Energy Label
A building energy label is the one-page extract of an energy certificate. It is not the EU energy label on appliances.
What is an energy label?
A building energy label (energetický štítok) is the one-page extract of an energy performance certificate that shows the energy class of a building. This page is about that building label. It is not the EU energy label on appliances such as washing machines and refrigerators, which is a different document under a different law.
Both documents use letters from A to G and look alike, so people mix them up. The product label shows how efficient an appliance is. The building label shows how much energy a building needs. The sections below explain both.
What does the EU energy label on products show?
The EU product label is a graphic that rates the energy efficiency of a product. Regulation (EU) 2017/1369 sets the framework. It defines the label as a graphic diagram with a closed scale of the letters A to G. The scale uses seven colours, from dark green to red. The label informs customers about the energy efficiency and the energy consumption of the product (Article 2, point 19).
The European Commission says the label shows the language-neutral logo, the energy classes with the class of the model, the energy consumption and other parameters. It also carries a QR code that links to the product database EPREL. Some labels show extra data, such as noise or water consumption. Since 2021 the rescaled product groups use a simpler A to G scale instead of the older scale that ran from A+++ to D.
A new or rescaled label must start with no products in class A (Article 11, point 8). A majority of models should reach class A at least ten years later. This is why a new label shows few products in the top class.
What does a building energy label contain?
A building energy label contains an extract of the energy certificate. Section 7 ods. 2 písm. d) of the act on the energy performance of buildings (zákon č. 555/2005 Z. z.) says the extract holds these data:
- the name of the person or firm that made the certificate
- the description and address of the building
- the category of the building
- the technical and energy characteristics, with the energy class and its graphic
- the validity of the certificate
- the persons who made it, with their signatures
- the annual energy consumption or the three-year average
- the share of energy from renewable sources
The label has no data of its own. It repeats the certificate, so the class on the label equals the class on the certificate. Our page on the energy class explains the classes.
The class comes from a calculation of the energy need (§ 3 ods. 2). The calculation uses the thermal properties of the walls, roof and windows (§ 3 ods. 3 písm. a), which the U-value describes. A blower door test, which measures air leakage, is a separate measurement. The label has no field that says a house is a certified passive house.
What is the difference between an energy label and an energy certificate?
The energy certificate is the full document and the energy label is a one-page extract of it. The table compares the EU product label, the building label and the building certificate.
| EU product label | Building energy label | Building energy certificate | |
|---|---|---|---|
| Subject | A product, such as an appliance | A building or part of a building | A building or part of a building |
| Law | Regulation (EU) 2017/1369 | Act 555/2005 Z. z., § 7 ods. 2 | Act 555/2005 Z. z., § 7, and Directive 2024/1275 |
| Scale | A to G | A0 to G for primary energy, A to G for other scales | Same as the label |
| Made by | The supplier of the product puts it on the product | A qualified person, as part of the certificate | A qualified person with the right trade licence |
| Where to find more data | The QR code leads to the EPREL database | In the certificate | In the central register |
The certificate has more than the label. It also has the recommendations for cost-effective improvements and the calculation report (§ 7 ods. 2). Read the page on the energy performance certificate for the full rules.
When must a building show its energy label?
Some buildings must show the label in a place that is easy to see (§ 8 ods. 3). The owner has to put the label on show within five working days after he gets the certificate and the label. It stays on show while the certificate is valid. The table shows which buildings the duty covers.
| Period | Buildings that must show the label |
|---|---|
| Until 31 December 2026 | A building that a public authority uses on more than 250 m² and the public often visits. Also a building above 500 m² that the public often visits |
| From 1 January 2027 | A building from the first group that the public often visits, and any non-residential building |
A private family house does not have to show the label. The owner must still state the energy performance indicator from the certificate in an offer to sell or let the building (§ 8 ods. 5).
How is the energy label used in a sale or rental?
If a certificate exists, the offer to sell or let the building must state its energy performance indicator (§ 8 ods. 5). This also applies when an estate agent publishes the offer. The owner must also have the certificate when the contract is signed (§ 8 ods. 1). The buyer gets the valid certificate and the tenant gets a copy (§ 8 ods. 2).
What changes from 1 January 2027?
Amendment 246/2026 Z. z. takes effect on 1 January 2027 and transposes Directive 2024/1275. The duty to show the label widens as the table above shows. Certificates also move to the central register. The ministry will publish the model of the energy label in a regulation (§ 9 ods. 2 písm. g). We did not find that regulation at the time of checking. The class scale of the label changes as well, see the page on the energy class. Read also the page on the EPBD directive.
Frequently asked questions
- What is the difference between an energy label and a building energy certificate?
- The energy label is a one-page extract of the building energy certificate. The certificate is the full document with the calculation, the recommendations and the report. Section 7 ods. 2 písm. d) of act 555/2005 Z. z. defines the label as the extract.
- Is the EU energy label on appliances the same as the energy label of a building?
- No. The EU product label comes from Regulation (EU) 2017/1369 and rates a product such as an appliance. The building label comes from the Slovak act 555/2005 Z. z. and rates a building. Both use letters from A to G.
- What does an energy label mean?
- A building energy label shows the energy class of the building, with the validity of the certificate and the annual energy consumption. A product label shows the energy class of the product, its energy consumption and a QR code to the EPREL database.
- Which buildings must show an energy label?
- Buildings that a public authority uses on more than 250 m² and the public often visits must show it. So must buildings above 500 m² that the public often visits. The duty starts five working days after the owner gets the certificate and label.
- Does the energy label scale have the letter F?
- Yes. Both the EU product label and the building scale have the letter F. The product label shows seven classes from A to G. The Slovak building scale for primary energy runs from A0 to G, with F as the second-worst class.
- Where can I see the details behind a product energy label?
- Scan the QR code on the label. It links to the EPREL database of the European Commission, which has more data than the label itself. The Commission advises you to check that the web address starts with ec.europa.eu.
Sources
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 5 ods. 2, § 7 ods. 2 písm. d), § 8 ods. 1, 2, 3, 5
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I body 48, § 9 ods. 2 písm. g
- Nariadenie Európskeho parlamentu a Rady (EÚ) 2017/1369 zo 4. júla 2017, ktorým sa stanovuje rámec pre energetické štítkovanie a ktorým sa zrušuje smernica 2010/30/EÚ · Európsky parlament a Rada, via Publications Office of the EU · Art. 2 bod 19, Art. 11 ods. 8
- Understanding the Energy Label · European Commission, Energy Efficient Products
- Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) · Európsky parlament a Rada, via Publications Office of the EU · Article 19(2), Article 21