Bungalow or Two-Storey House?

7 min read
A completed two-storey white rendered family house with a flat roof, dark window frames, external blinds and timber accent panels, photographed from below across rough unlandscaped ground under a heavy grey sky, with a lower single-storey wing stepping down to one side.

Why this is not a question of taste

At a first meeting, "bungalow or two-storey house" is almost always asked as a question of preference. In reality it is largely settled for you by two things that have nothing to do with preference: the plot you bought, and who will be living in the house in fifteen and in thirty years. A bungalow and a two-storey house are not two styles. They are two different answers to the question of how to spread the same floor area.

And one thing up front that the catalogue-bungalow advertising leaves out: for the same floor area, a bungalow is the more expensive house per square metre. Not by an order of magnitude, but reliably. There are reasons for it and there is something you get back for it, but you need to know it before the building contract is signed.

The plot decides first

For the same floor area, a bungalow needs roughly twice the footprint. A house of a hundred and thirty square metres sits on around seventy square metres of footprint when it has an upper floor, and on a hundred and thirty as a bungalow, and to that you add the terrace, the carport and the paved surfaces.

That number runs into two limits. The first is the building coverage ratio, which is set by the land-use plan of the individual municipality and which differs from one municipality to the next. There is no single national figure to quote, so the first step is always to obtain the regulatory extract for the specific plot. The second limit is the setback distances from the plot boundaries and from neighbouring buildings. On a narrow parcel the width of a bungalow is cut from both sides at once, and what is left is a house that is deep and dark.

Besides the house, the plot also has to absorb the driveway and room to turn a car, standing for two cars, the service connections, a septic tank or small treatment plant where there is no sewer, and a corner for garden equipment. With a bungalow none of these surfaces has anywhere to retreat to, neither under the house nor above it, so they all happen on the same level and compete for the same parcel as the living accommodation.

The third limit appears in no regulation at all: the garden. A bungalow eats exactly the ground you bought the plot for. On a small or narrow plot the question therefore answers itself, and everything else in this text is only a supplement.

The money: a bungalow buys the same area more expensively

The difference does not arise in the price of the walling, but in what has to be built twice over. With a bungalow you pay for twice the area of foundations, twice the ground slab, twice the roof and a larger envelope area per square metre of floor. Foundations and roof are among the most expensive constructions in a house, and they happen to be exactly the ones that can no longer be made cheaper once the build is under way.

The same thing comes back in running costs. The compactness factor, the ratio of heat-losing surface to heated volume, works out more favourably for the two-storey house, and heat loss follows that ratio. The bungalow has to catch up with thicker insulation, which again costs money.

What does get overrated is the saving on a flat roof. A bungalow's flat roof is not cheaper because it is flat. It is priced by the square metre just as a pitched roof is, it carries twice the area of waterproofing, which has a finite life, and twice the area over which falls and drainage have to be resolved. On a two-storey house the same build-up lies over half the area, and one day it will also be repaired for half.

On the other side of the scales stands the staircase. A bungalow does not need one, and so it saves not just the structure itself but the floor over the ground storey across that footprint, the balustrade, the floor area consumed on two levels at once, and scaffolding both when the facade goes on and at later repairs. These are real line items. They do not erase the difference, they only narrow it.

Life stage: the bungalow's real argument

If I had to defend the bungalow in one sentence it would be this: it is the house that still works at eighty, and still works three months after a knee operation. Everything on one level is not a comfort, it is an insurance policy. A barrier-free solution can be built into a bungalow almost for free: a threshold-free entrance, doors wide enough, and a bathroom that can one day be converted to a shower without a tray.

A two-storey house has only one honest answer to this, and that is a ground-floor room that can become a bedroom, with a bathroom right beside it. Not a study squeezed under the stairs, but a full room with a window and space for a bed. Planned from the outset it costs almost nothing. Drawn in after twenty years, it usually cannot be done at all.

Until then, a single level also has a thoroughly prosaic value. The laundry basket, the vacuum cleaner, a child who cannot walk yet, the shopping and the bin all cross the house several times a day, and a staircase turns each of those trips into a small manoeuvre. On the other hand it is precisely the staircase that keeps the night zone separated from the day zone without spending a single extra metre of corridor on it, which in a bungalow is a luxury.

Daylight and privacy

A bungalow has roof above every room, and that is its strongest planning advantage: light can be brought in from above where it cannot be brought in from the side. A rooflight over the corridor or over a bathroom in the middle of the plan does more than two extra windows in an external wall.

It pays for this in privacy. The whole bungalow sits at the eye level of the neighbour and of anyone walking past. It can be handled with fencing, planting, pushing the living part deeper into the plot or with an internal courtyard, but it always costs something and it always takes another piece of the plot. The upper floor of a two-storey house gets views and privacy for free, simply because it is higher than the fence.

The bungalow has one more advantage that never reaches a comparison table: every room can have its own way out into the garden. House and plot then work as a single space and the boundary between them is only a threshold. In a two-storey house that relationship exists on the ground floor alone, and the upper floor stays cut off from the garden, which with small children is an everyday subject.

The deep-plan trap

The commonest mistake in catalogue bungalows is a simple one: the house is too wide. When the plan is fifteen metres deep, the rooms in the middle of it have no external wall. What you get is a day zone lit from one side only, a corridor with no window, and a bathroom with the light on at midday.

