Railway Protection Zone

A railway protection zone is a strip along a railway where activity that could endanger the railway or its traffic needs the operator's consent.

What is a railway protection zone?

A railway protection zone (ochranné pásmo dráhy) is the space on both sides of the railway perimeter, bounded by vertical planes at a set distance from the perimeter boundary. It protects the railway, its operation and the traffic on it (zákon 513/2009 Z. z., § 5 ods. 1).

The zone is one of several protection zones that can touch a building plot. The road protection zone follows a different act. The railway zone is not a ban on building. Some activity needs the consent of the railway operator and a binding statement of the special building office (špeciálny stavebný úrad).

How far does the railway protection zone reach?

The distance depends on the type of railway. The act sets it unless the decision on the building intent says otherwise (§ 5 ods. 3).

Type of railwayZone boundary
Railway (železničná dráha)60 m from the axis of the outermost track, and at least 30 m from the outer boundary of the railway perimeter
Other track railways and ground cable railways15 m from the axis of the outermost track
Suspended cable railway15 m from the carrying or hauling rope
Trolleybus line10 m from the outermost conductor of the overhead line

The railway perimeter (obvod dráhy) is the land the railway needs for its operation. Unless the deciding authority says otherwise, it reaches three metres from the outer edge of the railway body and of its structures and fixed equipment (§ 3 ods. 1 a 3). No zone exists where the railway runs on a road or inside a closed area of the operator (§ 5 ods. 4).

When does a railway protection zone start and end?

For a new railway, the zone starts when the decision on the building intent becomes final. It ends when the decision to cancel the railway becomes final (§ 5 ods. 2). See building intent decision.

What is banned in a railway protection zone?

Without the consent of the railway operator and a binding statement of the special building office, you may not do the following (§ 6 ods. 1):

  • place buildings, structures, overhead lines and lights that could be mistaken for railway light signals or dazzle a train driver
  • place electromagnetic equipment that disturbs the overhead line, the power supply or the signalling and communication equipment of the railway
  • place objects whose coloured surfaces could be mistaken for railway signs
  • store flammable or explosive materials, or set up dumps that could damage the railway or endanger traffic
  • do work that could damage the railway or endanger traffic, especially ground levelling, earthworks, blasting and mining work

The act does not ban building as such. The test is danger to the railway or its traffic. Structures that serve the railway fall under a special building office as well (zákon 25/2025 Z. z., § 16 ods. 1).

Can I plant trees in a railway protection zone?

Yes, with a limit. Owners and users may plant and grow trees and shrubs taller than three metres in the zone only if a fall cannot damage the railway (§ 6 ods. 2). All owners and users must keep land, trees, buildings and lines in the zone in a state that does not endanger the railway.

Who decides when I build in a railway protection zone?

The Building Act applies to structures in the zone (§ 8 ods. 1). The next rule covers structures in the zone that do not serve the railway. The railway owner or its authorised operator is a concerned legal person in the proceedings on the building intent, on the project verification and on activities in the zone (§ 8 ods. 4). Read about the building office for the general roles.

Can utility lines cross or run along a railway?

Yes, if they do not affect safe railway operation. Lines that do not serve the railway, such as power, telecom, water and sewer lines, must be designed so they do not disturb signalling, communication or traction equipment (§ 15 ods. 1). They may cross under the track body at a right angle and may run parallel to the track in the protection zone (§ 15 ods. 2).

A parallel line inside the railway perimeter needs a contract on an easement with the railway owner and a notice to the special building office (§ 15 ods. 2). See also the utility protection zone.

What if something in the zone endangers the railway?

The operator may call the owner or user to remove trees, shrubs, dumps, buildings or other structures in a set time, or to stop the work. If they do not comply, the special building office orders it on the operator's request (§ 6 ods. 3 a 4).

If the railway or its traffic is directly in danger, operator staff may enter after informing the owner, make the necessary changes and charge the cost to the owner or user (§ 6 ods. 6). A person who does forbidden or unauthorised activity in the zone of a railway commits a misdemeanor (§ 108 ods. 1 písm. a).

Does the railway protection zone limit noise from trains?

No. The railway act sets no noise limit for the zone. A noise study is the tool to check noise at a planned building near a railway. This page does not give noise limits, because none was checked against the health decree text.

Frequently asked questions

How far is the railway protection zone in Slovakia?
For a railway, it is 60 m from the axis of the outermost track, and at least 30 m from the outer boundary of the railway perimeter. Other track railways and ground cable railways have 15 m, a suspended cable railway 15 m from the rope, and a trolleybus line 10 m from the outermost conductor (zákon 513/2009 Z. z., § 5 ods. 3). A decision on the building intent may set a different distance.
Can I build a house in a railway protection zone?
Building is not banned as such. Forbidden activity needs the consent of the railway operator and a binding statement of the special building office (zákon 513/2009 Z. z., § 6 ods. 1). Ask the operator early, before you finish the project documentation.
What activities need consent in a railway protection zone?
Five groups of activity need consent (zákon 513/2009 Z. z., § 6 ods. 1). They are structures or lights that look like signals or dazzle drivers, equipment that disturbs the railway electrically, objects in signal colours, storage of flammable or explosive materials and dumps, and work such as earthworks and blasting.
Can I plant trees near a railway?
Yes. Trees and shrubs taller than three metres in the zone are allowed only if a fall cannot damage the railway (zákon 513/2009 Z. z., § 6 ods. 2). The operator may call you to remove trees that endanger the railway (§ 6 ods. 3).
Does the zone exist where a railway runs on a road?
No. If the railway runs on a road or inside a closed area of the operator, no protection zone is set (zákon 513/2009 Z. z., § 5 ods. 4).

Sources

  1. Zákon č. 513/2009 Z. z. o dráhach a o zmene a doplnení niektorých zákonov, version from 01.04.2025 · Národná rada Slovenskej republiky (Slov-Lex) · § 3, § 5, § 6, § 8, § 15, § 108
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 07.10.2026) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. II
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon), version 01.11.2025 to 31.12.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 16 ods. 1