road can I build?
- It depends on the road class and on whether the plot is outside the built-up area. Outside it, the protection zone is 100 m from the axis for motorways, 50 m for class I roads, 25 m for class II roads, 20 m for class III roads and 15 m for local roads of class I and II (decree 35/1984 Zb., § 15 ods. 3). Inside the zone, building is not banned outright: the road authority may allow an exception.
- What is the protection zone of a class III road?
- The decree lists 20 m from the axis of the roadway (35/1984 Zb., § 15 ods. 3). The road act allows 15 to 25 m for lower classes (§ 11 ods. 1). The decree text names zones only for class I and II roads in § 15 ods. 1, so ask the road administrator to confirm the distance for your road.
- Where is the road protection zone measured from?
- It is measured from the axis of the carriageway, not from the edge of the pavement or the plot boundary. On roads with separate carriageways, it is measured from the axis of the adjacent carriageway (decree 35/1984 Zb., § 15 ods. 3).
- Can I build a house or garage in a road protection zone?
- Only with an exception from the road authority. The act bans or limits activity that could endanger the road or its traffic, and the authority may allow exceptions in justified cases by a binding statement (zákon 135/1961 Zb., § 11 ods. 2 a 5). Ask for the exception at the preparatory documentation stage.
- Does the road protection zone apply inside a town or village?
- No. The zone applies outside the continuously built-up area set by the municipal land-use plan, or outside the actually built-up area if the municipality needs no plan (zákon 135/1961 Zb., § 11 ods. 1). A gap of up to 200 m generally does not break up a built-up area (decree 35/1984 Zb., § 15 ods. 2).
- Do I get compensation if the road authority orders me to remove a building?
- Sometimes. A building that stood before the zone was set is compensated. A building put up later is compensated only if it was built under the conditions of its permit and those conditions do not exclude compensation. Other buildings go without compensation (zákon 135/1961 Zb., § 11 ods. 3).
Sources
- Zákon č. 135/1961 Zb. o pozemných komunikáciách (cestný zákon), version from 01.09.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 11 ods. 1 až 6
- Vyhláška Federálneho ministerstva dopravy č. 35/1984 Zb., ktorou sa vykonáva zákon o pozemných komunikáciách (cestný zákon), version effective 01.07.1984 · Federálne ministerstvo dopravy (Slov-Lex) · § 15 ods. 1 až 4
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 07.10.2026) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. II