As-Built Survey

An as-built survey is a geodetic measurement of a finished building that a surveyor makes to record where and how the building was built.

What is an as-built survey?

An as-built survey is a geodetic measurement of a finished building that a surveyor (geodet) makes to record where and how the building was built. The Slovak name in the act is porealizačné zameranie stavby. The act lists it among the duties of the geodet. It sits next to the geodetic part of the as-built documentation and the geometric plan for the cadastre update (§ 40 ods. 3 písm. h of act 25/2025 Z. z.). Decree 209/2025 Z. z. sets the details.

These are three different results:

ResultWhat it isSource
Geodetic part of the as-built documentation (geodetická časť dokumentácie skutočného zhotovenia stavby)Direct measurement on the building, in the reference system of the buildingDecree 209/2025, § 7 ods. 1
Porealizačné zameranie stavbyMeasurement in the reference system of the building, or in the binding system that the cadastre and the information system require. It includes the data needed to register rights to the buildingDecree 209/2025, § 8 ods. 1 and 3
Geometric plan (geometrický plán)Technical basis for legal acts and for entering changes in the cadastreAct 162/1995, § 67 ods. 1

People also search for it as "geodetické zameranie skutočného vyhotovenia stavby". The act says zhotovenia. See also as-built documentation and geodetic survey.

What is the difference between staking out and an as-built survey?

Staking out (vytýčenie stavby) comes before construction. The as-built survey records the result. A geodet must stake out a new building, an extension or a terrain modification in the field before work starts. This does not apply to a minor structure that needs only a notification (§ 42 ods. 1). The geodet makes a staking protocol and records the staking in the construction diary (§ 42 ods. 3). See minor structure.

During construction the geodet also measures the real position of the building and of underground networks before they are covered (decree 209/2025, § 5 ods. 3 písm. b).

Who makes an as-built survey?

A geodet makes it. The geodet must meet the requirements of a special regulation. The results of selected geodetic activities need an authorisation check by an authorised person, and the geodet arranges that check (§ 40 ods. 1 and ods. 3 písm. a). On a reserved building or a large building a chief geodet coordinates several geodets (§ 40 ods. 2).

A geometric plan may be made by the district office, by a legal or natural person with a trade licence, or by a court-appointed expert. A maker without special authorisation from the office must have the plan verified by an authorised person. The cadastre uses only a geometric plan that the district office also verified (act 162/1995, § 67 ods. 3 to 5).

What does the as-built survey contain?

The report on the geodetic part of the as-built documentation contains (decree 209/2025, § 7 ods. 2):

  • a technical report
  • a data set of characteristic points and elements of the building, its technical and transport infrastructure and its technological equipment
  • details of the terrain around the building, the plot boundary, the boundary of protection zones and other elements that the project documents name
  • a list of coordinates of detail points with their accuracy
  • a drawing of the points and elements in the form that the contractor and the information system require

The accuracy of the measurement is at least the level of the staking tolerances in the staking protocol (§ 7 ods. 3). For the porealizačné zameranie the accuracy is the level of large-scale thematic maps, such as a city technical map (§ 8 ods. 2).

When is the survey done?

The geodet measures each element while it is still accessible, before terrain modification, building work or structures cover it (decree 209/2025, § 7 ods. 1). The contractor must arrange the survey of newly laid underground technical infrastructure and other underground parts before they are covered (§ 32 ods. 2 písm. o). The contractor must also make sure the as-built documentation is ready for kolaudácia. The contractor records agreed changes against the verified project in the construction diary (§ 32 ods. 3). The act sets no number of weeks for the survey.

Is an as-built survey required for kolaudácia?

It depends on the type of building. The attachments to the proposal for kolaudácia follow the type (§ 66 ods. 2). In the version to 31 December 2026 the list includes these surveying and documentation items:

  • the as-built documentation
  • the geodetic documentation of the staking out
  • the control protocol on the spatial position
  • the geometric plan for the cadastre update
  • the geodetic survey of the finished building

Kolaudácia is not required for buildings that need only a notification (§ 66 ods. 1). From 1 January 2027 the letters of the list change but these items stay (act 243/2026). The occupancy certificate entry describes the proposal. The building office verifies the as-built documentation (§ 15 ods. 5 písm. d). The fee for this is €100 (act 145/1995, item 59 písm. i).

What if the survey shows the building differs from the project?

