Reference Building Method

A reference building method tests efficiency measures on reference buildings to find the cost-optimal energy requirement level.

A reference building method is a procedure that tests efficiency measures on defined reference buildings to find the cost-optimal level of energy requirements. Slovak decree 364/2012 also uses the word reference for two numbers, Rr and Rs.

What is a reference building method?

In EU law, a reference building method applies the comparative methodology framework of directive 2024/1275 (Annex VII). Member States define reference buildings that are characterised by and representative of their functionality and geographic location, including indoor and outdoor climate. The reference buildings cover residential and non-residential buildings, new and existing. The result feeds the minimum requirements described in minimum energy performance requirement and the cost-optimal level.

How does the EU method work?

Annex VII of the directive lists four steps:

  1. define the reference buildings
  2. define the energy efficiency measures that are tested on them, for a whole building, for one element, or for a combination of elements
  3. assess the final and primary energy need and the resulting emissions of each reference building with the measures applied
  4. calculate the cost of the measures as a net present value over the expected economic life cycle

The comparison of the costs shows which level of requirements is cost-optimal. Member States calculate the levels with the framework and compare them with the requirements in force (Article 6(2)).

What does Slovak law say about cost-optimal levels?

Act 555/2005 defines the cost-optimal level as the energy performance level with the lowest cost over the estimated economic life cycle (§ 4 ods. 6). The calculation uses the comparative methodology framework of the delegated regulation (EU) 244/2012. It also uses parameters such as climate and the availability of energy infrastructure (§ 4 ods. 8). Incentives for new buildings and significant renovations must take the cost-optimal level into account (§ 4b ods. 4).

How often must the reference results be updated?

At intervals of at most five years. Member States update and submit the cost-optimal reports to the Commission at intervals of at most five years. The first report under the revised framework is due by 30 June 2028 (directive 2024/1275, Article 6(2)). Member States also review their minimum requirements at intervals of at most five years (Article 5(1)). If the requirements in force are less efficient than the cost-optimal level by more than 15 %, the Member State adjusts them. It has 24 months to do so (Article 6(3)).

What are the reference values Rr and Rs in Slovakia?

Rr and Rs are two numbers per building category and place of use. They are not modelled buildings. The decree defines Rs as the average energy need of the existing building stock in Slovakia for the category and place of use. It defines Rr as half of Rs (§ 4 ods. 1 and 2). Rr is the upper limit of class B and Rs is the upper limit of class D (§ 4 ods. 3 and 5). The energy certificate states both values for the category of the building.

Primary energy, kWh/(m²·year), Annex 3Rr (class B)Rs (class D)
Family house216432
Apartment block126252
Office building244488

How do Rr and Rs set the energy class?

The class limits are fixed multiples of Rr and Rs (decree, § 4 ods. 8). The table shows them with the family house values from the table above:

ClassGlobal indicator isFamily house, kWh/(m²·year)
A0up to 0.25 Rr (§ 4 ods. 10)54
A1up to 0.5 Rr108
Bup to Rr216
Cup to half of Rr plus Rs324
Dup to Rs432
Eup to 1.25 Rs540
Fup to 1.5 Rs648
Gover 1.5 Rsover 648

In the decree, the upper limit of class B is the low-energy level of construction. The upper limit of class A1 is the ultra-low-energy level. The upper limit of class A0 is the level of a nearly zero-energy building (§ 4 ods. 15). See low-energy house and nearly zero-energy building.

How are mixed-use buildings handled?

The reference values come from a weighted average. The decree weights the values of each category by the total floor area of the parts of the building and their use (§ 4 ods. 2). A part with another use that is not more than 10 % of the floor area does not change the category. The prevailing use decides (§ 1 ods. 8).

Does a Slovak designer model a reference building?

The decree text does not require a modelled reference building for the design. The designer calculates the global indicator of the building. The designer then compares it with the scale of its category in Annex 3, which uses Rr and Rs. The calculation follows the scope in Annex 1 of the decree, and the result goes into the project documentation (act, § 4 ods. 4). The reference building method sets the requirements, and the decree applies them. I did not find in the sources I opened how Slovakia chose its reference buildings for the EU cost-optimal reports.

What changes from 1 January 2027?

Act 246/2026 changes § 4 ods. 1 of act 555/2005. A new building must meet the minimum requirements for the cost-optimal level of a nearly zero-energy building. A significantly renovated building must meet the cost-optimal requirements for the renovated elements, in proportion to the renovation. The amendment takes effect on 1 January 2027 and it transposes the directive 2024/1275. I did not find new values of Rr and Rs in the texts I read.

Frequently asked questions

What is a reference building?
A reference building is a building defined to be representative of a building category, its function and its climate. Directive 2024/1275, Annex VII, requires Member States to define them for new and existing, residential and non-residential buildings.
What do Rr and Rs mean in Slovak energy classes?
Rs is the average energy need of the existing Slovak building stock for a category and place of use, and Rr is half of it. Rr ends class B and Rs ends class D (decree 364/2012, § 4 ods. 1 to 3).
What are the Rr and Rs values for a family house?
For primary energy, Rr is 216 and Rs is 432 kWh/(m²·year). For heating, Rr is 86 and Rs is 172. For total energy need, Rr is 110 and Rs is 220 (decree, Annex 3).
How often are the reference results updated?
At intervals of at most five years. The cost-optimal reports and the review of the minimum requirements both follow this interval (directive 2024/1275, Articles 5 and 6). The first report on the revised framework is due by 30 June 2028.
Is the reference building method a regulation?
No. It is the analysis that supports the requirements. Directive 2024/1275 sets the requirements at least at cost-optimal levels (Article 5(1)), and the Slovak decree sets the class limits.
What is the cost-optimal level in Slovak law?
It is the level of energy performance that gives the lowest cost over the estimated economic life cycle. The cost includes energy-related investment, maintenance, operation, energy and disposal (act 555/2005, § 4 ods. 6).

Sources

  1. Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) · Úradný vestník Európskej únie · Article 5(1), Article 6(1) to (3), Annex VII
  2. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex (Ministerstvo spravodlivosti SR) · § 4 ods. 4, 6 a 8, § 4b ods. 4
  3. Vyhláška Ministerstva dopravy, výstavby a regionálneho rozvoja Slovenskej republiky č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov · Slov-Lex (Ministerstvo spravodlivosti SR) · § 1 ods. 8, § 4 ods. 1 až 5, 8, 10 a 15, príloha č. 3, príloha č. 5
  4. Zákon, ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony (246/2026 Z. z.) · Slov-Lex (Ministerstvo spravodlivosti SR) · čl. I, bod 21