Energy Performance Certificate
An energy performance certificate is an official document that rates a building by calculated energy need and primary energy use.
What is an energy performance certificate?
An energy performance certificate is an official document that rates how much energy a building needs and places it in an energy class. In Slovakia the name is energetický certifikát budovy and the act on the energy performance of buildings (zákon č. 555/2005 Z. z.) governs it. The act defines it as the proof of a completed energy certification. EU Directive 2024/1275 sets common rules for all member states. This page covers the Slovak rules.
The certificate comes from a calculation. The calculation uses the building shell, the location and orientation, the heating and hot water systems, the ventilation and the climate. The result is a set of numbers in kWh per m² of floor area and year. They cover the energy need of the building and its primary energy. The certificate places these numbers in the classes of the energy class scale.
What does the certificate contain?
The certificate has to show the data that § 7 ods. 1 of the act lists. The main items are the description and address of the building and its category, for example family house or office building. They include the calculation results and the energy class with a graphic. They also include the validity, the annual energy consumption or the three-year average, and the share of renewable energy. It also names the qualified person who made it.
The certificate has annexes. The certificate can also point the owner to more information, for example on energy audits (Directive Art. 19(10)). They list the weak points of the building and give recommendations for cost-effective improvements. They also contain the calculation report and a one-page extract, the energy label (energetický štítok).
Under decree 364/2012 Z. z. the certificate shows more than one class. It shows a class for each place of energy use (for a house, heating and hot water). It shows a class for the total energy need of the building (A to G). It also shows a class for the global indicator, which is the primary energy (A0 to G). A building that sends out or stores energy gets the sub-class A0+.
What do the values and classes on the certificate mean?
The values are the calculated annual energy need and primary energy use, in kWh/(m²·year). The class shows where the value sits on the scale for the category of the building. A low value means a better class. An A1 certificate means the global indicator of the building is in class A1, which is the second-best class after A0. Our page on the energy class gives the boundaries for a family house. The decree sets the A0 limit at the level of a nearly zero-energy building (§ 4 ods. 15).
The classes describe a calculation for standard use of the building. The act says the calculation covers the "normalised use" of the building. Your real bills depend on how you use the house and on energy prices. The certificate does show the actual annual consumption as a separate item.
When do I need an energy performance certificate?
Certification is mandatory in three cases (§ 5 ods. 2 of the act). In every other case it is voluntary. The owner must hold the certificate by the dates in § 8 ods. 1.
| Case | Latest date for the certificate |
|---|---|
| A building or part of a building is sold or let to a new tenant | The day the contract is signed (§ 8 ods. 1 písm. c) |
| A new building is finished, or an existing building has a major renovation | The day the owner files for occupancy approval, unless the building office decides otherwise (§ 8 ods. 1 písm. a) |
| An authority uses more than 250 m² of the building and the public often visits it | The act names no date for this case |
If building works make the certificate invalid, the owner has two months to get a new one. The owner must give a valid certificate to a new owner and a copy to a tenant. A sale or rental offer must state the energy performance indicator from the certificate, also when an estate agent publishes the offer.
Which buildings do not need a certificate?
Section 2 ods. 2 of the act lists the buildings that are outside the rules on certification. These are:
- buildings and monuments protected for their architectural or historical value, if the rules would change their character or look unacceptably
- churches and other places of worship
- temporary buildings planned for use for less than two years
- industrial buildings, workshops and non-residential farm buildings with low energy use
- residential buildings used less than four months a year, or in a limited way with expected energy use below 25 % of year-round use
- detached buildings with a usable area below 50 m²
For a family house, § 5 ods. 3 allows a certificate to rely on the assessment of another family house. The two houses need similar architecture, size and energy performance, and the qualified person must show that they match.
How long is an energy performance certificate valid?
A certificate is valid for at most ten years (§ 7 ods. 7). It loses validity earlier if building works change the energy performance of the building. The EU directive uses the same ten-year maximum in Article 19(13). The certificate states its own end date.
Who can issue an energy performance certificate?
