Review of Fitness for Occupancy

A review of fitness for occupancy (preskúmanie spôsobilosti) is a procedure that finds a building built without a permit fit for use.

What is a review of fitness for occupancy?

A review of fitness for occupancy is a procedure that finds an unpermitted building fit for use. The Slovak name is preskúmanie spôsobilosti stavby na užívanie. It comes from § 140d of the old Building Act, zákon č. 50/1976 Zb. (version of 15 March 2025).

The owner of the building asks for it and the building office decides. If the owner proves the conditions, the office issues a decision on the fitness of the building for use. That decision has the effects of a kolaudačné rozhodnutie (§ 140d ods. 5).

Is the review the new name for kolaudácia?

No. The new name of the kolaudačné konanie is kolaudácia (§ 84 ods. 11 písm. c of zákon č. 25/2025 Z. z.). The review is a separate procedure. The transitional rules of the new act keep it for older unpermitted buildings (§ 84 ods. 7 písm. a).

AspectReview of fitness for occupancyKolaudácia
For whomThe owner of a building built and used without a permit or against it (§ 140d ods. 1 of zákon č. 50/1976 Zb.)The builder of a finished structure that needed a decision on the building intent (§ 66 ods. 1 of zákon č. 25/2025 Z. z.)
Who filesThe owner of the building (§ 140d ods. 1)The builder (§ 66 ods. 2)
RulesOld act, version of 31 March 2025 (§ 84 ods. 7 písm. a of zákon č. 25/2025 Z. z.)Act 25/2025
OutcomeDecision with the effects of a kolaudačné rozhodnutie (§ 140d ods. 5)Kolaudačné osvedčenie (§ 67 ods. 1)

Who can ask for a review?

The owner can ask if someone built and used the building without a permit, or against it, between 1 January 1990 and 31 March 2025. The owner must prove these conditions (§ 140d ods. 1).

  • The technical state and equipment of the building meet the basic requirements for buildings and suit its purpose of continuous use without defects. The office also finds that the building does not endanger life (písm. a).
  • The owner owns the land or has another right to it, and the settlement of the land under special rules took place (písm. b).
  • The builder did not build against the binding rules on land use in the planning documentation or against interests that special acts protect (písm. c).
  • The building is outside the zones of electrical lines, gas facilities and flood areas, or the operator of the infrastructure agrees (písm. d).
  • As-built documentation exists, if the office asks for it (písm. e).

Section 140d ods. 2 sets a special route for buildings in certain segregated localities. This page does not cover it.

Until when can the owner file?

The owner can file until 31 March 2029 under the text in force on 1 November 2026 (§ 84 ods. 7 písm. a of zákon č. 25/2025 Z. z.). Amendment 243/2026 Z. z. replaces this date from 1 January 2027. The date of promulgation of the amendment is 7 October 2026.

RouteText in force on 1 November 2026From 1 January 2027
Review of fitnessFiling until 31 March 2029 (§ 84 ods. 7 písm. a)Filing until 31 December 2040 (čl. I bod 224)
Subsequent permitFiling from 1 April 2025 to 31 March 2029 (§ 84 ods. 7 písm. b)Filing until 31 December 2040, only for a building built by 31 March 2025 (čl. I bod 224 and 225)

How does the procedure run?

  1. The owner files a request with documentation that proves the conditions. The documentation includes the binding opinions of the affected authorities (§ 140d ods. 4). The owner does not file them if the owner proved the facts in subsequent permit proceedings.
  2. The office that would have issued the kolaudačné rozhodnutie handles the request (§ 140d ods. 8). The municipality is an affected authority as the planning authority (§ 140d ods. 9). The regional office decides appeals (§ 84 ods. 9 of zákon č. 25/2025 Z. z.).
  3. The rules on kolaudácia apply by analogy (§ 140d ods. 5).
  4. If the office finds defects that prevent use, it interrupts the proceedings. It orders the necessary adjustments or securing works within a reasonable deadline (§ 140d ods. 6).
  5. If the owner proves the conditions, the office issues the decision (§ 140d ods. 5).
  6. If the owner does not prove them, or does not do the works, the office orders removal of the building (§ 140d ods. 7).

