Zero-Energy House

A zero-energy house is a building whose on-site renewable energy covers over one year at least the energy it takes from outside.

What is a zero-energy house?

A zero-energy house is a building that, over one year, exports at least as much renewable energy as it takes in from outside. Slovak law does not define "zero-energy house" (nulový dom). It is an industry label, so the exact test depends on who defines it. The best-known definition comes from the U.S. Department of Energy (DOE). It defines a zero energy building as an energy-efficient building. Over one year, on a source energy basis, the energy delivered to it is at most the renewable energy it exports from on-site generation. The same report says that Net Zero Energy and Zero Net Energy mean the same as Zero Energy.

Zero energy therefore does not mean zero use. The house still uses energy and may take it from the grid. Only the yearly balance must come out at zero or better.

Who defines "zero energy", and what do the other labels mean?

Each label has its own owner and its own test, so a house can meet one and miss another.

LabelWho defines itWhat it requires
Zero Energy BuildingU.S. Department of Energy, 2015Annual delivered energy is at most the on-site renewable energy exported, counted on a source energy basis.
Nearly zero-energy building (budova s takmer nulovou potrebou energie)Slovak law 555/2005 Z. z., § 2 ods. 10, and EU Directive 2024/1275, Art. 2Very high energy performance, with the small remaining energy need covered to a high extent by renewable energy in or near the building.
Zero-emission building (budova s nulovými emisiami)EU Directive 2024/1275, Art. 2. Slovak law from 1 January 2027Very high energy performance, no on-site carbon emissions from fossil fuels, and a limit on energy demand.
Passive House Classic, Plus, PremiumPassive House Institute, Criteria for Buildings, Version 10cLimits on renewable primary energy demand and, for Plus and Premium, a minimum renewable energy generation. See Passive House classes.

Neither Directive (EU) 2024/1275 nor the Slovak act defines the words "zero-energy building", "net zero" or "plus-energy". Article 2 of the Directive defines only the nearly zero-energy building and the zero-emission building.

Is a zero-energy house the same as a nearly zero-energy building?

No. A nearly zero-energy building is a legal term with a performance limit, and a zero-energy house is a label with an annual balance. Section 2 ods. 10 of Act 555/2005 Z. z. says that a nearly zero-energy building has very high energy performance. Effective thermal protection must keep its energy need nearly zero or very small. Renewable energy in or near the building must supply that need to a high extent. The act does not require a zero balance.

The limit sits in Decree 364/2012 Z. z. The decree sets the upper limit of energy class A0 for the global indicator as the minimum for nearly zero-energy buildings (§ 4 ods. 7). The global indicator is primary energy (§ 2). Under § 5 ods. 4, that limit applies to two groups of new buildings. The first group is buildings owned by public authorities and built after 31 December 2018. The second group is all other new buildings built after 31 December 2020. The numeric class limits are in the decree's annexes, which this page does not print. See nearly zero-energy building and energy class.

What is a zero-emission building, and when must new buildings in Slovakia meet it?

A zero-emission building has very high energy performance and very low energy demand (Directive 2024/1275, Art. 2 point 2). It causes no on-site carbon emissions from fossil fuels. It also produces zero or very little operational greenhouse gas emissions. The Directive required Member States to transpose these rules by 29 May 2026 (Art. 35(1)). Slovakia did this in Act 246/2026 Z. z., promulgated on 8 October 2026 and in force from 1 January 2027. The act adds the zero-emission building to § 2 ods. 12 to 14 of Act 555/2005 Z. z.

FromRule for new buildingsSource
Built after 31 December 2018 (public authorities) or 31 December 2020 (all others)Nearly zero-energy level, which is the upper limit of class A0Decree 364/2012 Z. z., § 5 ods. 4
1 January 2027Zero-emission building defined in Act 555/2005 Z. z. The class scale runs from A0 to FAct 246/2026 Z. z.
1 January 2028New buildings owned by public bodies are zero-emission buildingsDirective 2024/1275, Art. 7(1). Act 246/2026 Z. z., § 4 ods. 2 as amended
1 January 2030All new buildings are zero-emission buildingsDirective 2024/1275, Art. 7(1). Act 246/2026 Z. z., § 4 ods. 2 as amended

A zero-emission building is not the same as a zero-energy house. Its energy demand must stay under a maximum threshold. That threshold is at least 10 % lower than the national threshold for nearly zero-energy buildings (Directive Art. 11(3), Slovak § 2 ods. 12).

