Family House Layout: The Day Zone and the Night Zone

10 min read
An unfinished house interior at first-fix stage, timber stud partitions marking out the rooms

A layout is the arrangement of the rooms in a house and the routes between them. It decides how the house works for the people who live in it, and it is hard to change after the build. This text explains how to separate the day zone from the night zone. It also shows what decree 532/2002 says about the staircase, corridor, light and setbacks, and what is only a design principle. We give numbers only where an act or a decree gives them.

What are the day zone and the night zone, and why separate them?

The day zone is the part of the house in use from morning to evening. It holds the entrance, kitchen, dining and sitting areas, and sometimes a work spot and the door to the terrace. The night zone is the bedrooms and bathrooms. It needs the opposite conditions: quiet, darkness and independence from the rest of the house.

The zones are separated so that the house can handle two activities at once. If a bedroom opens straight into the living room, one space cannot serve guests and a sleeper at the same time. Separation does not mean two storeys. On one level, distance and an inserted layer create it. Examples are a hall, a wardrobe or a bathroom between the noisy and the quiet part. In a two-storey house the separation comes naturally but not automatically. A night zone above the living room with an open staircase is not separated, only higher.

Decree 532/2002 requires a building to be designed with conditions for comfort during sleep, rest and work (§ 20 ods. 1). It gives no noise values. A separate regulation sets them.

How should the entrance of a house work, and what belongs there?

The entrance is a filter. Shoes, wet coats, the pram and the school bag stay there and do not travel further into the house. If the entrance hall is small, the corridor takes over its job, then the kitchen, and finally the living room.

The decree requires a dispersal area in front of the entrance that suits the type of building (§ 8 ods. 1). A family house must have at least one garage space per dwelling. If it does not, the plot must have a marked area for a vehicle (§ 45 ods. 1). It must also have a defined space for household waste, in the house or on the plot (§ 45 ods. 2).

A good entrance has three steps. From outside you enter the hall, where you change shoes and take off outer clothing. From the hall you reach the internal circulation, the day zone and a toilet. A separate route leads to the night zone. If the house has a garage or a garden, plan a second, dirty route. It leads straight into the utility room or the hall, not into the kitchen.

How should rooms face the points of the compass?

The main living rooms belong to the south and south-west. The kitchen and the morning routine belong to the east. Rooms that do not need direct sun belong to the north. This is a design principle, not a rule. A west window without external shading overheats a room on summer evenings. The text on house orientation covers this in more detail.

The rules say less. A dwelling must receive sunlight. A Slovak technical standard sets how to assess it (532/2002 § 18 ods. 2, 259/2008 § 5 ods. 1 and 2). This text does not quote the standard with the sunlight hours. It is paywalled and was not available for this text.

No rule names a daylighting study as a mandatory document. It helps with large glazing or on a tight plot, where neighbouring buildings, trees or terrain cast shade. A design must also not worsen the daylight in surrounding buildings more than the technical standards allow (259/2008 § 4 ods. 4).

What does the decree require for daylight and ventilation of rooms?

The decree sets basic conditions, not window sizes. These apply:

  • A habitable room must have enough daylight, direct ventilation and heating with heat control (532/2002 § 17 ods. 2).
  • The space for personal hygiene, the toilet, the cooking space and the pantry must be ventilated enough. Hygiene and cooking spaces must also be heated (§ 17 ods. 5).
  • A dwelling must not be ventilated into building service rooms or the common corridor, except an open gallery (§ 17 ods. 6).
  • A long-stay room that is not a habitable room needs a daylight factor of at least 1.5 % for side lighting. For top or combined lighting it needs 3 % (259/2008 Annex 3 a) point 2).
  • For long stays, the glazing must have a light transmittance of at least 0.6 (259/2008 § 4 ods. 6).

The daylight of habitable rooms is assessed under STN 73 0580-1 and STN 73 0580-2, which the annex of 259/2008 names. We do not give their values here.

Should the day zone have an open plan?

It can, but it has two costs. An open-plan layout feels larger, the family stays in contact, and the area works harder. The first cost is acoustic: in one room you cannot watch a film, take a call and do homework at the same time. The second cost is smell and sightlines, because an open kitchen is always in view.

The decree requires the cooking space to be ventilated enough (§ 17 ods. 5). It also requires protection from noise from another enclosed space in the building (§ 20 ods. 2 písm. b). It sets conditions for comfort during sleep (§ 20 ods. 1). The answer is not to drop open plan. Add one closable space, for example a small study, a guest room or a sliding partition between the sitting and dining areas.

