Building-Integrated Photovoltaics (BIPV)
A building-integrated photovoltaic module is a solar module that forms part of the building envelope, such as a roof covering or a façade cladding.
What is building-integrated photovoltaics?
A building-integrated photovoltaic (BIPV) module is a photovoltaic module that forms part of the building envelope, for example a roof covering or a façade cladding.
A standard photovoltaic panel sits on top of a finished roof. A BIPV module takes the place of a roof or façade element, so it must also do that element's job.
Fraunhofer ISE lists building-integrated systems on roofs and façades as one of the installation types next to ground-mounted systems, agrivoltaics and floating PV.
How much electricity does a BIPV roof or façade make in Slovakia?
A south-facing roof at 35° makes about 1,160 kWh per kWp per year in Bratislava, in the PVGIS model with a building-integrated mounting. A south façade makes about 815 kWh per kWp.
The table gives PVGIS model output of the EU Joint Research Centre, not measured yields. Assumptions: Bratislava (48.15, 17.11), crystalline silicon, 1 kWp, 14 % system losses, PVGIS-SARAH3 irradiation data for 2005 to 2023, building-integrated mounting model.
| Surface | Model output (kWh per kWp per year) | Share made in December to February |
|---|---|---|
| Roof, 35° tilt, facing south | about 1,160 | about 13 % |
| Roof, 35° tilt, facing east | about 920 | about 9 % |
| Façade, vertical, facing south | about 815 | about 19 % |
| Façade, vertical, facing east | about 570 | about 10 % |
| Façade, vertical, facing north | about 190 | about 9 % |
A south façade makes less per year than a south roof but a larger share of its output in winter. A north façade makes about one sixth of the south roof value in this model.
For the same Bratislava site, a free-standing mounting model gives about 1,205 kWh per kWp for the south roof. PVGIS therefore models a lower yield for the building-integrated setting.
Read building orientation and self-consumption before you choose which surfaces to cover.
Does a BIPV installation need a building permit in Slovakia?
Possibly a notification. The Building Act (zákon č. 25/2025 Z. z.) lists solar devices integrated into a building among works that need a notification (ohlásenie). The building office receives it (§ 18 ods. 4 písm. b).
The same item lists solar devices from 50 kW up to 100 kW. The wording of the item is not fully clear. It also names the co-location of energy storage with solar devices.
The act also says that a renewable-energy device up to 50 kW needs no building-intent decision and no notification (§ 18 ods. 5 písm. i). The act does not say which of the two rules prevails for an integrated device.
Ask the building office before you design. A BIPV roof or façade also changes the building's appearance and its envelope. That can bring other rules, for example for a heritage zone (§ 18 ods. 3).
Which Slovak rule applies by device size?
| Device (renewable electricity, total installed power) | Rule in Act 25/2025 (version to 31 December 2026) |
|---|---|
| Up to 50 kW | No decision and no notification (§ 18 ods. 5 písm. i) |
| 50 kW up to 100 kW, solar | Notification (§ 18 ods. 4 písm. b) |
| Up to 100 kW | Minor structure (§ 2 ods. 4 písm. i) |
| Above 100 kW | Simple structure (§ 2 ods. 6 písm. k) |
The version above applies until 31 December 2026. From 1 January 2027, Act 243/2026 replaces § 18 ods. 4. The new text lists renewable electricity devices from 50 kW up to 300 kW for a building alteration (stavebná úprava). It lists devices from 50 kW up to 100 kW otherwise. It does not repeat the wording on integrated devices.
Is a BIPV module a construction product?
Yes, if the maker places it on the market for permanent incorporation into construction works. That is the definition of a construction product in Regulation (EU) 2024/3110, Article 3 point 2.
Recital 32 names photovoltaic products as an example for which ecodesign Regulation (EU) 2024/1781 has priority. It excludes building-integrated photovoltaic panels. A recital explains the intent. It is not an operative rule.
The Regulation applies from 8 January 2026, with the exceptions listed in its last articles. Ask the supplier for the declaration of performance and the technical specification for the module as a building element.
Does the EU require solar installations on new buildings?