The building covers its annual primary energy from one of four sources. These are renewable energy made on site or nearby, a renewable energy community, efficient district heating and cooling, or carbon-free sources. Where that is not technically or economically feasible, other grid energy may cover it (Art. 11(7), Slovak § 2 ods. 13 and 14). A balance with on-site generation is not required.

What does a zero-energy house need on the roof?

The DOE definition names no technology. It requires on-site renewable energy that is exported, and photovoltaic panels are the usual source. Under the EU rules a zero-emission building has more options, as the previous section lists. See photovoltaic panel and PV self-consumption.

How does a zero-energy house differ from a plus-energy house?

The DOE wording allows delivered energy to equal the exported energy or to fall below it. A building with a surplus therefore still counts as a zero energy building. A plus-energy house is a stricter label that names a surplus or a minimum generation. The plus-energy house page compares the Passive House Institute, German federal and Slovak A0+ definitions.

Which definition should a Slovak design brief name?

A brief that says only "zero-energy" is open to two readings. It should name the test, such as the DOE definition, a Passive House class, or the Slovak class A0 or A0+. In Slovakia the binding minimum for a new house built after 31 December 2020 is the nearly zero-energy level (class A0 limit). Zero-emission rules follow from 2028 for public bodies and from 2030 for all new buildings. Other labels are voluntary. For the EU framework see the EPBD.

Frequently asked questions

Does a zero-energy house use no energy?
No. A zero-energy house still uses energy and may take it from the grid. The DOE definition requires only one thing. Over one year, delivered energy must be at most the on-site renewable energy it exports, counted on a source energy basis.
Is a net-zero house the same as a zero-energy house?
Yes, in the DOE definition. The DOE report "A Common Definition for Zero Energy Buildings" (2015) says that Net Zero Energy and Zero Net Energy are in wide use. It says they convey the same meaning as Zero Energy.
What is a zero-energy house called in Slovak law?
Slovak law has no term for it. The term "nulový dom" is a label. The legal term is "budova s takmer nulovou potrebou energie" (nearly zero-energy building) in § 2 ods. 10 of Act 555/2005 Z. z. Act 246/2026 Z. z. adds the "budova s nulovými emisiami" (zero-emission building) from 1 January 2027.
Is a nearly zero-energy building the same as a zero-energy house?
No. A nearly zero-energy building has very high energy performance and covers its small remaining need to a high extent with renewable energy. It does not need a zero annual balance. Since 2021 every new Slovak building must reach this level (class A0 limit, Decree 364/2012 Z. z., § 5 ods. 4).
Does EU law define a zero-energy building?
No. Article 2 of Directive (EU) 2024/1275 defines the nearly zero-energy building and the zero-emission building. The words "zero-energy building" and "plus-energy building" are not defined terms in the Directive.
What is the difference between a zero-energy house and a plus-energy house?
A zero-energy house balances its energy over a year. A plus-energy house goes beyond that. The label sets a surplus or a minimum generation, such as Passive House Premium or the Slovak A0+ class. The DOE wording of zero energy also allows a surplus.

Sources

  1. A Common Definition for Zero Energy Buildings · U.S. Department of Energy, Building Technologies Office (with the National Institute of Building Sciences), September 2015 · Definition of Zero Energy Building (ZEB)
  2. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov (version 01.04.2025 to 31.12.2026) · Národná rada Slovenskej republiky · § 2 ods. 10, § 4b ods. 1
  3. Vyhláška Ministerstva dopravy, výstavby a regionálneho rozvoja Slovenskej republiky, ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (version from 10.03.2020) · Ministerstvo dopravy, výstavby a regionálneho rozvoja Slovenskej republiky · § 2, § 4 ods. 7, 10 a 11, § 5 ods. 4
  4. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (promulgated 08.10.2026, in force 01.01.2027) · Národná rada Slovenskej republiky · Čl. I bod 14 (§ 2 ods. 12 až 14), bod 19 a 20 (§ 3 ods. 7 a 8), bod 22 (§ 4 ods. 2)
  5. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council, OJ L, 8.5.2024 · Art. 2 points 2 and 3, Art. 7(1), Art. 11, Art. 19(2), Art. 35(1)
  6. Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c (January 2023) · Passive House Institute, Darmstadt · Section 2.1, Table 1