Renewable Energy Source Share
The renewable energy source share is the part of a building's energy that comes from renewable sources on site or nearby.
What is the renewable energy source share of a building?
The renewable energy source share is the part of a building's energy that comes from renewable sources on site or nearby. In Slovak it is podiel obnoviteľných zdrojov. Decree 364/2012 lists it as an item of the energy evaluation report (Annex 4, item t). The calculation procedure in the same annex has a step "calculate the share of energy delivered from renewable sources on site" (step 11).
The share is not an energy class. It is one result of the evaluation behind the energy performance certificate, next to primary energy and carbon dioxide emissions. The class of the building depends on the global indicator, not on the share.
What counts as renewable energy in a Slovak building calculation?
Only renewable energy produced on site lowers the delivered energy in the calculation. Decree 364/2012 § 2 ods. 3 names the places where such equipment may stand:
- inside the conditioned spaces within the building boundary.
- on the building boundary, if fixed to the building.
- outside the boundary, in unheated parts of the building.
- on the plot used with the building, if the building uses the energy.
Energy from equipment outside the plot counts as produced nearby (§ 2 ods. 4). The calculation reduces the need for heat by on-site renewable heat (§ 2 ods. 5). It reduces the need for electricity by on-site renewable electricity (§ 2 ods. 6).
Is there a minimum renewable share for a new building?
No percentage appears in the Slovak texts read. Act 555/2005 § 2 ods. 10 says a nearly zero-energy building covers its energy need "to a high degree" from renewable energy in or near the building. Directive (EU) 2024/1275 Article 2 point 3 says "to a very significant extent". Decree 364/2012 § 4 ods. 10 gives the class A0 limit of 0.25 Rr "with the required renewable energy on site". The result is a primary energy limit and not a share.
See nearly zero-energy building for the A0 requirement and its dates.
How does renewable energy change primary energy and the energy class?
Renewable energy lowers the primary energy because the decree applies a factor of non-renewable primary energy to each energy carrier. Annex 2 of the decree (version from 10 March 2020, read in the PDF) lists the factors, called fPnren. The calculation procedure applies "factors of non-renewable primary energy" to the delivered energy (step 12). A carrier with a low factor adds little to the global indicator.
| Energy carrier in Annex 2 | Factor of non-renewable primary energy |
|---|---|
| Photovoltaics | 0.0 |
| Logwood in a biomass boiler | 0.10 |
| Wood chips in a biomass boiler | 0.15 |
| Wood pellets in a biomass boiler | 0.20 |
| Natural gas | 1.1 |
| Electricity from the grid | 2.2 |
Example with the factors above. A house buys 10,000 kWh of electricity a year, which gives 22,000 kWh of primary energy. If panels on the roof supply 4,000 kWh of that and the house uses all of it, the house buys 6,000 kWh. Its primary energy falls to 13,200 kWh. The real calculation also covers export, storage and the monthly profile, so this example only shows the direction.
The global primary energy indicator divides this primary energy by the floor area, and the result sets the energy class.
What is the difference between the renewable share and primary energy?
The renewable share is a proportion of delivered energy, while primary energy is an amount in kWh per square metre and year. A house can have a high share and still use much energy. A high share does not by itself give a good class. The class depends on the primary energy that remains after the factors of Annex 2.
Where do I find the official primary energy factors?
The factors are in Annex 2 of decree 364/2012. Slov-Lex shows the legally binding annex as a PDF. The decree takes some factors from a technical standard that is paid. It points to decree 308/2016 for the factor of centralised heat supply. Annex 2 lists district heating at 1.3 and, from combined heat and power, at 0.7. These values apply where a calculation is not possible.
What changes from 1 January 2027?
Act 246/2026 adds the zero-emission building to Act 555/2005 from 1 January 2027. The act says the annual primary energy of such a building may be covered in four ways:
- by renewable energy produced on site or nearby.
- by energy from a renewable energy community.
- by an efficient district heating and cooling system.
- by carbon-free sources.
If this is not technically or economically feasible, other energy from the grid may cover the need (§ 2 ods. 13 and 14 as amended). Directive 2024/1275 Article 11 point 7 sets the same four ways. From 1 January 2027 the new § 8d requires solar energy equipment on a new public building. The duty also covers a new non-residential building over 250 m². It applies if it is technically, functionally and economically feasible. For a new residential building (bytová budova), § 8d ods. 1 písm. e) sets 1 January 2030.
| Regime | Rule on renewable energy |
|---|---|
| Until 31 December 2026 | NZEB covers its need to a high degree from renewable energy, A0 limit is 0.25 Rr with on-site renewables |
| From 1 January 2027 | Zero-emission building definition, four ways to cover primary energy, solar duty for new public and large non-residential buildings |
| From 1 January 2030 | New residential buildings fall under the solar duty, all new buildings are zero-emission buildings |
Frequently asked questions
- What counts as renewable energy in a Slovak energy calculation?
- Energy from renewable sources produced on site, such as photovoltaic panels or solar collectors on or at the building. Decree 364/2012 § 2 ods. 3 lists the places. Equipment outside the plot gives energy produced nearby (§ 2 ods. 4).
- Is there a minimum percentage of renewable energy for new buildings?
- No percentage appears in Act 555/2005 or in decree 364/2012. The act requires a nearly zero-energy building to cover its need to a high degree from renewable energy. The decree sets the class A0 limit at 0.25 Rr.
- How does the renewable share differ from primary energy?
- The renewable share is a proportion of the delivered energy. Primary energy is the amount in kWh/(m²·a) after applying factors to each carrier. The energy class depends on primary energy.
- What factor does photovoltaic electricity have in the Slovak calculation?
- Photovoltaic electricity has a factor of non-renewable primary energy of 0.0 in Annex 2 of decree 364/2012 (version from 10 March 2020). Grid electricity has 2.2 and natural gas 1.1.
- Where does the renewable share appear in the evaluation of a building?
- It appears as item t of the energy evaluation report in Annex 4 of decree 364/2012. The calculation procedure has a step that computes the share of energy delivered from renewable sources on site (step 11).
- Does the renewable requirement change from 2027?
- Yes. Act 246/2026 adds the zero-emission building from 1 January 2027. Its annual primary energy must come from on-site or nearby renewables, a renewable energy community, efficient district heating or cooling, or carbon-free sources.
Sources
- Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · § 2 ods. 1 až 6, § 4 ods. 10, Príloha č. 2, Príloha č. 4
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 10
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · čl. I bod 14, 22, § 8d
- Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council, Official Journal of the EU · Article 2 point 3, Article 11 points 1 and 7