What should the night zone provide?

The night zone has three needs: quiet, morning light and room to change. A bedroom next to the utility room or a service riser is exposed to the noise of the equipment. The decree says built-in devices that make noise and vibration must be positioned and installed to limit transmission into the structure (§ 20 ods. 5). A utility room with a heat source or a ventilation unit therefore does not belong behind a bedroom wall.

A bedroom facing east or south-east gets morning light without the evening overheating that a west facing room gets. The use of a child's room changes over time. It may later become a study or a guest room. A room where furniture can form two different arrangements survives such a change without building work.

For bathrooms, it pays to split functions instead of concentrating them. One large bathroom with everything in a single room is less practical at the morning peak than a smaller bathroom plus a separate toilet. A toilet reachable from the day zone without crossing the night zone improves a layout.

What sizes must the staircase, corridor and rooms have?

Decree 532/2002 sets these values for a family house:

ItemValueWhere
Main staircase and corridorClear width at least 900 mm, clear headroom at least 2,100 mm§ 45 ods. 3
Auxiliary staircaseClear width at least 750 mm§ 45 ods. 3
Stair flightAt most 16 steps, all of equal height. Auxiliary staircase at most 18§ 27 ods. 3
Pitch of the main staircaseAt most 35°. A staircase inside a dwelling with a structural height under 3,000 mm and a staircase to a basement at most 41°§ 27 ods. 4
Staircase railingOne railing up to 1,200 mm width, two if wider. A circular staircase always has two§ 27 ods. 8
Clear height of a habitable roomSet by the standard. It may drop to 2,400 mm, or 2,300 mm in an attic, if the microclimate is secured another way§ 43 ods. 5

The staircase space must be lit and ventilated (§ 27 ods. 9). The decree sets no room areas for a family house. It sends the habitable room to a Slovak technical standard (§ 43 ods. 4), which this text does not quote. Decree 532/2002 stays in force until the new implementing rules apply, at the latest to 31 March 2027 (25/2025 § 84 ods. 23 písm. b).

A bare concrete staircase in an unfinished house, cast in place with no balustrade and no finishes
A concrete staircase in an unfinished house. Decree 532/2002 sets the pitch, the number of steps in a flight and the railing.

How much floor area should corridors and the staircase take?

No act or decree sets a share for circulation area. They set only the minimum widths and heights in the table above. You must therefore judge the share yourself, already at the study stage. Circulation space is the hall, the corridors, the staircase and any area that exists only to move through.

The method is simple. Add up the circulation area and divide it by the floor area of the house. Compare several layout variants this way. If a variant comes out clearly higher than the others, go back to the room sequence diagram. Narrower corridors do not help, because the main corridor cannot go below 900 mm. Circulation area is built and heated like the living room. We give no price per m² here, because no dated source exists. The text on the construction budget and the bill of quantities explains how such sums add up in a budget.

One exception: a corridor can serve a second purpose. It can hold storage, bring daylight into the middle of the plan or form the buffer between the day and night zones. Such a corridor is not lost area. A corridor with no second function deserves scrutiny.

Which storage and service spaces do designs forget?

Things with no place do not disappear. They move into the living spaces. In a family house layout it is worth walking through this list:

  • A utility room for the heat source, the hot water tank, the distribution board and any ventilation unit. It should be reachable without crossing living space and acoustically separated from bedrooms.
  • A pantry or storage next to the kitchen. The decree requires a food store to be ventilated enough (§ 17 ods. 5).
  • A wardrobe or a wardrobe wall in the night zone.
  • Seasonal items: bikes, sledges, garden tools. A garage space or a vehicle area is a separate requirement (§ 45 ods. 1).
  • A place to dry laundry outside the living room, and a space for household waste (§ 45 ods. 2).

Should the house have one storey or two?

This decision shapes the layout more than any other. At the same floor area, a single-storey house needs a larger footprint, roof and ground slab. A two-storey house takes less plot. It pays for this with a staircase, which is pure circulation area, and with a split of daily life across two levels. The text Bungalow or two-storey house? goes into more detail.

In practice the plot decides. The municipal spatial plan sets the largest allowed built-up area as a building coverage regulative. There is no national value (200/2022 § 22 ods. 3 písm. c and 392/2023 § 2 písm. w). Decree 532/2002 asks for an accessible family house only if a person with limited mobility or orientation will use it (§ 56 písm. c). Then the main entrance of a new building must have no steps (§ 57 ods. 1). A multi-storey building without a lift must have an accessible entrance floor (§ 59 ods. 2). More is in the entry on the barrier-free house.