Deviations are handled before the work. The builder may call an extraordinary control inspection when work would deviate from the verified project (§ 43 ods. 2). Suppose a deviation does not conflict with the decision on the building intent or the conditions of the affected bodies. Then the designer marks it in the project. The site manager lists it in the minutes and in the diary (§ 43 ods. 2). If this route does not permit the deviation, the building office decides what follows. It requires a verification of the project change or a new building intent procedure (§ 43 ods. 3). See designer and site manager.

The as-built documentation can be a copy of the verified project with the deviations drawn in. Its summary report describes each deviation, its reason and its conformity with the decision (decree 60/2025, annex 21). If the building is built against the verified project, the office stops kolaudácia (§ 66 ods. 8).

What if an existing building has no as-built documentation?

If the documentation was not made, was lost or is in poor condition, the building inspectorate may call on the owner to obtain it. If a full set is not necessary, the inspectorate may accept simplified documentation, called pasport stavby (§ 74 ods. 10). From 1 January 2027 the inspectorate may order the owner to do this (act 243/2026). It is an offence not to obtain the documentation when the order requires it (§ 79 ods. 2 písm. g). From 1 January 2027 an application to legalise an unpermitted building needs the as-built documentation of the building or its built part (new § 50 ods. 3).

Some older buildings have another route. The owner may apply for the old review of fitness for use (preskúmanie spôsobilosti stavby na užívanie) by 31 March 2029. The building must meet the old conditions (§ 84 ods. 7 písm. a). See review of fitness for occupancy.

How does the survey reach the cadastre?

The geometric plan is the basis for entering changes in the cadastre (act 162/1995, § 67 ods. 1). The cadastre enters a building if outer walls and a roof structure enclose it (§ 46 ods. 2). After kolaudácia the administrator of the information system informs the district office. It sends the information on the certificate and on the verification of the as-built documentation (§ 21 ods. 2). See cadastral registration and land survey plan.

Frequently asked questions

What does geodetické zameranie skutočného vyhotovenia stavby mean?
It means a geodetic survey of the finished building as built. The act uses the words skutočného zhotovenia. It lists three separate duties of the geodet: the geodetic part of the as-built documentation, the porealizačné zameranie stavby and the geometric plan (§ 40 ods. 3 písm. h of act 25/2025).
Who may make an as-built survey?
A geodet who meets the requirements of the special regulation makes it. Results of selected geodetic activities need an authorisation check by an authorised person, which the geodet arranges (§ 40 ods. 1 and ods. 3 písm. a).
Is the as-built survey the same as the geometric plan?
No. The geometric plan is a separate document for the cadastre. The act lists the geometric plan and the porealizačné zameranie as separate duties of the geodet (§ 40 ods. 3 písm. h), and the geodet also arranges the plan during kolaudácia (decree 209/2025, § 6 ods. 2 písm. c).
What is the difference between staking out and an as-built survey?
Staking out marks the position of the building in the field before work starts (§ 42). The as-built survey measures the building after the work. The geodet also measures hidden parts before they are covered (decree 209/2025, § 5 ods. 3 and § 7).
Is an as-built survey required for kolaudácia?
It depends on the type of building. The attachments to the proposal follow the type. The list names the geodetic survey of the finished building and the geometric plan (§ 66 ods. 2). Notified buildings do not need kolaudácia (§ 66 ods. 1).
Do underground utilities need an as-built survey?
Yes, the contractor must arrange the survey of newly laid underground technical infrastructure before it is covered (§ 32 ods. 2 písm. o). The geodet measures it as part of the geodetic part of the as-built documentation (decree 209/2025, § 5 ods. 3 písm. b).

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 15, 32, 40, 42, 43, 66, 74, 79, 84
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (Art. I from 1 January 2027, Art. XV) · Národná rada Slovenskej republiky, via Slov-Lex · Art. I bod 114, 150 to 153, 180, 188
  3. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky, ktorou sa ustanovujú podrobnosti o postavení a činnosti geodeta pri príprave, zhotovovaní stavby a užívaní stavby a o výkone geodetických a kartografických činností vo výstavbe (č. 209/2025 Z. z.) · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 4 to 8
  4. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky o štruktúre a prevádzke informačného systému územného plánovania a výstavby, o obsahu podaní a obsahu a rozsahu dokumentácie stavby (č. 60/2025 Z. z.) · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 6 ods. 8, annex 21
  5. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 21 ods. 2, § 46 ods. 2, § 67
  6. Zákon Národnej rady Slovenskej republiky č. 145/1995 Z. z. o správnych poplatkoch · Národná rada Slovenskej republiky, via Slov-Lex · Položka 59 písm. i