Biomass Boiler
A biomass boiler is a solid fuel boiler that burns wood, pellets or other biological material to heat water for a heating system.
What is a biomass boiler?
A biomass boiler is a solid fuel boiler that burns biomass to heat the water of a central heating system. Regulation (EU) 2015/1189 defines a solid fuel boiler as a device that provides heat to a water-based central heating system. Slovak law defines biomass as the biodegradable part of products, waste and residues of biological origin from agriculture, forestry and related industries (Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. d). In Slovak the term is kotol na biomasu.
What fuels can a biomass boiler burn?
A biomass boiler burns woody biomass, and the regulation names five forms: log wood, chipped wood, pellets, briquettes and sawdust. The preferred fuel is the single fuel the manufacturer names in the instructions. The boiler must meet the ecodesign limits with that fuel and with any other suitable fuel. A pellet boiler is the type that burns only pellets.
The Slovak Innovation and Energy Agency (SIEA) gives these figures for the main fuels:
| Fuel | Data from the SIEA publication |
|---|---|
| Pellets | 6 to 8 mm diameter, 10 to 30 mm long, moisture 8 to 10 % |
| Briquettes | 15 to 25 cm long, density about 1 200 kg/m³ |
| Log wood | Usually 30 to 50 cm long, moisture 15 to 55 % |
SIEA also says fresh wood should be stored for two to three years before use. A gasification boiler needs wood with moisture of 25 % or less. The publication has no date.
What types of biomass boiler exist?
SIEA describes three common types for houses: a grate boiler for logs, a wood gasification boiler and a pellet boiler. The regulation also separates automatically stoked boilers from manually stoked boilers, because the emission limits differ. SIEA gives these efficiencies:
- Older grate boilers reach 65 to 70 % in practice.
- Wood gasification boilers reach more than 85 %. They run best at 50 to 100 % of rated output.
- Modern pellet boilers reach more than 90 %.
What efficiency and emission limits must a biomass boiler meet?
A solid fuel boiler of 500 kW or less sold in the EU must meet the minimums of Regulation (EU) 2015/1189 since 1 January 2020. Seasonal space heating energy efficiency must be at least 75 % up to 20 kW and at least 77 % above 20 kW. The emission limits are in mg/m³.
| Pollutant | Automatically stoked | Manually stoked |
|---|---|---|
| Particulate matter | 40 | 60 |
| Organic gaseous compounds | 20 | 30 |
| Carbon monoxide | 500 | 700 |
| Nitrogen oxides, as nitrogen dioxide | 200 for biomass boilers | 200 for biomass boilers |
The nitrogen oxide limit for fossil fuel boilers is 350 mg/m³. The regulation is the original text of 2015 and later amendments were not checked.
Is a biomass boiler a renewable energy source?
Yes. Biomass is on the list of renewable energy sources in Slovak law (Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. a) and in Directive (EU) 2018/2001, Art. 2. The act defines a renewable energy source as a non-fossil source. Neither text calls biomass combustion free of carbon emissions. The directive applies its sustainability and greenhouse gas saving criteria to installations with a total rated thermal input of 20 MW or more. A boiler for a house is far below that threshold.
Does a biomass boiler need a building permit in Slovakia?
Not always. The Building Act version valid from 1 November 2025 to 31 December 2026 lists heat devices from renewable sources up to 50 kW. They need neither a decision on the building intent nor a notification (Zákon č. 25/2025 Z. z., § 18 ods. 5 písm. i). Replacement of technical building systems is also listed as maintenance work (§ 18 ods. 5 písm. a) bod 6).
Section 18 ods. 3 lists cases that need a notification, for example work in a heritage zone. The amendment Zákon č. 243/2026 Z. z. rewrites § 18 ods. 4 from 1 January 2027. It adds a notification for heat devices from renewable sources of 50 to 300 kW in a building alteration. Ask the building office before you start. Fire safety and the chimney need a check with the designer, because the acts cited here give no rule for them.
