Energy Audit
An energy audit is a systematic procedure that finds cost-effective ways to save energy in a building, a group of buildings or a site.
What is an energy audit?
An energy audit is a systematic procedure that collects information on current energy use. It finds and proposes cost-effective energy savings in a building, a group of buildings, an industrial or commercial site, or a service facility. Slovak law defines it in § 2 písm. j of the energy efficiency act 321/2014 Z. z. The act adds that the audit must be balanced and representative. It must rest on an economic, environmental and technical assessment that considers the life cycle of products and services.
An energy audit is not the same document as an energy performance certificate. The audit belongs to the energy efficiency act 321/2014 Z. z. The certificate belongs to the energy performance of buildings act 555/2005 Z. z. The section below compares the two.
When is an energy audit mandatory in Slovakia?
An energy audit is mandatory for a large enterprise, and the act gives that enterprise a choice. Under § 14 ods. 1, a large enterprise must do one of three things:
- have an energy audit carried out at least once every four years.
- introduce a certified energy management system.
- introduce a certified environmental management system with a matching scope.
A large enterprise is a business that is not a micro, small or medium enterprise (§ 3 písm. a). The act does not use employee or turnover figures of its own. It refers to the general definition of the small and medium enterprise.
Four further rules apply to enterprises:
- After four years, a large enterprise may ask the ministry's designated organisation for a confirmation. The confirmation works as an update of the audit for the next four years. The enterprise must show energy savings of at least 8 % of its final energy consumption in that period (§ 14 ods. 11).
- A large enterprise with a total energy consumption below 10 MWh in the last four years reports this. It then receives a confirmation that it met the duty (§ 14 ods. 14).
- A micro, small or medium enterprise may have an audit co-financed from public money or from international financial institutions. That enterprise must keep the report. It must also give the report to the monitoring system operator on request (§ 14 ods. 9).
- The audit must follow the energy efficiency first principle (§ 14 ods. 4).
The act does not put this duty on a private owner of a family house. If a subsidy call asks for an audit, the call text sets that condition, so read the call itself.
What does an energy audit contain?
The ministerial decree 179/2015 Z. z. on the energy audit sets the procedure and the content of the written report. The energy auditor identifies the subject of the audit and assesses its current state. The auditor proposes energy-saving measures and evaluates them economically and environmentally. The auditor then selects a set of recommended measures (§ 2 ods. 1). The auditor writes the report and a summary information sheet. The auditor also prepares a data set for the national energy efficiency monitoring system.
For each proposed measure the decree requires:
- a description of the measure.
- the energy saving in technical units.
- the saving in energy costs.
- the investment cost and the operating cost.
- the payback of the investment (§ 2 ods. 4).
The set of recommended measures also compares the energy balance before and after the measures. It states the emissions of pollutants and greenhouse gases for the previous calendar year (§ 2 ods. 5). The audited objects must account for at least 90 % of the client's total energy consumption (§ 2 ods. 2 písm. a).
Who can carry out an energy audit?
An energy auditor carries out the energy audit, as a business or as an employee of such a business (§ 13 ods. 1). An energy auditor is a natural person entered in the list of energy auditors. The ministry, or an organisation it designates, keeps and publishes the list (§ 12 ods. 1 and 2). A person enters the list after passing the professional competence exam (§ 12 ods. 4). The applicant needs one of these backgrounds (§ 12 ods. 5):
- secondary technical education and five years of practice,
- a bachelor degree and three years of practice,
- a master degree and two years of practice.
The practice must be in energy consulting or in technical and economic analysis of energy conversion, distribution or use. A person listed in another EU or EEA state may also carry out an audit (§ 13 ods. 3). This is a different qualification from the one that an energy certificate requires (§ 6 of act 555/2005, see below).
How does an energy audit differ from an energy performance certificate?
An energy audit proposes savings measures, and an energy performance certificate assigns a building to an energy class. The table compares the two documents under the Slovak acts that apply on 31 October 2026.
| Point | Energy audit | Energy performance certificate |
|---|---|---|
| Act | 321/2014 Z. z. on energy efficiency (§ 2 písm. j, § 14) | 555/2005 Z. z. on the energy performance of buildings (§ 5, § 7) |
| Duty | Large enterprises, every four years, or a certified management system | Sale or new rental of a building or unit (§ 5 ods. 2). Also public-authority buildings above 250 m² that the public often visits, and completion of a new building or major renovation. Otherwise voluntary. |
| Result | Written report with measures, costs, savings and payback | Energy class and a recommendation for cost-effective improvement (§ 5 ods. 1, § 7 ods. 2) |
| Who prepares it | Energy auditor from the ministry list | Qualified person who runs the energy certification trade (§ 6) |
| Validity | The act sets a four-year cycle for the large-enterprise duty | At most ten years, and it ends early if building works change the energy performance (§ 7 ods. 7) |
From 1 January 2027, the amendment 246/2026 Z. z. changes the cases in § 5 ods. 2 of act 555/2005. The certificate will then also apply when the parties extend a lease and for buildings that a public body owns or uses.
Is an energy audit part of a renovation passport?
No. A building renovation passport is a separate document. Amendment 246/2026 Z. z. introduces it in § 4c of act 555/2005 from 1 January 2027. It is a voluntary document. A qualified person prepares it after an on-site visit. The passport sets out the steps of a deep renovation. The energy audit under act 321/2014 does not replace it. The passport comes from the EU energy performance of buildings directive 2024/1275.
Frequently asked questions
- When is an energy audit mandatory in Slovakia?
- An energy audit is mandatory for a large enterprise, at least once every four years (§ 14 ods. 1 of act 321/2014 Z. z.). The enterprise may introduce a certified energy or environmental management system instead. A large enterprise is any business that is not a micro, small or medium enterprise.
- What is the difference between an energy audit and an energy certificate?
- An energy audit lists energy-saving measures with costs and payback under act 321/2014 Z. z. An energy certificate assigns an energy class under act 555/2005 Z. z. The certificate is mandatory when a building is sold or newly rented. The audit duty applies to large enterprises.
- Does a homeowner need an energy audit for a family house?
- No. The audit duty in § 14 of act 321/2014 Z. z. applies to large enterprises. The act sets no such duty for a private owner. A subsidy call may ask for an audit, so check the conditions of the call.
- What does an energy audit report contain?
- The report describes the current energy use and proposes measures. Each measure has the energy saving, the cost saving, the investment cost, the operating cost and the payback (decree 179/2015 Z. z., § 2). The auditor also prepares a summary information sheet and a data set for the monitoring system.
- Who can carry out an energy audit?
- An energy auditor from the ministry list carries out the audit (§ 12 and § 13 of act 321/2014 Z. z.). Entry requires a passed professional competence exam, technical education and two to five years of practice, depending on the education level.
- How often must an energy audit be repeated?
- A large enterprise must have the audit carried out at least once every four years. After four years it may apply for a confirmation that works as an update. It must have saved at least 8 % of its final energy consumption (§ 14 ods. 1 and 11).
Sources
- Zákon č. 321/2014 Z. z. o energetickej efektívnosti a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 2 písm. j, § 3 písm. a, § 12, § 13, § 14
- Vyhláška Ministerstva hospodárstva Slovenskej republiky č. 179/2015 Z. z. o energetickom audite · Ministerstvo hospodárstva SR, Slov-Lex · § 2
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 5, § 6, § 7
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 29 a 30, Čl. IV