Building Renovation Passport

A building renovation passport is a roadmap for the deep renovation of one specific building, set out in a limited number of steps.

What is a building renovation passport?

A building renovation passport is a tailored roadmap for the deep renovation of a specific building. The roadmap has a maximum number of steps that significantly improve its energy performance. This is the definition in Article 2 point 19 of Directive (EU) 2024/1275, the recast energy performance of buildings directive. The Slovak amendment 246/2026 Z. z. uses the Slovak term pasport obnovy budovy. It describes it as a digital document on the course of a deep renovation, tailored to one building or building unit.

The passport serves a staged deep renovation, which is a deep renovation carried out in steps (Article 2 point 21). The directive says that a staged renovation needs careful planning so that one step does not block a later step (recital 42). The same recital notes that a one-step renovation can cost less and cause fewer emissions than a staged one.

Is the renovation passport mandatory?

No, the renovation passport is voluntary for owners, unless a Member State decides to make it mandatory (Article 12 paragraph 2). Slovakia has not made it mandatory. The amendment 246/2026 Z. z. states that the passport can be prepared voluntarily (new § 4c ods. 4 of act 555/2005 Z. z.).

Member States must also take measures so that renovation passports are affordable. They must consider financial support for vulnerable households that want to renovate (Article 12 paragraph 2).

Is the renovation passport available in Slovakia?

Not yet in law that applies on 31 October 2026. The directive required each Member State to introduce a passport scheme by 29 May 2026 (Article 12 paragraph 1). It required transposition by the same date (Article 35). Slovakia missed that date. The act 246/2026 Z. z. appeared in the Collection of Laws on 8 October 2026 and takes effect on 1 January 2027 (Article IV). It replaces § 4c of the act 555/2005 Z. z., which today covers the renovation strategy, with the new rules on the passport.

RegimeWhat it says about the passport
Slovak law in force on 31 October 2026No passport rules. The renovation strategy in § 4c ods. 2 písm. c) of act 555/2005 Z. z. names a voluntary passport scheme as an example of a policy.
Slovak law from 1 January 2027 (act 246/2026 Z. z.)New § 4c of act 555/2005 Z. z.: a voluntary digital document. A qualified person prepares it after an on-site visit. The central register issues it.
EU directive 2024/1275Member States introduce a scheme by 29 May 2026 (Article 12).

What does a renovation passport contain?

The directive lists the minimum content in Annex VIII. The passport includes:

  • the current energy performance of the building.
  • a graphic of the roadmap and its steps for a staged deep renovation.
  • the national requirements that apply, including minimum energy performance requirements and the rules to phase out fossil fuels for heating and cooling, with application dates.
  • a short explanation of the best order of the steps.
  • for each step:
    • the measures.
    • the estimated energy savings in kWh and in percent.
    • the estimated reduction of operational greenhouse gas emissions.
    • the estimated saving on the energy bill, with the cost assumptions stated.
    • the energy performance class expected after the step.
  • information on a possible connection to an efficient district heating and cooling system.
  • the share of renewable energy that the building can generate and self-consume after the renovation.
  • information on available funding and on technical advice and one-stop shops.

The Slovak § 4c ods. 2 is shorter. Each proposed step must contain the technology and materials and the estimated cost and time. It must also contain a comparison with the minimum energy performance requirements and the expected reduction of greenhouse gas emissions.

Who prepares a renovation passport?

A qualified or certified expert prepares it, after an on-site visit, in a digital format that is suitable for printing (Article 12 paragraph 4). In Slovakia from 1 January 2027, the person has the professional competence that § 6 ods. 1 to 3 of act 555/2005 Z. z. defines. This is the same qualification as for the energy performance certificate. The person prepares the passport together with the owner (new § 4c ods. 3). The central register of the energy performance of buildings issues the passport (new § 4c ods. 5).

When the expert issues the passport, the directive asks the expert to offer the owner a discussion. The discussion covers the best steps to reach a zero-emission building well before 2050 (Article 12 paragraph 5).

How does a renovation passport relate to the energy certificate and the energy audit?

A Member State may allow the passport to be drawn up and issued together with the energy performance certificate (Article 12 paragraph 3). In that case the passport replaces the recommendations of the certificate (Article 19 paragraph 6). Slovakia uses this option from 1 January 2027 (new § 4c ods. 4).

The energy audit is a separate document under the energy efficiency act 321/2014 Z. z. It does not replace the passport, and the passport does not replace the audit.

Frequently asked questions

What is a building renovation passport?
A building renovation passport is a tailored roadmap for the deep renovation of one specific building (Directive 2024/1275, Article 2 point 19). The roadmap has a maximum number of steps. It shows each step with its measures, energy savings, emission reduction and expected energy class.
Is a renovation passport mandatory?
No. It is voluntary for owners unless a Member State makes it mandatory (Article 12 paragraph 2). The Slovak amendment 246/2026 Z. z. keeps it voluntary.
Can I get a renovation passport in Slovakia now?
Not under Slovak law on 31 October 2026. The EU deadline was 29 May 2026 and Slovakia missed it. The new § 4c of act 555/2005 Z. z. takes effect on 1 January 2027.
What does a renovation passport contain?
It contains the current energy performance, a graphic roadmap of the steps and the order of the steps. For each step it states the measures, the savings, the emission reduction and the expected energy class (Annex VIII).
Who can issue a renovation passport?
A qualified or certified expert issues it after an on-site visit (Article 12 paragraph 4). In Slovakia from 1 January 2027, this is a person qualified under § 6 ods. 1 to 3 of act 555/2005 Z. z. for energy certificates.
Does the renovation passport replace the energy certificate?
No. It can be issued together with the certificate and then replaces only the certificate's recommendations (Article 19 paragraph 6, new § 4c ods. 4).

Sources

  1. Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) / Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · Európsky parlament a Rada EÚ, Úradný vestník EÚ L, 2024/1275, 8.5.2024 · Čl. 2 body 19 až 22, čl. 12, čl. 17 ods. 16 a 18, čl. 19 ods. 6, čl. 35, príloha VIII
  2. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 13, 29 a 60, Čl. IV
  3. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 7 a 8, § 4c ods. 2 písm. c)