Noise study

A noise study is an expert report that compares the noise at a building with the permitted values and shows what protection is needed.

What is a noise study?

A noise study is an expert report that compares the noise at a building with the permitted values and shows what protection is needed.

In Slovak it is a hluková štúdia. The report usually covers the noise outside the walls and the noise in the rooms. No act or decree checked for this page defines the document. The law sets the duties and the limit values. The report is the way to show them.

Does Slovak law require a noise study for a house?

No act checked for this page names a noise study as a required document for a house. The public health act 355/2007 sets duties that a noise report usually covers.

  • The builder of a home must protect the indoor environment from traffic noise and noise from other sources (§ 27 ods. 4).
  • A builder may design, place and build a home, or change a building into a home, when the builder protects the indoor rooms. The builder also protects a fair part of the outdoor space next to the building (§ 27 ods. 6).
  • The builder must show this by measuring and assessing the noise at the final inspection (kolaudácia). If no final inspection is needed, the builder shows it when the building works end (§ 27 ods. 8).
  • Only persons with the professional competence named in § 15 ods. 1 písm. a may measure the noise (§ 27 ods. 8).

The act also names two health authorities. The public health authority of the Ministry of Transport is an affected authority. It issues a binding opinion on homes. The opinion covers possible noise from motorways, expressways, class I roads, civil aviation, railways and waterways (§ 7 ods. 4 písm. b). The regional public health office issues a binding opinion on the building intent for buildings that affect healthy living or working conditions. This excludes apartment buildings that are simple structures (§ 13 ods. 3 písm. c). Read public health authority binding opinion for the process.

A noise load assessment is a listed document for one case. It goes with the request for a binding opinion. The request covers a new motorway, class I road, railway, waterway or airport with motor aircraft (§ 13 ods. 5 písm. d). That case is about the transport structure, not about the house.

What noise limits apply outside a home?

Decree 549/2007 sets the permitted values for noise outside buildings. The values depend on the category of the area, the source and the time of day. They are equivalent sound levels LAeq in dB. Day is 6.00 to 18.00, evening is 18.00 to 22.00 and night is 22.00 to 6.00 (§ 2 písm. zh).

Category of areaRoad and water transport (day / evening / night)Railways (day / evening / night)
I. Spa areas and other areas with special protection45 / 45 / 40 dB45 / 45 / 40 dB
II. In front of windows of living rooms in flats and family houses, and outdoor space in residential and recreation areas50 / 50 / 45 dB50 / 50 / 45 dB
III. Area as in II near motorways, class I and II roads, local roads with public transport, railways and airports, and city centres60 / 60 / 50 dB60 / 60 / 55 dB
IV. Areas without housing, such as production zones70 / 70 / 70 dB70 / 70 / 70 dB

The category follows the use and surroundings of the place. The decree does not give a distance from a road or railway for categories II and III. In a declared noise protection zone, the conditions in the binding opinion of the regional public health office apply outdoors (§ 4 ods. 2).

Noise from tonal sources, normal impulse sources and especially disturbing sources gets a correction of +5 dB. High impulse noise gets +12 dB (table 2).

Can a new home stand where traffic noise is above the limit?

Yes, in a defined case. Point 1.9 of the annex lets a new residential building stand where traffic noise is above the category II values. It also covers places where this is expected later. The public health authority must give its opinion. Two conditions apply.

  • The builder takes measures that protect the indoor environment.
  • Traffic noise stays within the category III values plus 5 dB. This applies to a fair part of the outdoor space next to the building, or to a rest zone near it.

The point does not cover schools, kindergartens, hospital rooms and similar buildings.

What noise limits apply inside the rooms?

Table 3 of decree 549/2007 sets the permitted levels in protected rooms. They apply to noise from inside the building and to noise from outside.

Category of roomDay / evening / night
A. Hospital rooms and patient rooms in spas35 / 30 / 25 dB
B. Living rooms, hostels, retirement homes, kindergartens and nurseries40 / 40 / 30 dB

Other categories cover classrooms, rooms for the public and rooms where people need to talk. The kindergarten and nursery values apply during use (note b).

For traffic noise in a category III area, the assessed value is reduced by 5 dB (note c of table 3). Read the decree for the other notes. The values apply together with ventilation, heating and lighting of the room (note g).

How is noise measured and assessed?

The decree sets where to assess the noise (§ 6 ods. 3).