From 1 January 2027 the last step changes. The office then stops the review and sends the decision to stop to the building inspectorate (new § 84a ods. 1, čl. I bod 226 of zákon č. 243/2026 Z. z.).

Which documents does the owner file?

The act names facts to prove and no fixed list of documents (§ 140d ods. 4). The documentation must prove the conditions above. It includes the binding opinions of the affected authorities. The office may decide that documentation of the building in the scope of § 104 ods. 2 of the old act is enough (§ 140d ods. 4). It may also ask for as-built documentation (§ 140d ods. 1 písm. e).

The act names no test reports, measurement protocols or energy certificates for the review. Ask the building office which documents it wants for your building.

How long does the review take?

Section 140d sets no period for the decision. The sources opened for this page give no total duration, so this page states none.

Can an unpermitted building be approved after the fact?

Yes, by one of two old routes. The first is the review. The second is the subsequent permit (dodatočné povolenie stavby) of § 88a of the old act. The transitional rules apply the old rules to it. This holds if the building meets neither the conditions of a lawful building nor those of the review (§ 84 ods. 7 písm. b of zákon č. 25/2025 Z. z.).

Under the old act an office that found an unpermitted building started removal proceedings. It had to assess the review or the subsequent permit. It invited the owner to file within a deadline of at least 60 days (§ 88a ods. 1). If the owner filed for the review during a subsequent permit proceeding, the office stopped that proceeding (§ 88a ods. 11).

From 1 January 2027 the amendment also adds a third route. A new § 60 ods. 4 to 7 lets the office approve some unpermitted structures in the decision on the building intent (čl. I bod 129). Examples are a change of a completed simple structure, an outbuilding such as a garage, a fence and a house connection. If such a structure needs kolaudácia, the owner may use it only after the kolaudačné osvedčenie (new § 60 ods. 6).

What happens after a successful review?

The decision has the effects of a kolaudačné rozhodnutie (§ 140d ods. 5). Under the old act the owner could use a finished building only on the basis of that decision (§ 76 ods. 1).

Frequently asked questions

What is the preskúmanie spôsobilosti stavby na užívanie?
It is a procedure of the old Building Act 50/1976 that finds a building built without a permit fit for use. The decision has the effects of a kolaudačné rozhodnutie (§ 140d ods. 1 and 5 of zákon č. 50/1976 Zb.).
Is the review of fitness the new name for kolaudácia?
No. The new name of the kolaudačné konanie is kolaudácia (§ 84 ods. 11 písm. c of zákon č. 25/2025 Z. z.). The review is a separate procedure for older unpermitted buildings that the transitional rules keep (§ 84 ods. 7 písm. a).
Who can ask for the review and until when?
The owner can ask if someone built and used the building without a permit, or against it, from 1 January 1990 to 31 March 2025. The owner can file until 31 March 2029. From 1 January 2027 the date is 31 December 2040 (§ 140d ods. 1, § 84 ods. 7 písm. a and čl. I bod 224 of zákon č. 243/2026 Z. z.).
Can an unpermitted building be approved after the fact?
The act has no procedure called retroactive kolaudácia. Two old routes stay open for some owners: the review of fitness and the subsequent permit (§ 84 ods. 7 písm. a and b of zákon č. 25/2025 Z. z.). From 1 January 2027 the office can approve some unpermitted structures in the decision on the building intent (new § 60 ods. 4 to 7).
Which documents does the owner file for the review?
The act names facts to prove and no fixed list (§ 140d ods. 4 of zákon č. 50/1976 Zb.). The documentation must prove the conditions and include the binding opinions of the affected authorities. The office may also ask for as-built documentation (§ 140d ods. 1 písm. e).
What happens if the building fails the review?
If the owner does not prove the conditions, the office orders removal of the building (§ 140d ods. 7 of zákon č. 50/1976 Zb.). From 1 January 2027 the office stops the review and sends the decision to the building inspectorate (new § 84a ods. 1 of zákon č. 25/2025 Z. z.).

Sources

  1. Zákon č. 50/1976 Zb. o územnom plánovaní a stavebnom poriadku (stavebný zákon) · Slov-Lex · § 76, 88a, 140d
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 66, 67, 84 ods. 7 až 9, 11
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex · čl. I bod 129, 224 až 226