Cadastral Survey Plan
A cadastral survey plan is a technical document that shows a property before and after a change so the cadastre can record the change.
What is a cadastral survey plan?
A cadastral survey plan is a technical document that shows a property before and after a change so the cadastre can record the change. The Slovak name is geometrický plán. English texts also call it a geometric plan.
The cadastral act calls it a technical basis for legal acts, public documents and other documents. It also serves as a basis for entering rights to real estate (act 162/1995 Z. z., § 67 ods. 1). A geodetic survey in the field supplies the data. The plan shows the property before and after the change. It gives the old and new parcel numbers, the land types, the areas and the data on rights to the property (§ 67 ods. 2).
A plan is not a legal act. A contract or another legal act still has to exist. The plan is the technical basis for the entry in the cadastre of real estate.
When do you need a cadastral survey plan?
You need a plan when a change affects parcel boundaries or only a part of a parcel. A proposal to the cadastre must give the verification number of the plan in these cases (act 162/1995, § 24 ods. 1 písm. g):
- The owner divides or merges parcels. See land subdivision.
- The parties set up an easement (vecné bremeno) on a part of a parcel.
- The office enters or deletes a building or a flat under § 46 ods. 2 to 4 and 6 to 8.
After a new building, the geodet makes a plan to update the cadastre (act 25/2025 Z. z., § 40 ods. 3 písm. h). For some building types the plan is also an attachment to the proposal for kolaudácia (§ 66 ods. 2 písm. d). See cadastral registration of a building.
Do you need a plan to sell a whole parcel?
No, when the boundaries stay the same. The list in § 24 ods. 1 písm. g does not name the sale of a whole parcel. A sale of only a part divides the parcel. In that case the seller needs a plan.
The cadastre uses a plan as a basis for a legal act only if the "before" state equals the valid cadastre data (decree 461/2009 Z. z., § 45 ods. 4).
What does a cadastral survey plan contain?
A plan has three parts (decree 461/2009 Z. z., § 47 ods. 1). The parts must be bound so that nobody can swap a sheet later (§ 47 ods. 2).
| Part | Slovak name | Content |
|---|---|---|
| Description field | popisné pole | Data that identify the plan |
| Drawing | grafické znázornenie | The present state of the properties and the proposed changes |
| Table of areas | výkaz výmer | Areas of the parcels and of parts of parcels |
The package for official verification holds at least four authorisation-verified copies of the plan. It also holds electronic data to update the cadastral map, a table of areas in XML format and PDF copies (§ 50 ods. 1 to 3).
Who can make and verify a cadastral survey plan?
The district office, a person with a trade licence or a court-appointed expert in geodesy can make a plan (act 162/1995, § 67 ods. 3). A maker without a special authorisation from the Office of Geodesy, Cartography and Cadastre needs help. A person with the right to verify plans must verify the plan (§ 67 ods. 4).
The cadastre uses only a plan that the district office also verified (§ 67 ods. 5). Two different people do the two verifications (act 215/1995 Z. z., § 9 ods. 3).
The person who gives the authorisation verification needs a master's degree in geodesy and cartography. That person also needs five years of practice and a pass in the qualification exam (act 215/1995, § 7 ods. 2).
How is a cadastral survey plan made?
- The owner marks the break points of the boundaries to change, if they are not marked yet (decree 461/2009, § 46 ods. 1).
- The geodet collects the base data. The cadastre data sets are binding bases (§ 45 ods. 1). The geodet may enter the land after prior notice to the owner and must show a geodet's identity card (act 215/1995, § 14 ods. 1).
- The geodet measures and draws the plan. Another person gives the authorisation verification.
- The package goes to the district office for official verification (act 215/1995, § 9 ods. 1). The office gives the verification number.
- The parties sign the legal act and file a proposal with the verification number (act 162/1995, § 24 ods. 1 písm. g).
If the break points of a new boundary have no permanent mark, the owner marks them within 30 days. The period starts when the owner receives the decision on the entry or the notice of the entry (decree 461/2009, § 46 ods. 2).