  • Outdoors away from buildings: at a height of 1.5 m above the ground.
  • In front of an outer wall: 1.5 m from the wall and 1.5 m above the floor of the storey. The decree states tolerances.
  • Indoors: 1.5 m above the floor and at least 0.5 m from the walls. In sleeping rooms the measurement also takes place near the head position.

The measured value grows by the expanded measurement uncertainty before it is compared with the permitted value (§ 6 ods. 5). The instruments are designated meters, or calibrated meters when no designated meter exists (§ 6 ods. 2). This page found no named prediction method in the decree.

What does the technical decree say about noise protection?

Decree 532/2002 asks that a building gives comfort for sleep, rest and work. It also asks that the building resists the harmful effect of noise and vibration. The highest permitted values come from a special regulation (§ 20 ods. 1). Act 25/2025 keeps decree 532/2002 in force until the new technical decrees apply. The latest date is 31 March 2027 (§ 84 ods. 23).

The decree lists the protection that the building gives to a protected room (§ 20 ods. 2).

  • Airborne noise from outside. Read airborne sound insulation.
  • Airborne noise from another closed room in the building.
  • Impact noise. Read impact sound insulation.
  • Noise from technical equipment of the building.
  • Too much noise from reflected sound waves, called reverberation.

For traffic noise, urban planning measures come first. Measures that protect single buildings come after (§ 20 ods. 3).

Does noise from the building site count?

Yes. The building site must not burden the surroundings with too much noise or vibration. This applies most at night rest times and on rest days (act 25/2025, § 6 ods. 3 písm. i). Decree 549/2007 lowers the assessed value of building work noise by 10 dB outdoors. This applies on working days from 7.00 to 21.00 and on Saturdays from 8.00 to 13.00. Indoors the assessed value drops by 15 dB on working days from 8.00 to 19.00 (annex, points 1.7 and 2.8).

How much does a noise study cost?

This page found no public price list with a date, so it prints no price. Ask two or three acoustic consultants for a quote. Send them the site plan, the sources of noise near the plot and the rooms that face them. The scope of the quote differs when the study needs measurement on site and when it needs only a calculation.

Where does the noise study fit in the project?

The site analysis shows whether a plot sits near a road, a railway or another source. Check the road protection zone and the railway protection zone early. Do the study before the design fixes the position of bedrooms and windows.

Frequently asked questions

Is a noise study required for a house in Slovakia?
No act checked for this page names it as a required document. The public health act 355/2007 makes the builder protect the indoor environment from noise. The builder shows this by measurement at the final inspection (§ 27 ods. 4 and 8).
What noise limits apply to a family house in Slovakia?
In category II, in front of living room windows, decree 549/2007 sets 50 dB for day and evening and 45 dB for night. This holds for roads and railways. In category III the values are 60, 60 and 50 dB for roads and 60, 60 and 55 dB for railways.
Who may measure noise for a building?
Only persons with the professional competence named in § 15 ods. 1 písm. a of act 355/2007 may measure noise. This covers the proof at the final inspection (§ 27 ods. 8). Ask the consultant to show this competence.
Can I build a home near a busy road?
Yes, in a defined case. The public health authority gives an opinion, and the builder protects the indoor rooms. Traffic noise in the outdoor space next to the building stays within the category III values plus 5 dB (decree 549/2007, annex, point 1.9).
What noise level is allowed in a bedroom?
Table 3 of decree 549/2007 sets 40 dB for day and evening and 30 dB for night in living rooms. The same table has a note that reduces the assessed traffic noise by 5 dB in category III areas.
How much does a noise study cost?
This page found no dated public price list, so it gives no price. The cost depends on the scope. Ask several acoustic consultants for a quote and send them the plot plan and the noise sources near it.

Sources

  1. Zákon č. 355/2007 Z. z. o ochrane, podpore a rozvoji verejného zdravia a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 7 ods. 4 písm. b, § 13 ods. 3 písm. c, ods. 5 písm. d, § 15 ods. 1 písm. a, § 27
  2. Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 549/2007 Z. z., ktorou sa ustanovujú podrobnosti o prípustných hodnotách hluku, infrazvuku a vibrácií a o požiadavkách na objektivizáciu hluku, infrazvuku a vibrácií v životnom prostredí · Ministerstvo zdravotníctva Slovenskej republiky, via Slov-Lex · § 2 písm. zh, § 4 ods. 2, § 6 ods. 2, 3, 5, príloha bod 1.7, 1.9, 2.8, tabuľky č. 1 až 3
  3. Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia Slovenskej republiky, via Slov-Lex · § 20 ods. 1 až 3
  4. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 6 ods. 3 písm. i, § 84 ods. 23