Sunlight and daylight study

A sunlight and daylight study is a report that checks whether a building gets the sunlight and daylight the rules ask for.

What is a sunlight and daylight study?

A sunlight and daylight study is a report that checks whether a building gets the sunlight and daylight the rules ask for.

In Slovak the topic has two names. Preslnenie is sunlight in rooms and denné osvetlenie is daylight. Decree 259/2008 defines insolation as exposure to the good and bad effects of solar radiation that enters a room through openings. It defines preslnenie as the good effect of solar radiation on all parts of the indoor environment (§ 1 ods. 1 písm. x and y).

The page uses the Slovak rules that apply to a home. The study itself is the work of the designer, and it sits next to the site analysis.

Does Slovak law require a sunlight and daylight study?

No act or decree checked for this page names a sunlight study as a required document. The rules set requirements that the project meets. A report is the usual way to show it.

Act 25/2025 says a building is designed and built to meet the basic requirements for buildings and the building-technical requirements (§ 18 ods. 1). Decree 60/2025 lists the content of the building intent and of the project in annexes that this page did not read. Ask your designer which documents the office expects for your plot.

Which rules cover sunlight and daylight in a new home?

RuleWhat it says
Decree 259/2008, § 5 ods. 1 and 2Buildings are placed on the site so that flats get sunlight. The sunlight of flats is set by the Slovak standard.
Decree 259/2008, § 4 ods. 3Rooms where people stay long need adequate daylight, as Annex 3 sets.
Decree 259/2008, § 4 ods. 4A new building must not make the daylight in surrounding buildings worse than the technical standards allow.
Decree 532/2002, § 17 ods. 1The design judges daylight together with combined light, artificial light and sunlight. It counts surrounding buildings, permanent greenery and the effect of the new building on existing buildings.
Decree 532/2002, § 18 ods. 2A flat must get sunlight. A Slovak standard sets how to judge it.

Decree 259/2008 is a Ministry of Health decree under the public health act 355/2007. Decree 532/2002 sets the general technical requirements. Act 25/2025 keeps it in force until the new technical decrees apply, at the latest until 31 March 2027 (§ 84 ods. 23). This page did not find the text of those new decrees.

How many hours of sunlight must a flat get?

The decree gives no hours for flats. It says the sunlight of flats is set by the Slovak standard (§ 5 ods. 2). A footnote of the decree names that standard as STN 73 4301 Bytové budovy, which means dwelling buildings.

The hours sit in the paid text of the standard. This page did not read it, so it prints no hours. The Slovak standards office (ÚNMS) lists the 2021 edition of STN 73 4301. It replaces the June 2005 edition. Its foreword says the criteria for sunlight and daylight of flats were completed and changed. Annex B is normative and gives the methods to evaluate sunlight time.

Hours that you find on older web pages may come from the 2005 edition. Ask your designer which edition the project uses.

The decree sets two rules for pre-school rooms. The required sunlight time for day rooms counts from 10.00 to 15.00. New buildings nearby must not cut the sunlit part of the outdoor play area below 50 % of its total area (§ 5 ods. 3 and 4).

What daylight values does the decree set?

Annex 3 of decree 259/2008 sets the smallest daylight factor for rooms where people stay long, except living rooms. The factor is measured on the comparison plane.

Type of lightingSmallest daylight factor
Side lightingDmin = 1.5 %
Top and combined lightingDm = 3 %

The annex says Dm is called ep in the standards STN 73 0580-1 and STN 73 0580-2. For daylight in rooms the annex sends to these two standards. Read daylight factor for the term itself.

The decree also asks for glazing with a light transmittance of at least 0.6 in rooms where people stay long (§ 4 ods. 6). It asks for protection from direct sun where glare can occur (§ 4 ods. 5).

Which daylight standards apply now?

The decree names the standards by title and without a year. ÚNMS lists two documents.