The ministry names the Slovak standards for the calculation (§ 9 ods. 1 písm. b of the act). See also STN 73 0540. A person who runs the trade of energy certification and has passed the professional exam can issue it (§ 6 ods. 1 of the act). The person needs a second-degree university degree in a matching field, such as construction, architecture, energy, mechanical or electrical engineering. The person also needs three years of practice in design or assessment. The qualified person sends the draft certificate to the central register before giving it to the owner (§ 7 ods. 6). The act text we read sets no price for the certificate.
What changes from 1 January 2027?
Amendment 246/2026 Z. z. came out on 8 October 2026 and takes effect on 1 January 2027. It transposes Directive 2024/1275, which set 29 May 2026 as the date for member states to bring in most of its rules. Slovakia missed that date. The table shows what the amendment changes for the certificate.
| Topic | Until 31 December 2026 | From 1 January 2027 |
|---|---|---|
| Issue | The qualified person sends the draft to the central register, then hands the certificate to the owner (§ 7 ods. 6) | The certificate is issued through the central register |
| Signature | Handwritten signature and stamp | Qualified electronic signature |
| Site visit | The act does not require one | Issued after an on-site inspection, or in justified cases a virtual inspection |
| Lease | Required for a new tenant | Also required when a lease is extended, and for a single unit of a building |
| Climate data | Not required | Global warming potential of new buildings, from 1 January 2028 above 1 000 m², from 1 January 2030 for all new buildings |
| Paper certificates | Valid | Valid until the end date or until replaced by an electronic one |
The amendment also adds a digital data platform run by the ministry and a voluntary building renovation passport. A passport issued with the certificate replaces the recommendations. The ministry sets the new class limits and the form of the certificate in a regulation. We did not find that regulation at the time of checking. Read also the page on the EPBD directive.
Frequently asked questions
- What is the difference between an energy performance certificate and an energy label?
- The energy label is a one-page extract of the certificate. The certificate is the full document with the calculation, the recommendations and the report. The act defines the label in § 7 ods. 2 písm. d) as the extract with the building data, the energy class, the validity and the renewable share.
- Does an A1 energy certificate mean the house is energy-efficient?
- A1 is the second-best class of the global indicator, which measures primary energy. Only class A0 is better. Under the decree 364/2012 Z. z., a new building built after 31 December 2015 had to reach at least A1, and since 2021 new buildings have to reach A0.
- When do I need an energy performance certificate?
- You need it when you sell a building or let it to a new tenant. You also need it when you finish a new building or a major renovation. The third case is a building of more than 250 m² that an authority uses and the public often visits. The certificate has to exist when you file for occupancy approval or sign the sale or lease contract.
- Which buildings are exempt from energy certification?
- Protected monuments, churches and temporary buildings of less than two years are exempt. So are low-energy industrial and farm buildings, holiday buildings used less than four months a year and detached buildings below 50 m². Section 2 ods. 2 of the act lists them.
- How long is an energy performance certificate valid?
- It is valid for at most ten years. It ends earlier if building works change the energy performance of the building, and then you have two months to get a new one.
- Who can issue an energy performance certificate in Slovakia?
- A person who runs the energy certification trade and has passed the professional exam. The person needs a second-degree university education in a matching field and at least three years of practice. From 1 January 2027 the certificate is issued through the central register with a qualified electronic signature.
Sources
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 2, § 3, § 5, § 6, § 7, § 8, § 14a
- Vyhláška Ministerstva dopravy, výstavby a regionálneho rozvoja Slovenskej republiky č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Ministerstvo dopravy a výstavby SR, via Slov-Lex · § 2, § 3, § 4, § 5, Príloha č. 5
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I body 30 to 44, 47 to 48, 61
- Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) · Európsky parlament a Rada, via Publications Office of the EU · Article 19, Article 20
- Financing a House Build: Mortgage and ŠFRB
- Energy certificate and class A0: what it rates and when
- Blower Door Test: When and Why to Do It
- Buying an Old House: What to Check
- House carbon footprint: what counts and from when
- Passive House Guide: Criteria, A0 and Certification
- Deep Renovation of a House: What Order to Do the Work In
- Occupancy Approval Step by Step + Checklist
- Green building certification: what is required