Cadastral registration of a building

Cadastral registration of a building is the entry of a finished building and its owner in the real estate cadastre.

What is the cadastral registration of a building?

Cadastral registration of a building is the entry of a finished building and its owner in the real estate cadastre. The Slovak name is zápis stavby do katastra. The conditions are in § 46 ods. 2 of act 162/1995 Z. z., the cadastre act.

The cadastre records buildings as objects of their own (§ 6 ods. 1 písm. c). A building is not part of the plot under it (Civil Code, § 120 ods. 2). So the cadastre records the building apart from the plot.

The entry is not a permit. It records a building that exists. Permission to use the building comes from the kolaudácia, the final inspection. It ends with an occupancy certificate (kolaudačné osvedčenie, act 25/2025 Z. z., § 66 and § 67).

When does a building enter the cadastre?

The cadastre act sets one test for a new building. The building enters the cadastre when walls and a roof structure enclose it (§ 46 ods. 2). That paragraph does not name the kolaudácia as a condition. It does use the occupancy certificate as the document that names the owner of a building without a súpisné číslo (the house registration number).

An unfinished building (rozostavaná stavba) can enter earlier. The owner submits the final decision on the building intent and an expert opinion on the stage of construction. The opinion must show the structural and functional layout of the first above-ground floor. The cadastre then names the builder from the decision as the owner (§ 46 ods. 3).

The test names no size limit and no building type. A garage or a veranda enters on the same test, if walls and a roof structure enclose it.

Does the owner have to report a new building?

Owners must report every change of cadastre data to the district office (okresný úrad). The period is 30 days from the day the deciding fact arises (§ 19 písm. a). A natural person need not report data on real estate that already stand in a public document or another document.

The state also feeds the cadastre. The administrator of the planning and construction information system tells the district office about each occupancy certificate issued. It also reports each verification of as-built documentation (§ 21 ods. 2). State bodies and notaries send their documents on real estate to the district office within 30 days of issue (§ 21 ods. 1).

A right that arises by law or by a decision of a state body enters the cadastre as a záznam (§ 34 ods. 1). So does a right that arises by processing a thing. The district office makes a záznam without a proposal or on the owner's proposal (§ 35 ods. 1). The act does not say in one sentence that the entry of a new building is a záznam. Ask the district office which proceeding it opens.

Which documents does the entry need?

The act names these items for the entry of a building.

ItemWhat the act saysSource
Geometric plan (geometrický plán)The proposal gives its verification number. The cadastre uses only a plan that the district office has verified.162/1995 § 24 ods. 1 písm. g, § 67 ods. 5
Document that names the ownerA building with a súpisné číslo: a document under a special regulation. A building without one: the occupancy certificate, or the building office's notice that names who notified it.162/1995 § 46 ods. 2
Unfinished buildingThe final decision on the building intent and an expert opinion on the stage of construction.162/1995 § 46 ods. 3
Parcel identificationNeeded for a záznam if the right is not yet on a list vlastníctva.162/1995 § 35 ods. 2 písm. b

The kolaudácia ties in here. The proposal for kolaudácia attaches a geometric plan for the update of the cadastre. This depends on the type of building (act 25/2025, § 66 ods. 2 písm. d). The occupancy certificate carries the as-built documentation as an annex (§ 67 ods. 2). The geodet must make the plan, the as-built survey and the geodetic part of the as-built documentation (§ 40 ods. 3 písm. h). See geometric plan and as-built survey.

A building notified under § 63 needs no kolaudácia (§ 66 ods. 1). Such a building may get no súpisné číslo. Then its owner enters as the person that the building office's notice names as the notifier (162/1995 § 46 ods. 2).

How long does the district office take?

The act sets periods by kind of entry. It gives no period just for a new building.

Kind of entryPeriodSource
Decision on a proposal for vklad30 days from delivery162/1995 § 32 ods. 1
Záznam60 days from the start of the proceeding162/1995 § 43 ods. 1 písm. b
Záznam on the office's electronic form30 days from delivery162/1995 § 43 ods. 3

After a záznam the district office tells the persons whose right it affected within 15 days of the entry (§ 37).

What does it cost?

The fee act sets 100 euro for a proposal for vklad. It sets 50 euro if you file the proposal electronically (act 145/1995 Z. z., položka 11 písm. a, b, version from 1 November 2026). The version read for this page has no fee line for a proposal for záznam. The fee in force on the day you file applies.