  • STN 73 0580-1 gives the basic requirements for daylight in buildings. ÚNMS issues a new edition from 1 May 2025. It replaces the earlier assessment by daylight factor with a target daylight factor. It takes the European standard EN 17037 into account.
  • STN 73 0580-2 covers daylight in residential buildings. ÚNMS lists it as valid, released on 1 October 2000.

This page did not check how the values in Annex 3 and the 2025 edition fit together. Ask your designer which edition the office accepts.

Must a new building avoid shading its neighbours?

Yes, within a limit. A new building must not make the daylight in surrounding buildings worse than the technical standards allow (decree 259/2008, § 4 ods. 4). The design also judges the effect of the new building on existing buildings (decree 532/2002, § 17 ods. 1).

The decrees give no metres and no hours for neighbours. They send to the standards. For distances between buildings read building setback distances.

How is daylight checked in the finished building?

Daylight is checked by measurement when calculated data cannot be used (decree 259/2008, § 4 ods. 12). The measurement report states the expanded measurement uncertainty. The requirement is met when the measured value, reduced by the uncertainty, is not below the required value.

How does the study link to site analysis and house placement?

The sunlight result depends on where the house stands and on what is around it. The decree on technical requirements names surrounding buildings and permanent greenery as inputs (decree 532/2002, § 17 ods. 1). A site analysis records them. House siting and orientation changes the result. The interior lighting plan covers the artificial light that adds to daylight.

Frequently asked questions

How many hours of sunlight must a Slovak flat get?
The decree gives no number of hours. Decree 259/2008 says the sunlight of flats is set by the Slovak standard STN 73 4301 (§ 5 ods. 2). The hours are in the paid standard, so this page prints none. Ask your designer for the edition in use.
Which Slovak rule covers sunlight in living rooms and flats?
Decree 259/2008 § 5 says buildings are placed so that flats get sunlight. Decree 532/2002 § 18 ods. 2 says a flat must get sunlight. Both send to the Slovak standard STN 73 4301 for the method.
What daylight factor does Slovak law set?
Annex 3 of decree 259/2008 covers rooms where people stay long, except living rooms. It sets Dmin = 1.5 % for side lighting and Dm = 3 % for top and combined lighting. Living rooms follow the standards STN 73 0580-1 and STN 73 0580-2.
Is a sunlight and daylight study required for a house?
No text checked for this page names it as a required document. The requirements on sunlight and daylight apply to the project. A report is the usual way to show them. Ask your designer which documents the office expects.
Must a new building avoid shading its neighbours?
Yes, within a limit. A new building must not make the daylight in surrounding buildings worse than the technical standards allow (decree 259/2008, § 4 ods. 4). The decree gives no metres or hours for this.
What changed in the daylight standard STN 73 0580-1?
ÚNMS issues a new edition from 1 May 2025. It replaces the earlier assessment by daylight factor with a target daylight factor. It takes EN 17037 into account. The decree still names the standard by title only.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 18 ods. 1, § 84 ods. 23
  2. Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov a o minimálnych požiadavkách na byty nižšieho štandardu a na ubytovacie zariadenia · Ministerstvo zdravotníctva Slovenskej republiky, via Slov-Lex · § 1 ods. 1 písm. x, y, § 4 ods. 3 to 6, 12, § 5, príloha č. 3 bod a)
  3. Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia Slovenskej republiky, via Slov-Lex · § 17 ods. 1, 2, § 18 ods. 2
  4. STN 73 4301 Bytové budovy (February 2021), foreword and contents · Úrad pre normalizáciu, metrológiu a skúšobníctvo Slovenskej republiky · Predhovor, príloha B
  5. Nová norma STN 73 0580-1: Denné osvetlenie budov (news item of 4 April 2025) · Úrad pre normalizáciu, metrológiu a skúšobníctvo Slovenskej republiky · Aktualita 1303
  6. STN 73 0580-2 Denné osvetlenie budov. Časť 2: Denné osvetlenie budov na bývanie · Úrad pre normalizáciu, metrológiu a skúšobníctvo Slovenskej republiky · Katalóg noriem