Minimum Energy Performance Requirement
A minimum energy performance requirement is a legal limit on energy use that a new or significantly renovated building must meet.
What is a minimum energy performance requirement?
A minimum energy performance requirement (MEPR) is a limit on the energy use of a building that the law sets. Article 5(1) of Directive (EU) 2024/1275 (EPBD) tells each Member State to set such requirements for buildings and building units. They must reach at least the cost-optimal level. Where relevant, they can be stricter, for example nearly zero-energy or zero-emission requirements.
The directive also requires requirements for the building elements of the envelope that have a significant effect on energy performance. They apply when someone replaces or retrofits those elements. Member States may set different requirements for new and existing buildings and for different building categories.
Slovak law uses the term "minimálne požiadavky na energetickú hospodárnosť budov". Act 555/2005 Z. z. sets them in § 4.
How does a minimum energy performance requirement differ from a minimum energy performance standard?
A requirement (MEPR) applies to a new building or to a building at a renovation. A standard (MEPS) applies to an existing building even if the owner plans no renovation. Article 2 of the directive defines minimum energy performance standards as rules that require existing buildings to meet an energy performance requirement. The rules apply as part of a renovation plan for a building stock or at a trigger point such as sale, rent or donation.
- For non-residential buildings, the directive requires standards (Article 9(1)). Buildings must stay below the 16 % threshold from 2030 and below the 26 % threshold from 2033. Each threshold is set so that 16 % or 26 % of the national non-residential stock lies above it.
- For residential buildings, the directive sets targets for the average primary energy use of the whole stock. It leaves the choice of tools to Member States. Such tools can be minimum energy performance standards, technical assistance and financial support (Article 9(2)).
Act 246/2026 Z. z. brings standards for non-residential buildings into Slovak law from 1 January 2027. The owner of a non-residential building must then ensure that the building meets the maximum values of energy performance (§ 8 ods. 13 as amended). For residential buildings, the act adds a national trajectory to the national plan (§ 4b as amended). It sets no such owner duty for a single house.
What is the requirement for a new building in Slovakia today?
A new building must meet the minimum requirements, and every new building must be a nearly zero-energy building from 31 December 2020. Act 555/2005 Z. z. says this in § 4 ods. 1 and § 4b ods. 1 písm. b) (version of 1 April 2025). For new buildings that public authorities own, the date was after 31 December 2018.
Decree 364/2012 Z. z. gives the technical rule in § 4 (version from 10 March 2020). It has three points.
- The global indicator is the primary energy in kWh per m² of floor area per year (§ 2 ods. 1, § 1 ods. 3). See primary energy.
- New buildings and significantly renovated buildings must reach the minimum requirement for the global indicator. That requirement is the upper limit of the energy class that belongs to the construction level (§ 4 ods. 14).
- The upper limit of class A0 sets the level of a nearly zero-energy building (§ 4 ods. 7 and 15). Class B sets the low-energy level and class A1 the ultra-low-energy level (§ 4 ods. 15).
The upper limits depend on two reference values for each building category. Rs is the average value of the existing building stock of that category. Rr is half of Rs (§ 4 ods. 1 and 2). The decree gives the limits of the classes as multiples of Rr and Rs. The table shows them.
| Energy class | Upper limit of the global indicator |
|---|---|
| A0 | 0.25 Rr, with the required supply of energy from renewable sources on site. |
| A1 | 0.5 Rr. |
| B | Rr. |
| C | 0.5 × (Rr + Rs). |
| D | Rs. |
| E | 1.25 Rs. |
| F | 1.5 Rs. |
| G | More than 1.5 Rs. |
The kWh/m² values of Rr and Rs are in annexes of the decree that this page did not read. For the classes in practice, see energy class.
Does the requirement apply to a renovation?
Yes, after a significant renovation, if this is technically, functionally and economically feasible. A significant renovation is work on more than 25 % of the envelope area. Examples are insulation of walls and roof or replacement of the original windows (§ 2 ods. 7). An existing building must then meet the requirements for new buildings (§ 4 ods. 1).
Sometimes a renovation changes the envelope and greatly affects energy performance. Then the designer must propose a solution. It must meet the requirements for a new building of the same function, location and category (§ 4 ods. 5, version of 1 April 2025). The directive says the same in Article 8(1) and adds a rule for single elements in Article 8(2).
What is the difference between the minimum requirement and the cost-optimal level?
