Building setback distances
A building setback distance is the minimum space that a building must keep from other buildings, plot boundaries and roads.
A building setback distance is the minimum space that a building must keep from other buildings, plot boundaries and roads. The Slovak name is odstupové vzdialenosti stavieb. The figures come from § 6 of decree 532/2002 Z. z. on general technical requirements for construction. The title of § 6 in the version from 1 March 2020 is Odstupy stavieb. The Building Act 25/2025 sets no distances itself. A full-text search of the act finds no word odstup.
What are the minimum distances between family houses?
Section 6 of the decree sets these distances for family houses (rodinné domy). The decree uses that term. The Building Act 25/2025 does not use it, and § 6 does not define it. Ask the designer which buildings the figures cover.
| Distance | Value | Source |
|---|---|---|
| Between family houses that form a free space between them | At least 7 m | § 6 ods. 3 |
| From a family house to a common plot boundary | At least 2 m | § 6 ods. 3 |
| Between family houses on a constrained site, if no opposite wall part has a window of a habitable room | As little as 4 m | § 6 ods. 4 |
| From the edge of a road to a facade that has windows of habitable rooms | At least 3 m | § 6 ods. 6 |
The 3 m distance from the road does not apply to buildings placed in gaps of a row of houses (§ 6 ods. 6). The decree gives no fixed figure for buildings other than family houses. For them, § 6 ods. 1 sets general requirements.
What must a distance between buildings satisfy?
Every distance between buildings must meet many requirements (§ 6 ods. 1). The decree lists them:
- urban planning and architectural requirements,
- environmental, hygiene and veterinary requirements,
- protection of surface and underground water and protection of monuments,
- fire safety and civil protection,
- daylight, sunlight and comfort of living.
The distances must also allow maintenance of the buildings. They must keep room between the buildings for utilities and for activities that belong to the use of the area. The 7 m and 2 m figures are minimums. A design can still fail if one of these requirements is not met.
Can the distances be reduced on a narrow plot?
Yes, in two ways. First, on a constrained site the distance between family houses may fall to 4 m. This is possible only if no opposite part of the walls has a window of a habitable room. In that case the 2 m distance from the common boundary does not apply (§ 6 ods. 4).
Second, other solutions are possible. They need calculations and measurements that prove the requirements of § 6 ods. 1 are met, or they follow the zone plan (územný plán zóny) (§ 6 ods. 5). The decree names no approval step for this. For an early talk with the office, see pre-application consultation.
How are the distances measured?
Distances are measured on the shortest line between the outer surfaces of the perimeter walls. Distances to plot boundaries and road edges are measured in the same way. A protruding part of a building counts only if it protrudes more than 1.50 m from the wall (§ 6 ods. 7). A balcony or canopy that protrudes less is not counted.
Can I build on the plot boundary?
A structure may stand on the plot boundary only if it does not permanently limit the use of the neighbouring plot (§ 6 ods. 2). The decree does not mention consent of the neighbour in this paragraph.
The Building Act has a related rule about procedure. A minor structure or an alteration needs a notification in one more case. The work puts a structure or terrain works on the builder's plot closer than 2 m to the boundary (§ 18 ods. 3 písm. b). This is a trigger for notification. It is not a minimum distance. See minor structures.
How do fire safety distances work?
Fire safety distances come from decree 94/2004 Z. z. of the Ministry of the Interior on fire protection requirements for construction and use of structures. This page read the version in force from 1 January 2019, which is the latest listed on Slov-Lex. The decree defines a fire-hazard space around a building. A fire-safety distance (odstupová vzdialenosť) limits it (§ 79 ods. 1 and 4, § 80 ods. 1).
The decree says that buildings or fire compartments must stay at least the fire-safety distance apart. This stops fire from spreading from a burning building to another one (§ 79 ods. 3). The distance is set per fire compartment according to a technical standard. For residential and accommodation buildings it depends on four factors. They are the size of the fire-exposed areas and the length of the compartment. The other two are the number of floors and the type of construction unit (§ 80 ods. 3). The decree itself prints no metre value for these cases. This page did not read the standard, so it gives no figure. The designer takes the value from the standard. See also fire authority approval.
What do local plans add to the distances?