Which setbacks affect the shape and position of the house on the plot?

The plot limits the layout through the place where the house fits. Decree 532/2002 sets these setbacks for family houses in § 6:

SituationSetbackWhere
Between family houses that form a free space between themAt least 7 m§ 6 ods. 3
From a common plot boundaryAt least 2 m§ 6 ods. 3
In tight territorial conditions between family housesDown to 4 m if the opposite wall parts have no windows of habitable rooms. The 2 m boundary distance then does not apply§ 6 ods. 4
Facade with windows of habitable rooms from the edge of a roadAt least 3 m. It does not apply in gaps of row development§ 6 ods. 6

Setbacks are measured on the shortest lines between the outer surfaces of the perimeter walls. A projecting part counts if it projects more than 1.50 m (§ 6 ods. 7). Other distances may be set only by calculations and measurements or by a zone plan (§ 6 ods. 5). Fire-safety distances are a separate topic, see the entry on building setback distances.

Which layout mistakes come up again and again?

  • A small or missing entrance hall. The filtering moves into the rest of the house.
  • A bedroom entered from the living room. The house then cannot handle an evening and sleep at the same time.
  • A corridor with no second function. It costs as much as the living room and carries nothing.
  • Large west glazing without external shading. External shading is designed together with the windows.
  • No storage at all. Furniture then replaces the layout.

How should you approach a layout design?

Before drawing, you need more than the number of bedrooms. You need to describe an ordinary weekday and an ordinary Sunday. Who gets up first? Where do you eat? Where does homework get done and laundry get hung? Which door does the shopping come through? What happens when guests arrive? The zoning diagram and the room sequence come out of that. Only then does it make sense to discuss the shape of the house and its facade.

At the study stage the day and night zone diagram and the entrance come first. Treat the circulation area as a check. If it comes out high, look for a different room sequence, not for narrower corridors. A layout can be redrawn in a few days on paper. It cannot be redrawn on site. The order of steps is described in the text on how building a house in Slovakia works.

Frequently asked questions

What do the day zone and the night zone mean in a house layout?
The day zone is the part of the house in use from morning to evening: the entrance, kitchen, dining and sitting areas. The night zone is the bedrooms and bathrooms, which need quiet and independence from the rest of the house. The zones are separated so that the house can handle an evening in the day zone and sleep in the night zone at once.
How wide must the main staircase and corridor be in a family house?
The main staircase and corridor must have a clear width of at least 900 mm and a clear headroom of at least 2,100 mm. An auxiliary staircase must be at least 750 mm wide. The values are in decree 532/2002, § 45 ods. 3.
How much floor area should corridors and the staircase take?
No act or decree sets a share for circulation area. The decree sets only minimum widths and heights. It pays to calculate the share at the study stage for each layout variant and compare the variants.
How should rooms be oriented in Slovakia?
The main living rooms belong to the south and south-west. The kitchen belongs to the east. Rooms that do not need direct sun belong to the north. This is a design principle. The rules ask only that a dwelling receives sunlight as assessed under a Slovak technical standard.
Is an open-plan layout a good choice?
It can be. The space feels larger and the family stays in contact. The costs are noise, smell and an always visible kitchen. A sensible compromise is an open day zone plus one closable space, such as a study or a sliding partition.
Must a family house be barrier-free?
Decree 532/2002 asks for an accessible family house only if a person with limited mobility or orientation will use it (§ 56 písm. c). Then the main entrance of a new building must have no steps (§ 57 ods. 1).

Sources

  1. Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia Slovenskej republiky, via Slov-Lex · § 6 ods. 2 to 7, § 8 ods. 1, § 17, § 18 ods. 2, § 20, § 27, § 43, § 45, § 56 to § 59
  2. Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov a o minimálnych požiadavkách na byty nižšieho štandardu a na ubytovacie zariadenia · Ministerstvo zdravotníctva Slovenskej republiky, via Slov-Lex · § 4 ods. 4 and 6, § 5 ods. 1 and 2, príloha č. 3 písm. a) bod 2
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 84 ods. 23 písm. b
  4. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, via Slov-Lex · § 5 písm. i a j, § 22 ods. 3 písm. c
  5. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky č. 392/2023 Z. z. o obsahu a spôsobe spracovania územnoplánovacej dokumentácie a o územnoplánovacích podkladoch a všeobecných požiadavkách na priestorové usporiadanie územia a funkčné využívanie územia · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 2 písm. w

Topic

  • Design and layout