The cost-optimal level is the energy performance with the lowest cost over the estimated economic life cycle of the building. The act defines it in § 4 ods. 6. The minimum requirement must reach at least this level. Member States may set stricter requirements (recital of Directive 2024/1275 on the setting of requirements).
Both are reviewed at regular intervals. Article 5(1) of the directive sets a limit of five years. The Slovak act says the ministry reviews the minimum requirements at least once in five years (§ 9 ods. 1 písm. g). Sometimes the requirements in force are less efficient than the cost-optimal level by more than 15 %. Then the Member State must adjust them within 24 months (Article 6(3)).
What changes with the EPBD recast and Act 246/2026?
Slovakia must transpose Directive (EU) 2024/1275 (Article 35). The deadline for most articles was 29 May 2026. Act 246/2026 Z. z. was promulgated on 8 October 2026 and takes effect on 1 January 2027. This table separates the regimes.
| Regime | New buildings | Renovated buildings |
|---|---|---|
| In force now (Act 555/2005 Z. z., version of 1 April 2025) | Nearly zero-energy building since 31 December 2020. | New-building requirements after a significant renovation, if feasible. |
| Act 246/2026 Z. z., from 1 January 2027 | Zero-emission building from 1 January 2028 if a public body owns it, and from 1 January 2030 for all new buildings. | Renovated structures meet the cost-optimal requirements in proportion to the extent of the renovation. This does not apply to technical systems. |
| Directive (EU) 2024/1275 | Zero-emission building from 1 January 2028 (public bodies) and 1 January 2030 (all), Article 7(1). | Requirements at major renovation, Article 8(1), and for single elements, Article 8(2). |
The act defines the zero-emission building. Its maximum primary energy need must be at least 10 % lower than the value required for a nearly zero-energy building (§ 2 ods. 12 as amended). For heritage buildings, the act allows only measures that do not unacceptably change the appearance or heritage value (§ 4 ods. 3 as amended).
How does a designer show that a building meets the requirement?
The designer includes the compliance in the design documentation for the building intent procedure. The designer states the result of the energy assessment in the technical report (§ 4 ods. 4 of Act 555/2005 Z. z.). The project energy assessment is a calculation from the design documentation (§ 4a ods. 2).
The owner needs an energy performance certificate when a new building or a significant renovation is complete (§ 5 ods. 2 písm. c). For details, see energy performance certificate.
Frequently asked questions
- What does MEPR stand for?
- MEPR stands for minimum energy performance requirement. Article 5(1) of Directive (EU) 2024/1275 requires Member States to set it for buildings and building units, at least at the cost-optimal level.
- What is the difference between MEPR and MEPS?
- A requirement (MEPR) applies to new buildings and to buildings at renovation. A standard (MEPS) applies to existing buildings, for example at sale or rent, or as part of a renovation plan for the building stock.
- What energy class must a new house in Slovakia reach?
- A new house must be a nearly zero-energy building. Decree 364/2012 Z. z. sets the level of such a building at the upper limit of class A0 for the global indicator (§ 4 ods. 7).
- How is the energy performance of a building calculated for the requirement?
- The global indicator is primary energy. It comes from the delivered energy of each energy carrier, multiplied by a primary energy conversion factor. The unit is kWh per m² of floor area per year (decree 364/2012 Z. z., § 1 ods. 3 and § 2 ods. 1).
- Does the requirement apply when I renovate a house?
- Yes, after a significant renovation of more than 25 % of the envelope area, if this is technically, functionally and economically feasible. The house must then meet the requirements for a new building (Act 555/2005 Z. z., § 2 ods. 7 and § 4 ods. 1).
- Does the new EPBD force owners of existing houses to insulate?
- The directive sets targets for the average primary energy use of the whole residential stock and leaves the tools to Member States (Article 9(2)). Act 246/2026 Z. z. gives owners a binding duty of this kind only for non-residential buildings.
Sources
- Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) / Directive (EU) 2024/1275 on the energy performance of buildings (recast) · European Parliament and Council, via EUR-Lex (Publications Office) · Art. 2, 5, 6, 7, 8, 9, 35
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 7, § 4, § 4a ods. 2, § 4b ods. 1, § 5 ods. 2, § 9 ods. 1 písm. g)
- Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Ministerstvo dopravy, výstavby a regionálneho rozvoja SR, via Slov-Lex · § 1 ods. 3, § 2 ods. 1, § 4 ods. 1, 2, 7, 8, 10, 14 a 15
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I body 14, 21 až 23, 26 a 53 (§ 2 ods. 12, § 4 ods. 1 až 3, § 4b, § 8 ods. 13)