A spatial plan can add its own limits. Act 200/2022 on spatial planning defines regulatives of the spatial arrangement of the territory. A regulative is a limit or a parameter, given in text, in numbers or in a drawing, that sets conditions for building. Regulatives are part of the municipal plan, the plan of a microregion and the zone plan (§ 5 písm. i and j).
The decision on the building intent checks that the planned work agrees with the binding opinion of the planning authority (Act 25/2025 § 57 ods. 2 písm. c). See binding opinion. Neither Act 25/2025 nor Act 200/2022 defines the term stavebná čiara (building line) in the versions checked. How local plans use it is explained on the page about the building line. Read the plan of the municipality before you design.
Does a neighbour have to agree to a reduced distance?
The act names no consent of the neighbour in the steps of the proceedings. A neighbour is a party only if the decision on the building intent can directly affect their ownership or other rights. The rule is in Act 25/2025 § 49 ods. 1 písm. c. A neighbouring plot has a common boundary with the plot. A plot without a common boundary is also neighbouring if the building can directly affect its use (§ 7 ods. 2). The page about neighbour consent explains this in more detail.
How do daylight and sunlight affect the distance?
Daylight and sunlight are two of the requirements in § 6 ods. 1. They are not given as a separate figure in § 6. A daylighting study shows whether a design meets them. This page does not quote standard values for daylight, because they were not read.
Which rule sets which distance?
| Distance | Where it is set | Source |
|---|---|---|
| 7 m, 2 m, 4 m and 3 m for family houses | Decree 532/2002 | § 6 ods. 3, 4 and 6 |
| Fire-safety distance | Decree 94/2004 and a technical standard. No metre value in the decree for houses | § 79 and § 80 |
| Local limits on building | Municipal plan, microregion plan or zone plan | Act 200/2022 § 5 písm. i |
| Notification trigger for a structure closer than 2 m to the boundary | Act 25/2025 | § 18 ods. 3 písm. b |
How long does decree 532/2002 stay in force?
The decree stays in force until the implementing decrees of the Building Act take effect. This is at the latest 31 March 2027 (Act 25/2025 § 84 ods. 23). Act 243/2026 does not change that paragraph. New technical decrees may set other distances after that date. This page does not know their content, because they were not published in the sources checked.
Frequently asked questions
- What is the minimum distance between two family houses in Slovakia?
- At least 7 m where the houses form a free space between them (decree 532/2002 § 6 ods. 3). On a constrained site it may fall to 4 m if no opposite wall part has a window of a habitable room (§ 6 ods. 4).
- How far from the boundary must a family house stand?
- At least 2 m from the common plot boundary (§ 6 ods. 3). If the 4 m rule between houses is used, this 2 m distance does not apply (§ 6 ods. 4).
- Can I build on the boundary of my plot?
- Only if the structure does not permanently limit the use of the neighbouring plot for its intended purpose (§ 6 ods. 2).
- How is the distance measured?
- On the shortest line between the outer surfaces of the perimeter walls. A protruding part counts only if it protrudes more than 1.50 m (§ 6 ods. 7).
- What are the fire safety distances between buildings?
- They come from decree 94/2004 and a technical standard. The distance is set for each fire compartment (§ 80 ods. 2 and 3 of the decree). The decree prints no metre value for houses, so ask the fire designer.
- Does the neighbour need to agree to a smaller distance?
- The act names no neighbour consent. A neighbour whose rights can be directly affected is a party to the proceedings (Act 25/2025 § 49 ods. 1 písm. c).
Sources
- Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia Slovenskej republiky, via Slov-Lex · § 6 ods. 1 to 7 (Odstupy stavieb)
- Vyhláška Ministerstva vnútra Slovenskej republiky č. 94/2004 Z. z., ktorou sa ustanovujú technické požiadavky na protipožiarnu bezpečnosť pri výstavbe a pri užívaní stavieb · Ministerstvo vnútra Slovenskej republiky, via Slov-Lex · § 79 ods. 1, 3 and 4, § 80 ods. 1 to 3
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 7 ods. 2, § 18 ods. 3 písm. b, § 49 ods. 1, § 57 ods. 2 písm. c, § 84 ods. 23
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, via Slov-Lex · § 5 písm. i, j