Yes, with conditions. Directive (EU) 2024/1275 requires suitable solar installations on all new residential buildings by 31 December 2029 (Article 10(3)(d)). The installation must be technically suitable and economically and functionally feasible.
The Slovak transposition, Act 246/2026, applies from 1 January 2027. It sets the duty for a new residential building from 1 January 2030 (§ 8d ods. 1 písm. e) of Act 555/2005). The same feasibility condition applies.
The duty does not apply if it would harm structural integrity or flat-roof thermal protection. It also does not apply if it would harm pitched-roof or green-roof solutions (§ 8d ods. 2).
Directive (EU) 2024/1275 does not require BIPV in particular. A building-integrated module is one way to meet a solar duty if it is suitable.
Does Zelená domácnostiam pay for BIPV?
The programme conditions list photovoltaic panels as supported devices. They do not name building-integrated modules. Ask SIEA whether a BIPV module counts before you buy.
As of November 2026, the rate for photovoltaic panels is 500 € per kW up to 1,000 € per household. With the 15 % bonus it is 575 € per kW up to 1,150 €. The device may have up to 10.8 kW.
How is a BIPV system connected to the grid?
The rules are the same as for a standard PV system. The owner signs a connection contract with the system operator (Act 251/2012, § 27 ods. 2 písm. a).
Generation in a device up to 11 kW is not business in energy. The owner must not claim support by a top-up payment (§ 4 ods. 4). See net metering and home battery storage for the use of the electricity.
Frequently asked questions
- What is the difference between BIPV and rooftop solar panels?
- A BIPV module replaces a roof or façade element and must do that element's job. A rooftop panel sits on top of a finished roof.
- How much does a BIPV façade make in Slovakia?
- In the PVGIS model for Bratislava, a vertical south façade makes about 815 kWh per kWp per year. A south roof at 35° makes about 1,160 kWh per kWp. These are model outputs.
- Does BIPV work on an east or north surface?
- It makes less. In the same model, an east façade makes about 570 kWh per kWp and a north façade about 190 kWh per kWp per year.
- Does BIPV need a permit in Slovakia?
- Act 25/2025 § 18 ods. 4 písm. b) names solar devices integrated into a building among works that need a notification. Ask the building office, because the text does not clearly fit with § 18 ods. 5 písm. i).
- Is BIPV regulated as a construction product?
- A BIPV module is a construction product if the maker places it on the market for permanent incorporation into works. See Regulation (EU) 2024/3110, Article 3 point 2. Recital 32 treats it separately from other photovoltaic products.
- Must a new house have BIPV?
- No. Directive (EU) 2024/1275 asks for suitable solar installations on new residential buildings by 31 December 2029, if feasible. It does not name BIPV.
Sources
- PVGIS photovoltaic geographical information system, PVcalc tool (API v5.3), run 2026-11-04 · European Commission, Joint Research Centre
- Photovoltaics Report, Freiburg, 14 July 2026 · Fraunhofer Institute for Solar Energy Systems ISE
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon), version in force 01.11.2025 to 31.12.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 18 ods. 3, ods. 4 písm. b), ods. 5 písm. i)
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (Art. I applies from 1 January 2027) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. I bod 62 (new § 18 ods. 4)
- Regulation (EU) 2024/3110 of the European Parliament and of the Council laying down harmonised rules for the marketing of construction products (Construction Products Regulation) · European Parliament and Council (EU Publications Office) · Article 3 point 2, recital 32, final articles on date of application
- Directive (EU) 2024/1275 of the European Parliament and of the Council on the energy performance of buildings (recast) · European Parliament and Council (EU Publications Office) · Article 10
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (promulgated 8 October 2026, in force 1 January 2027) · Národná rada Slovenskej republiky (Slov-Lex) · Čl. I, new § 4 ods. 2, § 8 ods. 10, § 8d
- Zelená domácnostiam: Podmienky pre rodinné domy (page as served 2026-11-04) · Slovenská inovačná a energetická agentúra (SIEA)
- Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov, version from 01.07.2026 · Národná rada Slovenskej republiky (Slov-Lex) · § 4 ods. 4 a § 27 ods. 2 písm. a)