Photovoltaic (PV) Panel

A photovoltaic panel is a flat module of solar cells that converts sunlight into direct current electricity for use in a building.

What is a photovoltaic panel?

A photovoltaic (PV) panel is a flat module of solar cells that converts sunlight into direct current (DC) electricity.

The cells sit behind glass in a frame. An inverter converts the DC output to the alternating current (AC) that household circuits use. A panel has no moving parts.

Most panels on the market use silicon cells. The next section gives the technology split.

Which types of photovoltaic panel are sold today?

Crystalline silicon panels dominate. In 2025, wafer-based silicon technology made about 98 % of PV production, and 86 % of the wafers were n-type.

The Fraunhofer Institute for Solar Energy Systems ISE reports that monocrystalline n-type TOPCon technology has become dominant. It also reports that multi-crystalline silicon has in practice disappeared from the market. Thin-film technology holds a market share of 2 to 3 %.

Older price lists and articles still show polycrystalline panels. Ask the installer which cell technology the offered panel uses.

How efficient is a photovoltaic panel?

Efficiency is the share of incident sunlight that a panel converts into electricity. The shipment-weighted average of crystalline silicon modules was 22.7 % in the fourth quarter of 2024.

Within that group, the lowest module efficiency was 18.9 % and the highest was 24.8 %. Fraunhofer ISE reports that commercial monocrystalline modules rose from about 17 % to just under 25 % over the past decade.

Cadmium telluride (CdTe) thin-film modules reached almost 20 %. Laboratory records are higher, for example 35.2 % for perovskite-silicon tandem cells. Laboratory records are not products you can buy.

A higher efficiency means fewer square metres of panel for the same power. It does not change the price per kilowatt-hour of the electricity the array makes.

How much electricity does a photovoltaic panel make in Slovakia?

The EU Joint Research Centre tool PVGIS models about 1,000 to 1,200 kWh per year for each kWp, depending on site and mounting.

The table gives PVGIS model output, not a measured yield. Assumptions: crystalline silicon, 1 kWp, 14 % system losses, PVGIS-SARAH3 data for 2005 to 2023, 35° tilt facing south, roof-integrated mounting model.

SiteLatitude, longitudeModel output (kWh per kWp per year)
Bratislava48.15, 17.11about 1,160
Košice48.72, 21.26about 1,120
Žilina49.22, 18.74about 1,040

For Bratislava, the same array with a free-standing mounting model gives about 1,205 kWh per kWp. The roof-integrated setting gives a lower value.

Your roof, shading and panel type change the result. Run PVGIS for your own address before you size a system.

Does roof orientation matter?

Yes. In the Bratislava model, a 35° east-facing or west-facing array produces about 940 to 950 kWh per kWp. That is about 21 % less than the same array facing south.

Bratislava, 1 kWp, free-standing modelModel output (kWh per year)
35° tilt, facing southabout 1,205
10° tilt, facing southabout 1,100
35° tilt, facing eastabout 950
35° tilt, facing westabout 940

The model also shows the seasonal gap. For a 35° south-facing array in Bratislava, December to February give about 13 % of the annual output.

Read building orientation for how roof direction affects the design of the whole house.

How long does a photovoltaic panel last?

No Slovak or EU source gives one lifespan for all panels, so the manufacturer warranty and datasheet are the figures to compare.

Output falls slowly with age. A review of nearly 2,000 published field measurements found a median degradation rate of 0.5 % per year. Individual modules and systems vary.

Fraunhofer ISE uses 25 years of life and 0.70 % degradation per year as assumptions in its energy payback calculation. These are model inputs, not a warranty or a measurement.

Fraunhofer ISE reports an energy payback time of about 1.1 years for systems made in Europe and installed in Northern Europe. The panel makes back the energy used to build it in that time.

Does a photovoltaic installation on a house need a permit in Slovakia?

It depends, and the Building Act (zákon č. 25/2025 Z. z.) gives two rules that overlap for a small rooftop array. Ask the building office before you start.

Rule 1: a renewable-energy device up to 50 kW needs no building-intent decision and no notification (§ 18 ods. 5 písm. i).

Rule 2: § 18 ods. 4 písm. b) requires a notification (ohlásenie) to the building office for solar devices and co-located energy storage. This includes devices integrated into a building. The item sets no lower power limit. It also names solar devices from 50 kW up to 100 kW.

For an array below 50 kW, both rules can apply. The act does not say which prevails.

The act defines a device up to 100 kW as a minor structure (drobná stavba, § 2 ods. 4 písm. i). A device above 100 kW is a simple structure (jednoduchá stavba, § 2 ods. 6 písm. k).

Other minor works need a notification in some cases. Examples are a heritage zone or a place within 2 m of the plot boundary (§ 18 ods. 3).

The version above applies until 31 December 2026. From 1 January 2027, Act 243/2026 replaces § 18 ods. 4. A renewable electricity device from 50 kW up to 300 kW then needs notification if it is a building alteration (stavebná úprava). A device from 50 kW up to 100 kW needs notification if it is not.