The official verification of a geometric plan costs 40 euro for four copies (položka 10 písm. h). The maker of the plan pays it (poznámka 7). The surveyor's own price is set by contract. This page gives no figure because no dated official source exists.

What is the difference between vklad and záznam?

The cadastre act has three kinds of entry (§ 4 ods. 1). A vklad is an act of the district office by which a right to real estate arises, changes or ends (§ 5 ods. 1). A záznam records facts for evidence and does not change a right (§ 5 ods. 2). A poznámka marks a fact or a relation to real estate or to a person. It does not change a right either (§ 5 ods. 3).

A later sale or a mortgage of the building is a legal act. A contract on real estate names the building by its súpisné číslo. It also names the parcel under the building (§ 42 ods. 2 písm. c). The sources read for this page do not say that a sale needs a prior entry of the building. Ask the district office or a lawyer before you sign.

How do older buildings enter the cadastre?

The act has separate rules for older and removed buildings.

  • Approved before 1 October 1976: the municipality's notice gives the date of approval or use, the súpisné číslo and the builder (§ 46 ods. 7). The kolaudačné rozhodnutie or užívacie povolenie must have taken legal effect before that date.
  • Built from 1 October 1976 to 31 December 1989: the municipality's notice gives the date of building and the use. It also gives the súpisné číslo and the builder.
  • For that period the owner also submits a document. It shows the builder's right to the land under the building on 1 April 2024 (§ 46 ods. 10).
  • Removed building: a document under a special regulation and the municipality's confirmation that the building was removed or does not exist (§ 46 ods. 8).

A building built after 1989 without a permit follows a different route. See review of fitness for use.

What changes from 1 January 2027?

Amendment 243/2026 (Art. I applies from 1 January 2027) changes the list of attachments to the kolaudácia proposal. The geometric plan stays on the list. It moves from letter d to letter c of § 66 ods. 2. None of the articles of 243/2026 amends the cadastre act. See also cadastre of real estate and list vlastníctva.

Frequently asked questions

What is the difference between vklad and záznam?
A vklad is the entry by which a right to real estate arises, changes or ends (162/1995 Z. z., § 5 ods. 1). A záznam records facts for evidence and does not change a right (§ 5 ods. 2). A poznámka marks a fact or a relation and changes no right either (§ 5 ods. 3).
Does a garage or a veranda enter the cadastre?
The test in § 46 ods. 2 of the cadastre act is that walls and a roof structure enclose the building. The paragraph names no size limit and no building type. If a notified building gets no súpisné číslo, the owner is the person that the building office's notice names as the notifier.
How do I enter an old building in the cadastre?
For a building approved before 1 October 1976, the municipality's notice gives the date of approval or use. It also gives the súpisné číslo and the builder (§ 46 ods. 7). For one built from 1 October 1976 to 31 December 1989, the notice gives more. A document must also show the builder's right to the land on 1 April 2024 (§ 46 ods. 10).
How long does the entry of a new building take?
The cadastre act gives no period just for a new building. A decision on a vklad takes 30 days (§ 32 ods. 1). A záznam takes 60 days. It takes 30 days if you file on the office's electronic form (§ 43 ods. 1 písm. b, ods. 3).
What does the entry cost?
A proposal for vklad costs 100 euro, or 50 euro filed electronically (act 145/1995 Z. z., položka 11, version from 1 November 2026). The official verification of a geometric plan costs 40 euro for four copies. Its maker pays it (položka 10 písm. h, poznámka 7). The surveyor's own price has no official source.
Do I need a geometric plan to enter a new building?
Yes, for an entry under § 46 ods. 2 to 4 or 6 to 8. The proposal gives the number of the official verification of the plan (§ 24 ods. 1 písm. g). The cadastre uses only a plan that the district office has also verified (§ 67 ods. 5). The proposal for kolaudácia also attaches a plan, by type of building (25/2025, § 66 ods. 2 písm. d).

Sources

  1. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 4, 5, 6, 19, 21, 24, 32, 34, 35, 37, 42, 43, 46, 67
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 40 ods. 3 písm. h, § 66 ods. 1, 2, § 67 ods. 1, 2
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex · čl. I bod 149 až 162
  4. Zákon č. 40/1964 Zb. Občiansky zákonník · Slov-Lex · § 120 ods. 2
  5. Zákon Národnej rady Slovenskej republiky č. 145/1995 Z. z. o správnych poplatkoch · Národná rada Slovenskej republiky, via Slov-Lex · Položka 10 písm. h, položka 11 písm. a, b