Low-Energy House

A low-energy house is a house with a low energy demand. It is a market term and Slovak law does not define it.

What is a low-energy house?

A low-energy house is a house with a low energy demand. It is a market term, and no Slovak act or decree defines it. The phrase "low-energy house" does not appear in Act 555/2005, in decree 364/2012 or in Directive (EU) 2024/1275 (text search of the texts read). Builders, designers and sellers use it for houses that need clearly less heating energy than older houses.

Because the term has no legal definition, a "low-energy house" from one seller can differ from the same name at another. Ask for the energy class on the energy performance certificate and for the calculated values.

Does Slovak law define a low-energy level of construction?

Yes, but it defines a level and not a house type. Decree 364/2012 § 4 ods. 15 says the upper limit of energy class B on the global indicator sets the low-energy level of construction (nízkoenergetická úroveň výstavby). The upper limit of class A1 sets the ultra-low-energy level, and the upper limit of class A0 sets the level of a nearly zero-energy building.

The decree builds the classes from two reference values for each building category. Rs is the average energy need of the existing building stock. Rr is half of Rs (§ 4 ods. 1 and 2). Class A1 ends at 0.5 Rr and class B ends at Rr (§ 4 ods. 8).

For a family house, Annex 3 of the decree (version from 10 March 2020, read in the PDF) gives these limits for the global indicator:

Energy classLevel of construction in § 4 ods. 15Global indicator of a family house, kWh/(m²·a)
A0Nearly zero-energy buildingup to 54
A1Ultra-low-energy55 to 108
BLow-energy109 to 216
Cnone named217 to 324

The same annex also gives a scale for heating energy need alone. For a family house, class A is up to 43 kWh/(m²·a) and class B is 44 to 86.

Can a new house be built to the low-energy level today?

No. A new house must reach class A0, which is stricter than the low-energy level. Decree 364/2012 § 5 ods. 3 sets class A1 as the minimum for new buildings built after 31 December 2015. Section 5 ods. 4 sets class A0 for all other new buildings built after 31 December 2020. A new house at the class B limit would not meet this minimum.

The low-energy level still matters for existing houses. A house with a class B result is far better than the existing stock, because Rs is the average of that stock.

How does a low-energy house differ from a nearly zero-energy building and a passive house?

A low-energy house is a market term. A nearly zero-energy building is a legal level. A passive house is a certified standard. The table shows who defines each.

TermDefined byWhat it means
Low-energy houseNobodyMarket term for a house with low energy demand
Low-energy level of constructionDecree 364/2012 § 4 ods. 15Upper limit of class B on the global indicator
Nearly zero-energy buildingAct 555/2005 § 2 ods. 10, decree § 4 ods. 15Class A0 and a high share of renewable energy
Passive housePassive House InstituteCertified building standard with five core principles, including airtightness
PHI Low Energy BuildingPassive House InstituteCertified standard for buildings that aimed at the passive house standard and barely missed it

The Passive House Institute gives the numeric criteria in its Building Criteria document, and this page does not copy them. See passive house and passive house classes. See the blower door test for how to measure airtightness and heat recovery ventilation for the ventilation of airtight houses.

Who uses the term "low-energy house"?

Three groups use it, each with a different meaning. The Slovak decree uses the low-energy level for class B. The Passive House Institute uses "Low Energy Building" as the name of one of its certified standards. Builders and sellers use "low-energy house" without a fixed meaning. The word has translations, such as nízkoenergetický dom in Slovak and Niedrigenergiehaus in German. This page does not state other national meanings. The sources read cover only Slovak law, the EU directive and the Passive House Institute.

What changes from 1 January 2027?

Act 246/2026 changes the class scale from A to G to A0 to F from 1 January 2027 (§ 3 ods. 7 as amended). The amending act does not use the phrase "low-energy". The sources read do not show whether the new implementing rule keeps the low-energy level of construction. The numeric limits for the new scale are not in them either. Check the new implementing rule before you set class B as a target for a project that falls under it. See zero-energy house for the higher levels.

Frequently asked questions

What is a low-energy house?
A low-energy house is a house with a low energy demand. It is a market term, and Slovak law does not define it. The decree names a low-energy level of construction, which is the upper limit of energy class B.
Is a low-energy house defined in Slovak law?
No. Act 555/2005 and decree 364/2012 do not define a low-energy house. Decree 364/2012 § 4 ods. 15 defines only the low-energy level of construction as the upper limit of class B.
What is the difference between a low-energy house, a passive house and a nearly zero-energy building?
A low-energy house is an undefined market term. A passive house is a standard certified by the Passive House Institute. A nearly zero-energy building is a legal level that Slovak law places at class A0.
How many kWh per square metre does a low-energy family house use?
There is no legal figure for a low-energy house. The decree's class B limit for a family house is 216 kWh/(m²·a) of primary energy. For heating energy need alone it is 86 kWh/(m²·a). Both values are in annex 3, version from 10 March 2020.
Can I still build a low-energy house in Slovakia?
You can build one only if it also meets class A0. That is the minimum for new buildings built after 31 December 2020 (decree 364/2012 § 5 ods. 4). A house that reaches only class B does not meet it.
Is the Passive House Institute standard the same as a low-energy house?
No. The Passive House Institute certifies a Passive House standard and a separate PHI Low Energy Building standard. It describes the second for buildings that aimed at the passive house standard and barely missed it.

Sources

  1. Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · § 4 ods. 1, 2, 8, 15, § 5 ods. 3 a 4, Príloha č. 3
  2. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 10
  3. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · čl. I bod 19
  4. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council, Official Journal of the EU · Article 2
  5. Passive House requirements and certification classes · Passive House Institute