Deep Renovation
A deep renovation is a renovation that turns a building into a nearly zero-energy building, and from 2030 into a zero-emission building.
What is deep renovation?
A deep renovation is a renovation that follows the energy efficiency first principle and focuses on the main building elements. It transforms a building or building unit into a nearly zero-energy building before 1 January 2030 and into a zero-emission building from that date. This is the definition in Article 2 point 20 of Directive (EU) 2024/1275, the recast energy performance of buildings directive. Before this directive, EU law had no such definition (recital 45).
A nearly zero-energy building is a building with a very high energy performance. A zero-emission building has a very high energy performance and, in addition, produces zero on-site carbon emissions from fossil fuels (Article 2 point 2).
How does Slovak law define deep renovation?
Slovak law has one definition in force and one that takes effect on 1 January 2027. The amendment 246/2026 Z. z. appeared in the Collection of Laws on 8 October 2026. Slovakia missed the EU transposition date of 29 May 2026. The table shows both Slovak texts next to the directive.
| Regime | Definition |
|---|---|
| Act 555/2005 Z. z., § 2 ods. 8, in force on 31 October 2026 | A major renovation of the building and of its technical equipment that brings the building into the energy class required for its building category. The renovation takes the economic life cycle of the building elements into account. |
| Act 555/2005 Z. z., § 2 ods. 9, from 1 January 2027 (act 246/2026 Z. z.) | A major renovation of the building and its technical equipment, in line with the energy efficiency first principle, focused on the main building elements. It changes the building or building unit in one go or in steps. The target is a nearly zero-energy building until 31 December 2029 and a zero-emission building from 1 January 2030. |
| Directive 2024/1275, Article 2 point 20 | The same two targets and the same dates as the Slovak text from 2027. |
The 2027 Slovak definition follows the directive. A building element is a technical building system or a part of the building envelope (new § 2 ods. 5).
What is the difference between deep renovation and major renovation?
A major renovation depends on its size. A deep renovation depends on its result. The directive calls a renovation major in two cases (Article 2 point 22). In the first case, the cost of work on the envelope or technical systems exceeds 25 % of the building value without the land. In the second case, the work covers more than 25 % of the envelope surface. Member States choose one of the two tests.
The current Slovak act uses the area test. A major renovation is a building alteration that touches more than 25 % of the envelope area (§ 2 ods. 7 of act 555/2005 Z. z.). It mostly insulates the walls and the roof and replaces the original windows and doors. A major renovation can be done in one go or in several partial alterations. A major renovation is also a case where an energy certificate is mandatory (§ 5 ods. 2 písm. c).
Does a 60 % cut in primary energy count as deep renovation?
Only for support and only if a zero-emission building is not feasible. Sometimes it is not technically or economically feasible to transform a building into a zero-emission building. In that case, a renovation that cuts primary energy use by at least 60 % counts as a deep renovation. This applies to the incentive rules of Article 17 paragraph 16 of the directive. From 1 January 2027, the Slovak amendment copies this rule into the new § 12a ods. 2 of act 555/2005 Z. z. It applies to the support of building renovation.
The 60 % figure is not the general definition. Primary energy is the energy before conversion, so the figure refers to the total energy input of the building. It does not refer to the heat the occupants use.
Can a deep renovation be done in stages?
Yes. The directive defines a staged deep renovation as a deep renovation in a maximum number of steps (Article 2 point 21). A renovation passport sets out the steps. The Slovak definition from 2027 says the building changes "in one go or in successive steps". See staged deep renovation for the planning side. The renovation passport is voluntary, so a deep renovation does not need one.
What support does the EU require for deep renovation?
Member States must incentivise deep renovation and staged deep renovation with higher financial, fiscal, administrative and technical support (Article 17 paragraph 16). Financial incentives target vulnerable households, people affected by energy poverty and people living in social housing as a priority (Article 17 paragraph 18). The directive also requires Member States to address the eviction of vulnerable households after disproportionate rent increases following an energy renovation (Article 17 paragraph 17). Read more on energy poverty.
From 1 January 2027 the Slovak act bans financial incentives for a stand-alone fossil-fuel boiler (new § 12a ods. 1 of act 555/2005 Z. z.). It excepts boilers selected for investment before 2025. Subsidy programmes, for example Obnov dom, set their amounts and conditions in each call, so check the call text.
Frequently asked questions
- What is deep renovation under EU law?
- Deep renovation is a renovation that follows the energy efficiency first principle. It transforms a building into a nearly zero-energy building before 2030 (Directive 2024/1275, Article 2 point 20). From 1 January 2030 it transforms a building into a zero-emission building.
- How does Slovak law define deep renovation?
- Act 555/2005 Z. z. defines it today as a major renovation of the building and its technical equipment (§ 2 ods. 8). The building must reach the energy class required for its building category. From 1 January 2027 the definition follows the directive (act 246/2026 Z. z.).
- Is a 60 % primary energy reduction a deep renovation?
- Only for support rules and only where a zero-emission building is not technically or economically feasible (Directive 2024/1275, Article 17 paragraph 16). Slovakia adopts the same rule from 1 January 2027 in § 12a ods. 2.
- What is the difference between deep renovation and major renovation?
- A major renovation depends on size, for example work on over 25 % of the envelope area (§ 2 ods. 7 of act 555/2005 Z. z.). A deep renovation depends on the target standard that the building reaches.
- Can a deep renovation be done in stages?
- Yes. A staged deep renovation is a deep renovation in a maximum number of steps. A renovation passport sets out the steps (Directive 2024/1275, Article 2 point 21). The Slovak definition from 2027 allows work in one go or in successive steps.
- Do I need a renovation passport for a deep renovation?
- No. The renovation passport is voluntary in the directive and in the Slovak amendment 246/2026 Z. z. It helps to plan the steps, but no rule makes it a condition of a deep renovation.
Sources
- Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) / Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · Európsky parlament a Rada EÚ, Úradný vestník EÚ L, 2024/1275, 8.5.2024 · Čl. 2 body 19 až 22, čl. 12, čl. 17 ods. 16 a 18, čl. 19 ods. 6, čl. 35, príloha VIII
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 13, 29 a 60, Čl. IV
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 7 a 8, § 4c ods. 2 písm. c)
- Asbestos in an Old House: Renovation Rules
- Replacing Windows in a House Renovation
- House Renovation: The Order of Steps
- Blower Door Test: When and Why to Do It
- Buying an Old House: What to Check
- Renovating a House in a Heritage Zone: Step by Step
- Obnov dom mini+: Renovation Subsidy Guide
- Deep Renovation of a House: What Order to Do the Work In