Cost-Optimal Level

The cost-optimal level is the energy performance level of a building that gives the lowest cost during its estimated economic life cycle.

What is the cost-optimal level?

The cost-optimal level is the energy performance level of a building that gives the lowest cost during its estimated economic life cycle. Article 2 of Directive (EU) 2024/1275 defines it this way. It lists what the lowest cost takes into account:

  • the category and use of the building.
  • energy-related investment costs, based on official forecasts.
  • maintenance and operating costs, including energy costs and the cost of greenhouse gas allowances.
  • environmental and health externalities of energy use.
  • earnings from energy produced on site, where applicable.
  • waste management costs, where applicable.

Each member state sets the estimated economic life cycle. For a requirement on the whole building it is the remaining life cycle of the building. For a requirement on one element it is the life cycle of that element. The Slovak act defines the term in § 4 ods. 6 of zákon č. 555/2005 Z. z.

How do member states calculate the cost-optimal level?

Member states follow the comparative methodology framework in Delegated Regulation (EU) 2025/2273 of 30 June 2025. The framework applies from 1 January 2026 to the calculations that member states report to the Commission by 30 June 2028. It repeals Delegated Regulation (EU) No 244/2012, the earlier framework (Article 7). Annex I of the new regulation sets six steps:

  1. Define reference buildings for single-family buildings, apartment blocks and offices. Each category has at least one reference building for new buildings and at least two for existing buildings in major renovation.
  2. Define energy efficiency measures, renewable energy measures and packages of both for each reference building.
  3. Calculate the total primary energy use and the operational emissions of each reference building with each package.
  4. Calculate the global cost of each package as a net present value.
  5. Test how the result changes with energy prices and discount rates.
  6. Compare the global costs for each reference building and derive its cost-optimal level.

The global cost adds the initial investment cost, the annual costs and, where relevant, waste management costs. Member states run the calculation twice. The financial calculation uses the prices a customer pays, including taxes and VAT. The macroeconomic calculation leaves out taxes and subsidies. It adds the cost of greenhouse gas emissions and the cost of air pollution from energy use, at least for PM2,5 and NOx. Each member state decides which of the two becomes the national benchmark (Article 4(1)).

CalculationPrices usedExtra cost categories
FinancialPrices paid by the customer, with taxes, VAT and charges. Subsidies may be includedNone
MacroeconomicPrices without taxes, VAT, charges and subsidiesGreenhouse gas emissions, air pollutants from energy use

How long is the calculation period?

The calculation period is at least 30 years for residential and public buildings. For commercial non-residential buildings it is at least 20 years (Annex I, point 4.2(h)). The period may differ from the estimated economic life cycle, which the member state sets for each building and element. The member state picks the discount rate after testing at least two rates. For the macroeconomic calculation one of the tested rates must be 3 % in real terms (Annex I, point 4.4(e)).

How is the cost-optimal level used to set requirements?

Member states set minimum energy performance requirements with a view to at least the cost-optimal level (Article 5(1) of the directive). The same article lets them set stricter reference values, such as the requirements for nearly zero-energy buildings and zero-emission buildings. Other rules also refer to the cost-optimal level:

UseRuleArticle
Review of minimum requirementsAt least every five years, taking into account the cost-optimal calculation5(1)
Report to the CommissionInput data, assumptions and results, updated at intervals of no more than five years, first report on the revised framework by 30 June 20286(2)
Gap above 15 %Requirements in force are more than 15 % less energy-efficient than the cost-optimal level: the member state adjusts them within 24 months of the results6(3)
Building elements and systemsRequirements reach at least the cost-optimal level, for technical building systems the latest one5(1), 13(1)
Zero-emission buildingThe maximum energy demand is set with a view to at least the latest national cost-optimal level11(2)
Nearly zero-energy buildingNo worse than the 2023 cost-optimal level reported by member states2

Is the cost-optimal level the same as the legal minimum requirement?

No. The cost-optimal level is a calculated benchmark, and the minimum requirement is the value a member state writes into its law. The requirement must aim at least at the cost-optimal level, and a member state may set it stricter. The comparison tells whether the law is too weak. A gap of more than 15 % in the direction of weaker requirements forces an adjustment (Article 6(3)).

What does the cost-optimal level mean in Slovakia?

The Slovak ministry or a legal person it appoints determines the cost-optimal levels. It reports the input data and results to the European Commission and updates the report every five years (§ 9 ods. 3 of zákon č. 555/2005 Z. z., version of 1 April 2025). Subsidies for new buildings and for major renovation must take the cost-optimal level into account (§ 4b ods. 4). A designer sees the result in the minimum requirements that the building must meet (§ 4 ods. 1). The numeric limits sit in technical regulations and standards. Amendment 246/2026 Z. z. takes effect on 1 January 2027. After it, an existing building in major renovation must meet the cost-optimal requirements for the renovated structures. The requirement is in proportion to the scope of the work (§ 4 ods. 1). The amendment names the comparative methodology framework: Delegated Regulation (EU) 2025/2273 (§ 4 ods. 10).

Frequently asked questions

What is the cost-optimal level?
The cost-optimal level is the energy performance level that leads to the lowest cost during the estimated economic life cycle of a building. Article 2 of Directive (EU) 2024/1275 lists the costs. They are energy-related investment, maintenance and operation, energy, greenhouse gas allowances, externalities of energy use, on-site earnings and waste management.
How is the cost-optimal level calculated?
Member states compare packages of efficiency and renewable measures on reference buildings and calculate the global cost of each as a net present value. They follow Delegated Regulation (EU) 2025/2273 and run a financial and a macroeconomic calculation. The package with the lowest global cost gives the cost-optimal level for that reference building.
Is the cost-optimal level the same as the minimum energy performance requirement?
No. The cost-optimal level is a calculated benchmark and the minimum requirement is the value in national law. The requirement must aim at least at the cost-optimal level, and a member state may set it stricter.
What happens if the national requirements are far from the cost-optimal level?
If the requirements in force are more than 15 % less energy-efficient than the cost-optimal level, the member state adjusts them. It has 24 months from the results (Article 6(3) of the directive).
Which regulation sets the calculation method now?
Delegated Regulation (EU) 2025/2273 of 30 June 2025 sets the method. It applies from 1 January 2026 to the calculations reported by 30 June 2028. It repeals Delegated Regulation (EU) No 244/2012 as of 1 January 2026.
Does Slovak law use the cost-optimal level?
Yes. Zákon č. 555/2005 Z. z. defines it in § 4 ods. 6, makes the ministry or its appointee determine and report it to the European Commission (§ 9 ods. 3), and requires subsidies for new buildings and major renovation to take it into account (§ 4b ods. 4).

Sources

  1. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council of the EU, Official Journal L 2024/1275, 8.5.2024 · Articles 2, 5, 6, 11, 13
  2. Commission Delegated Regulation (EU) 2025/2273 of 30 June 2025 supplementing Directive (EU) 2024/1275 as regards the establishment of a comparative methodology framework for calculating cost-optimal levels of minimum energy performance requirements for buildings and building elements · European Commission, Official Journal L 2025/2273, 6.11.2025 · Articles 3, 4, 7, 8, Annex I
  3. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov (version 01.04.2025 to 31.12.2026) · Národná rada Slovenskej republiky, Slov-Lex · § 4 ods. 1 a 6, § 4b ods. 4, § 9 ods. 3
  4. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (promulgated 8 October 2026) · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 21 a 25