How long does the cadastre take to record the change?
The district office decides on a proposal for vklad within 30 days of delivery (act 162/1995, § 32 ods. 1). It makes an entry by záznam within 60 days of the start of the proceeding (§ 43 ods. 1 písm. b). The period is 30 days for a proposal on the electronic form (§ 43 ods. 3).
The sources read set no period for the surveyor's work or for the official verification of the plan.
What does a cadastral survey plan cost?
The act on administrative fees sets three amounts (act 145/1995 Z. z., item 10 písm. h to j):
- Verification of four copies of the plan: 40 euro.
- Verification of three more copies: 10 euro.
- A copy of a plan: 12 euro for each five started A4 pages.
These amounts are the same in the versions valid from 1 November 2026, 1 December 2026 and 1 January 2027. None of the acts read here sets a price for the surveyor's work.
How is it different from a geodetic survey and an as-built survey?
| Document | What it does | Source |
|---|---|---|
| Cadastral survey plan | Is the technical basis for entering a change in the cadastre | Act 162/1995, § 67 |
| Geodetic survey | Measures a site or a building for the building process | Act 25/2025, § 40 |
| Boundary staking (vytyčovanie hraníc pozemkov) | Marks the break points of a boundary in the field | Decree 461/2009, § 51 |
| As-built survey | Records the finished building | Decree 209/2025, § 8 |
A new building gives the geodet three separate duties. They are the geodetic part of the as-built documentation, the as-built survey and the plan (act 25/2025, § 40 ods. 3 písm. h).
Frequently asked questions
- What is a cadastral plan?
- A cadastral plan, in Slovak geometrický plán, is a technical document that shows a property before and after a change. The cadastre uses it as a basis to enter the change (act 162/1995 Z. z., § 67).
- Who can make a cadastral survey plan?
- The district office, a person with a trade licence or a court-appointed expert in geodesy can make it. The cadastre uses only a plan that the district office also verified (act 162/1995, § 67 ods. 3 to 5).
- Do I need a plan before I sell part of my land?
- Yes. Selling a part divides the parcel, and the proposal to the cadastre must give the verification number of the plan (act 162/1995, § 24 ods. 1 písm. g).
- Do I need a plan to sell a whole parcel?
- No, when the boundaries stay the same. Division, merging, an easement on a part of a parcel and certain entries for buildings need the verification number (§ 24 ods. 1 písm. g).
- What does a cadastral survey plan cost?
- The district office charges 40 euro for the verification of four copies (act 145/1995 Z. z., item 10 písm. h). The surveyor's price is not set in the acts read and comes from the contract.
- How long does the cadastre take to record the change?
- The office decides on a proposal for vklad within 30 days of delivery (act 162/1995, § 32 ods. 1). It makes an entry by záznam within 60 days of the start of the proceeding (§ 43 ods. 1 písm. b).
Sources
- Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 3 ods. 10, § 24 ods. 1, § 32, § 43, § 46, § 67
- Vyhláška Úradu geodézie, kartografie a katastra Slovenskej republiky, ktorou sa vykonáva zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) (č. 461/2009 Z. z.) · Úrad geodézie, kartografie a katastra SR, via Slov-Lex · § 45, § 46, § 47, § 50, § 51
- Zákon Národnej rady Slovenskej republiky č. 215/1995 Z. z. o geodézii a kartografii · Národná rada Slovenskej republiky, via Slov-Lex · § 6, § 7, § 9, § 14
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 40 ods. 1 a 3, § 66 ods. 2
- Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky, ktorou sa ustanovujú podrobnosti o postavení a činnosti geodeta pri príprave, zhotovovaní stavby a užívaní stavby a o výkone geodetických a kartografických činností vo výstavbe (č. 209/2025 Z. z.) · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 8
- Zákon Národnej rady Slovenskej republiky č. 145/1995 Z. z. o správnych poplatkoch · Národná rada Slovenskej republiky, via Slov-Lex · Položka 10 písm. h až j