The sound rule is to keep the depth of the tract such that every habitable room can be lit from an external wall, and to occupy the deeper positions deliberately with what does not need daylight: the wardrobe, the plant room, the pantry. If the plan still comes out wider, it needs to be broken, not stretched further.

The other half of the same trap is corridor length. A bungalow spreads the layout across the ground, so the distance from the entrance to the furthest bedroom grows, and with it grows the share of area that serves only movement. One thing helps: putting the entrance and the services core nearer the middle of the plan than its end, so the house is served from one point rather than from one end.

The two forms side by side

CriterionBungalowTwo-storey house
Footprint for the same floor areaRoughly doubleRoughly half
Envelope area per square metre of floorHigher, mainly roof and slabLower, better form factor
Main extra cost driverFoundations, ground slab, roofStaircase and the floor over the ground storey
Heat loss at the same build-upHigher, must be offset with insulationLower
AccessibilityInherent, at practically no extra costOnly via a ground-floor room and bathroom
Privacy in the living areasLow, has to be bought with plot and fenceFree on the upper floor
Daylight in the middle of the planSolvable from above, through the roofSolves itself, the plan tends to be narrower
Garden left overSubstantially smallerLarger for an equally big house
Facade and roof maintenanceMostly off a ladder, no scaffoldingScaffolding or a platform

Plot and household: what usually fits

SituationForm that usually winsWhy
Narrow parcel in a street frontageTwo-storey houseSetbacks take the width from both sides at once
Small plot with a strict coverage ratioTwo-storey houseA bungalow simply will not fit the regulation
Wide level plot with ground to spareBungalowCoverage is not the binding limit and the garden survives
Sloping plotTwo-storey houseThe terrain itself offers two entrances on two levels
Family with small children, thirty-year horizonBungalow with an atticExtra rooms now, one level later
Couple over fifty building their last houseBungalowLife stage outweighs the cost per square metre
Multi-generational livingTwo-storey house with a single-storey wingTwo households and two degrees of privacy under one roof

The two hybrids that resolve most cases in practice

The first is a bungalow with a usable attic. The ground floor carries the whole day zone plus one bedroom with a bathroom, so the house is usable on a single level, and under the roof you are paying for anyway you gain two rooms for children or guests. The condition is a knee wall high enough and daylight designed properly, whether through roof windows or through dormers. That is decided at the first sketch, not at the roof structure.

The second is a two-storey house with a single-storey wing, typically an L-shaped plan. The two-storey part holds the night zone and the compact form, the lower wing takes the living room, the kitchen or the garage and at the same time creates a sheltered corner of garden turned away from the street. The house gains the scale of a bungalow where people respond to it, without spending the whole parcel.

Key takeaway: a bungalow is not the cheaper house. It is a house you buy with extra money and extra footprint, and what you buy with them is independence from a staircase for the rest of your life. If the plot allows it and the household has a reason, it is a good trade. If not, the right answer is usually one of the hybrids, not a smaller house.

Frequently asked questions

Is a bungalow more expensive even for a small house?
Yes, and proportionally often even more so. The smaller the house, the larger the share of the budget taken by foundations, slab and roof, which are exactly the constructions a bungalow has twice as much of. On a large house the difference is diluted into greater volume; on a small one it shows most.
How much plot does a bungalow of a hundred and twenty square metres need?
The house itself takes roughly a hundred and twenty to a hundred and thirty square metres of footprint, plus terrace, carport and driveway. How much of the parcel that may be is not set by any national rule but by the building coverage ratio in the land-use plan of that municipality. Ask for the regulatory extract for the specific parcel before you buy it.
Can a bungalow be extended upwards later?
Technically sometimes, economically almost never. The foundations and the floor structure of a bungalow are sized for one storey, and the structural engineer's assessment is usually the first bad news. If you seriously contemplate an extension, the structure has to be sized for it at design stage, which makes more expensive a house you may never extend.
Is a bungalow also more expensive to heat?
At the same construction build-up and the same floor area a bungalow has more heat-losing surface, so yes. The difference can be erased with thicker insulation and better windows. This is not an argument against the bungalow, it is a line item that belongs in the budget from the start rather than being discovered in the energy assessment.
How do you handle privacy in a bungalow when the neighbour is close?
The order is plot, then layout, and only then the fence. Push the living part deeper into the parcel and turn it away from the neighbour, put the bedrooms against the quiet boundary and face the neighbour with the plant room, the wardrobe or the garage. Fence and planting finish what the layout has already solved, not the other way round.
Is a domestic lift worth planning for in a two-storey house?
The lift itself is a wasted expense for most families. What is worth doing is leaving a vertical shaft of roughly one metre by one metre stacked on both floors and using it as a cupboard in the meantime. If the situation changes, there is somewhere to put a lift. If it does not, you have lost one square metre of storage.
Is a bungalow easier to build with your own labour?
Yes, and it is its underrated advantage. Everything is done from low scaffolding or a ladder, the walling does not need concrete pumped to height, and later maintenance of facade, gutters and roof can be handled without scaffolding. Over the whole balance that gives back part of the higher construction cost.