Renewable Energy Source (RES)
A renewable energy source is a non-fossil source of energy, such as solar, wind, hydro, geothermal, ambient or biomass energy.
What is a renewable energy source?
A renewable energy source is a non-fossil source of energy. Slovak law lists the sources in Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. a). They are hydro, wind, solar, geothermal, osmotic and ambient energy, biomass, biogas, landfill gas, sewage treatment plant gas, and tidal, wave and other ocean energy. The Slovak term is obnoviteľný zdroj energie, short OZE. English texts use "RES" for renewable energy sources.
What does the EU definition say?
Directive (EU) 2018/2001 defines energy from renewable sources in Art. 2 as energy from renewable non-fossil sources. Its list is nearly the same as the Slovak list. It names wind, solar thermal and solar photovoltaic energy, geothermal energy and ambient energy. It also names tide, wave and other ocean energy, hydropower, biomass, landfill gas, sewage treatment plant gas and biogas. The list in the Slovak act also names osmotic energy, which the directive list does not name.
Both texts define the terms behind the list. Geothermal energy is energy stored as heat beneath the surface of solid earth. Ambient energy is thermal energy that occurs naturally in the environment, stored in ambient air (not exhaust air) or in surface or sewage water. Biomass is the biodegradable part of products, waste and residues of biological origin.
Which renewable energy sources can a house use?
A house can use solar, wind, ambient and biomass energy with small devices. Zelená domácnostiam supports five device types for family houses. The table links each type to the energy source of the Slovak list.
| Device | Energy source in the act | Rate as of 4 November 2026 |
|---|---|---|
| Photovoltaic panel | Solar energy | 500 EUR/kW, maximum 1 000 EUR |
| Wind turbine | Wind energy | 500 EUR/kW, maximum 1 000 EUR |
| Solar collector | Solar energy | 500 EUR/kW, maximum 2 000 EUR |
| Biomass boiler burning pellets (biomass boiler) | Biomass | 120 EUR/kW, maximum 1 800 EUR |
| Heat pump (air-to-air heat pump is one type) | Ambient or geothermal energy | 400 EUR/kW, maximum 4 000 EUR |
The rates are the base rates without the 15 % increase. The increase applies to emission-free devices or to households that stop using solid fuel, and the page gives none for biomass boilers.
What is a small renewable energy device under the programme?
The programme calls a device small if it produces electricity with an output up to 10.8 kW. A device that produces heat for a building used for housing is small up to 1 MW. The Slovak support act uses the same 10.8 kW limit for a "small source" of electricity (Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. l). The act also defines a "local source". It is a device that produces electricity for the connection point where it stands. Its installed output must not exceed the maximum reserved capacity of that point (§ 2 ods. 1 písm. o).
How does Zelená domácnostiam work for renewable energy sources?
Zelená domácnostiam is a programme run by the Slovak Innovation and Energy Agency (SIEA). It pays a contribution to the owner of a family house for a listed device. The device must be on the list of eligible devices by the date of the application for payment. The household must operate the device for at least 5 years from the start of the contract. SIEA published new general conditions on 21 September 2026. Registration of applications opened on 26 October 2026 and reservation requests on 2 November 2026. Rates change by notice of SIEA, so read the current page. See Zelená domácnostiam.
Does a renewable energy device need a building permit?
Not always. This is the Building Act version valid from 1 November 2025 to 31 December 2026. A device for electricity, heat or cold from renewable sources up to 100 kW is a minor building (Zákon č. 25/2025 Z. z., § 2 ods. 4 písm. i). Above 100 kW it is a simple building (§ 2 ods. 6 písm. k). A device up to 50 kW needs neither a decision on the building intent nor a notification (§ 18 ods. 5 písm. i).
Solar devices have a separate rule. Section 18 ods. 4 písm. b) requires a notification for some solar devices, among them devices of 50 to 100 kW. Section 18 ods. 3 also lists cases that need a notification, for example work on a heritage building. The amendment Zákon č. 243/2026 Z. z. rewrites § 18 ods. 4 from 1 January 2027. Ask the building office of your municipality for your case.
What are the EU targets for renewable energy?
The EU target for 2030 is a share of at least 42.5 % of renewable energy in the gross final energy consumption of the Union. Member States must reach it together. The target is not a duty for a single household or building.
| Directive | Union target for 2030 |
|---|---|
| (EU) 2018/2001, Art. 3(1) as adopted | At least 32 % |
| (EU) 2023/2413, Art. 1 point 2(a), replacing Art. 3(1) | At least 42.5 % |
How do renewable energy sources count for a nearly zero-energy building?
A nearly zero-energy building has a very high energy performance, and renewable energy covers its very low energy need to a high degree. The Slovak energy performance act requires this energy to be located in or near the building (Zákon č. 555/2005 Z. z., § 2 ods. 10). The energy certificate states the share of such energy in per cent (§ 7 ods. 1 písm. k). See nearly zero-energy building. Lower demand makes each device smaller. Heat recovery ventilation is one way to lower the demand.
Frequently asked questions
- What does RES or OZE mean?
- RES is the English short form of renewable energy source, and OZE is the Slovak short form of obnoviteľný zdroj energie. Both mean a non-fossil source of energy such as solar, wind, hydro, geothermal, ambient or biomass energy.
- Which energy sources does Slovak law count as renewable?
- Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. a) lists hydro, wind, solar, geothermal, osmotic and ambient energy, biomass, biogas, landfill gas, sewage treatment plant gas, and tidal, wave and other ocean energy.
- Which renewable energy devices does Zelená domácnostiam support?
- It supports photovoltaic panels, wind turbines, solar collectors, biomass boilers that burn pellets, and heat pumps in family houses. The list is from the SIEA page as served on 4 November 2026.
- Is a biomass boiler a renewable energy source?
- Yes, because biomass is on the list of renewable energy sources in Slovak law and in Directive (EU) 2018/2001. Zelená domácnostiam supports only biomass boilers that burn pellets.
- Does a small renewable energy device need a building permit?
- Not always. Devices for renewable heat or electricity up to 50 kW need neither a decision nor a notification, except cases listed in § 18 ods. 3 and 4 of Zákon č. 25/2025 Z. z. The rules change on 1 January 2027.
- What is the EU renewable energy target for 2030?
- At least 42.5 % of the gross final energy consumption of the Union must come from renewable sources (Directive (EU) 2023/2413, Art. 1 point 2(a)). The target applies to the Member States together.
Sources
- Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 1 písm. a), d), g), l), m), o)
- Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources · Official Journal of the European Union · Art. 2, Art. 3(1) as originally adopted
- Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001 · Official Journal of the European Union · Art. 1 point 2(a)
- Základné podmienky podpory pre rodinné domy, Zelená domácnostiam · Slovenská inovačná a energetická agentúra (SIEA)
- Harmonogram, Zelená domácnostiam · Slovenská inovačná a energetická agentúra (SIEA)
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 2 ods. 4 písm. i), § 2 ods. 6 písm. k), § 18 ods. 3, 4 a 5
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Slov-Lex · Art. I bod 62 (nový § 18 ods. 4)
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 10, § 7 ods. 1 písm. k)