A module that replaces a roof or façade element is a different case. Read building-integrated photovoltaics.

How is a photovoltaic system connected to the grid?

The owner signs a connection contract with the system operator (Act 251/2012, § 27 ods. 2 písm. a). The producer may connect if the device meets the technical and commercial connection conditions (§ 27 ods. 1 písm. a).

A producer may use the electricity from its own device for its own consumption (§ 27 ods. 1 písm. c).

Generation in a device up to 11 kW is not business in energy. The owner must not claim support by a top-up payment (doplatok) (§ 4 ods. 4). The duty to notify the office (úrad) within 30 days does not apply to generation up to 11 kW (§ 4 ods. 9).

A household customer that consumes or stores electricity from its own generating device is always an active customer (aktívny odberateľ, § 4 ods. 6). See net metering, self-consumption and feed-in surplus for what happens to the electricity.

Does Zelená domácnostiam pay for photovoltaic panels?

Yes. As of November 2026, the programme pays 500 € per kW of installed power for photovoltaic panels, up to 1,000 € per household. The cap applies from 2 kW.

A 15 % bonus raises the rate to 575 € per kW and the cap to 1,150 €. It applies to households that install zero-emission devices for air-quality management or stop using solid fuels.

The programme supports a small electricity device up to 10.8 kW on a family house. The household must operate the device for at least 5 years from the start of the contract. Rates changed in 2026, so check the current page of the Slovak Innovation and Energy Agency (SIEA) before you plan.

Must a new house have solar panels?

Not yet. Directive (EU) 2024/1275 requires suitable solar installations on all new residential buildings by 31 December 2029 (Article 10(3)(d)). The installation must be technically suitable and economically and functionally feasible.

The Slovak transposition, Act 246/2026, applies from 1 January 2027. It sets the duty for a new residential building from 1 January 2030 (§ 8d ods. 1 písm. e) of Act 555/2005). It also applies the condition of technical, functional and economic feasibility.

The duty does not apply if it would harm structural integrity or flat-roof thermal protection. It also does not apply if it would harm pitched-roof or green-roof solutions (§ 8d ods. 2).

Directive (EU) 2024/1275 Article 10(1) also asks Member States to design all new buildings to optimise solar generation potential. Plan the roof shape, load and free area at design stage. Read EPBD directive and home battery storage for related topics.

Frequently asked questions

How efficient is a photovoltaic panel?
The shipment-weighted average of crystalline silicon modules was 22.7 % in the fourth quarter of 2024. The range in that group was 18.9 % to 24.8 % (Fraunhofer ISE, 2026).
How many kWh does 1 kWp make in Slovakia?
PVGIS models about 1,040 to 1,160 kWh per year for 1 kWp at 35° facing south in Žilina, Košice and Bratislava. This is a model output with 14 % system losses, not a measured yield.
Do solar panels degrade?
Yes. A review of nearly 2,000 published field measurements found a median degradation rate of 0.5 % per year. The rate varies between modules and systems.
Do I need a permit for panels on my roof?
It depends. Act 25/2025 § 18 ods. 5 písm. i) exempts devices up to 50 kW, but § 18 ods. 4 písm. b) requires a notification for solar devices and does not say which rule prevails. Ask the building office.
How much does Zelená domácnostiam pay for panels?
As of November 2026, it pays 500 € per kW up to 1,000 €. With the 15 % bonus it pays 575 € per kW up to 1,150 €. Check the SIEA page for the current rate.
Must new houses have solar panels in Slovakia?
From 1 January 2030 for a new residential building, if feasible (Act 555/2005 § 8d, in force from 1 January 2027). Feasible means technically, functionally and economically.

Sources

  1. Photovoltaics Report, Freiburg, 14 July 2026 · Fraunhofer Institute for Solar Energy Systems ISE
  2. PVGIS photovoltaic geographical information system, PVcalc tool (API v5.3), run 2026-11-04 · European Commission, Joint Research Centre
  3. Photovoltaic Degradation Rates: An Analytical Review (Jordan and Kurtz), Progress in Photovoltaics 2013, doi 10.1002/pip.1182 · National Renewable Energy Laboratory (via OSTI)
  4. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon), version in force 01.11.2025 to 31.12.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 2 ods. 4 písm. i), § 2 ods. 6 písm. k), § 18 ods. 3, ods. 4 písm. b), ods. 5 písm. i)
  5. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (Art. I applies from 1 January 2027) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. I bod 62 (new § 18 ods. 4)
  6. Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov, version from 01.07.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 4 ods. 4, 6 a 9, § 27 ods. 1 písm. a) a c), ods. 2 písm. a)
  7. Zelená domácnostiam: Podmienky pre rodinné domy (page as served 2026-11-04) · Slovenská inovačná a energetická agentúra (SIEA)
  8. Directive (EU) 2024/1275 of the European Parliament and of the Council on the energy performance of buildings (recast) · European Parliament and Council (EU Publications Office) · Article 10
  9. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (promulgated 8 October 2026, in force 1 January 2027) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. I, new § 4 ods. 2, § 8 ods. 10, § 8d