Does Zelená domácnostiam pay for a biomass boiler?
Only for boilers that burn pellets. The programme page lists "kotly na spaľovanie biomasy vo forme peliet", so a log or chip boiler is not eligible. As of 4 November 2026 the rate is 120 EUR/kW with a maximum contribution of 1 800 EUR. The 15 % increase does not apply to biomass boilers. The household must operate the device for at least 5 years. See Zelená domácnostiam.
The programme Zelená solidarita lists boilers for wood pellets, wood gasification and briquettes for low-income households. Its page says the amounts apply only to applications activated with income consent by 30 September 2026. Other applications fall under new conditions. Rates change by notice of SIEA, so read the current page.
How much space does fuel storage need?
The space depends on the fuel and on the heat demand of the house. SIEA says a pellet hopper usually holds about one week of fuel and a silo can hold a full year. It gives about 5 tonnes of pellets per season for a house of 150 m². SIEA also says that fuel transported over 60 km makes the investment almost unrecoverable. Keep the fuel dry and plan its storage with the designer in the permit design.
Can a biomass boiler heat a nearly zero-energy building?
The law sets conditions on the building and not on the boiler. A nearly zero-energy building has a very high energy performance. Its very low energy need must be covered to a high degree by energy from renewable sources located in or near the building (Zákon č. 555/2005 Z. z., § 2 ods. 10). The energy certificate states the share of such energy in per cent (§ 7 ods. 1 písm. k). The act does not say whether delivered fuel counts as such a share. Ask the energy certifier. See passive house, heat recovery ventilation, airtightness and heat source replacement.
Frequently asked questions
- What fuels can a biomass boiler burn?
- A biomass boiler burns woody biomass. Regulation (EU) 2015/1189 names log wood, chipped wood, pellets, briquettes and sawdust. The manufacturer names one preferred fuel for each boiler.
- How efficient is a biomass boiler?
- The EU minimum seasonal space heating energy efficiency is 75 % up to 20 kW and 77 % above 20 kW. SIEA gives more than 90 % for modern pellet boilers and more than 85 % for wood gasification boilers.
- Is a biomass boiler a renewable energy source?
- Yes. Biomass is a renewable energy source under Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. a) and under Directive (EU) 2018/2001. The sources do not call its combustion free of carbon emissions.
- Does a biomass boiler need a building permit?
- Not in every case. Heat devices from renewable sources up to 50 kW need neither a decision nor a notification until 31 December 2026 (§ 18 ods. 5 písm. i). The rules change on 1 January 2027, so ask your building office.
- Can I get a subsidy for a biomass boiler?
- Only for a pellet boiler in a family house under Zelená domácnostiam. As of 4 November 2026 the rate is 120 EUR/kW with a maximum of 1 800 EUR and no 15 % increase.
- What is the difference between a biomass boiler and a pellet boiler?
- A pellet boiler is a type of biomass boiler that burns only pellets. A biomass boiler may burn logs, briquettes or chipped wood as well.
Sources
- Commission Regulation (EU) 2015/1189 of 28 April 2015 implementing Directive 2009/125/EC with regard to ecodesign requirements for solid fuel boilers · Official Journal of the European Union · Art. 1, 2, 3, Annex II point 1
- Základné podmienky podpory pre rodinné domy, Zelená domácnostiam · Slovenská inovačná a energetická agentúra (SIEA)
- Základné podmienky podpory pre rodinné domy, Zelená solidarita · Slovenská inovačná a energetická agentúra (SIEA)
- Ako vybrať zdroj na biomasu · Slovenská inovačná a energetická agentúra (SIEA)
- Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 1 písm. a), d)
- Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources · Official Journal of the European Union · Art. 2, recital on 20 MW
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 18 ods. 3 a 5
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Slov-Lex · Art. I bod 62 (nový § 18 ods. 4)
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 10, § 7 ods. 1 písm. k)