Zelená Domácnostiam (Green Households Programme)

Zelená domácnostiam is a SIEA subsidy programme that pays a rate per kW for small renewable energy devices in family houses.

What is Zelená domácnostiam?

Zelená domácnostiam (Green Households) is a national project of SIEA that pays households a contribution for small renewable energy devices in family houses. SIEA is the Slovak Innovation and Energy Agency (Slovenská inovačná a energetická agentúra). The current phase is Zelená domácnostiam II. The Programme Slovakia 2021 to 2027 finances it.

The indicative budget is 28.6 million €. Of this, 1.6 million € is for the Bratislava region and 27 million € for the other regions. SIEA pays contributions until it uses the budget, and at the latest until 31 December 2029 (general conditions, version 1, articles C and E).

What is the status of the programme in November 2026?

The programme restarted in autumn 2026. SIEA published the general conditions on 21 September 2026 and opened the registration of applications on 26 October 2026. Households can request a reservation of funds from 2 November 2026. The general conditions, version 1, are effective from 21 October 2026.

SIEA makes reservations step by step, in the order of requests. It resumes reservations when the reserved volume falls below 1 000 000 €. It reserves up to 2 000 000 € (article G, points 6 to 9). A place in the queue is not a reservation.

Which devices does the programme support?

The programme supports photovoltaic panels, wind turbines, solar collectors, pellet biomass boilers and heat pumps (article B). Heat pumps and pellet boilers are heat sources. See heat source replacement. The table shows the rates as of November 2026 for a family house.

DeviceRateOutput supportedMaximumRate with 15 % bonusMaximum with bonus
Photovoltaic panel500 €/kWup to 2 kW1 000 €575 €/kW1 150 €
Wind turbine500 €/kWup to 2 kW1 000 €575 €/kW1 150 €
Solar collector500 €/kWup to 4 kW2 000 €575 €/kW2 300 €
Pellet biomass boiler120 €/kWup to 15 kW1 800 €nonenone
Heat pump400 €/kWup to 10 kW4 000 €460 €/kW4 600 €

The contribution is at most 50 % of the eligible expenses. SIEA may update the rates at least once per calendar year (article I, points 2 and 6). A device may have a larger total output than the supported output.

Example: an 8 kW heat pump earns 3 200 € at the base rate and 3 680 € with the bonus. SIEA pays the lower of this amount and 50 % of the eligible expenses. See heat pump, photovoltaic panel, solar thermal collector and pellet boiler.

What is the 15 % bonus?

The bonus (zvýhodnenie) raises the base rate by 15 %. It applies when a household installs zero-emission devices in an air quality management area, or when it stops using solid fuels (article I, point 4). The conditions read for this page do not define "air quality management area". Ask SIEA or the installer whether your address counts.

A household that claims the bonus for stopping solid fuels must attach photos of the connected and the removed device. If SIEA suspects a wrong claim, it checks the conditions. If they are not met, it sets the contribution without the bonus (article G point 14 k, article I point 5).

Who can apply?

The owner of a family house, or of a flat in a family house, can apply. Co-owners can apply if they may decide about the common property by the majority of their shares (article F).

  • The property must not belong to a legal person or sit in the business assets of any business entity.
  • A business or another entity with economic activity must not book more than 20 % of the energy costs of the house.
  • More than 20 % of the floor area must not be rented out or handed over for use to another party.
  • The household must run the device for at least 5 years from the effective date of the contract.

The family house counts as such if the land register lists it as one. Another building, such as a recreation house, counts if the applicant has permanent residence there. A household may apply once for each device type per property. A device type that another public programme already funded at the same place does not qualify (article H, points 6 and 12).

How does an application work?

SIEA describes ten steps on its page "Ako na to v Zelenej domácnostiam". The main steps follow.

  1. Choose the device and agree on the installation with a supplier.
  2. Register the application for a financial contribution on zelenadomacnostiam.sk.
  3. Request a reservation of funds. The application joins the queue.
  4. SIEA sends a reservation notice when funds are free for your application.
  5. Within 45 days of the reservation, submit the documents on the installation and the payment. A household that already sent a complete application before the reservation does not need to repeat it (article G, point 8).
  6. SIEA assesses the application within 60 working days and, if the conditions are met, sends a contract for signature (article H, points 2 and 7).
  7. SIEA pays the contribution to the household bank account after it receives the signed contract.

The device must be installed and put into operation after 1 January 2024, and the expenses must arise after that date (article C, point 3). The device model must be on the SIEA list of eligible devices.

The programme page still contains the phrase "žiadosť o preplatenie poukážky" (request to reimburse a voucher). The general conditions of October 2026 use the word contribution (príspevok) and the steps above. This page therefore does not describe a voucher process.

What do the devices have to meet?

A heat pump with water heating must be in the EPREL database. It must reach seasonal energy efficiency class A++ or higher at 35 °C in average climate. The manufacturer must state in writing a life of at least 10 years. An air-to-air heat pump must reach class A+ or higher in heating mode (annex 1, point 5).

A pellet boiler must reach energy efficiency class A+ or higher in EPREL. It must replace a solid fossil fuel appliance (article H, point 12 d).

How does Zelená domácnostiam differ from Zelená solidarita?

Zelená solidarita (Green Solidarity) is the sister programme for low-income households at risk of energy poverty. SIEA runs both. See energy poverty. The Zelená solidarita page states that support can reach 90 % of the eligible expenses.

  • Zelená solidarita supports photovoltaic panels, solar collectors and boilers on wood pellets, gasified wood and briquettes. The page does not list heat pumps or wind turbines.
  • Eligibility depends on income. The limit follows 70 % of the median equivalised disposable income. For a household with a person with a severe disability the limit follows 100 % of the median.
  • The page says its current conditions apply only to applications with income consent delivered by 30 September 2026. Other applications fall under new conditions.

The page also lists "pripravované" (upcoming) rates. Check the page for the status of the new conditions before you plan.

DeviceCurrent rate and maximumUpcoming rate and maximum
Photovoltaic panel900 €/kW, 6 300 €900 €/kW, 1 800 €
Solar collector900 €/kW, 3 600 €900 €/kW, 3 600 €
Biomass boiler180 €/kW, 2 700 €216 €/kW, 3 240 €

The table shows the Zelená solidarita page as of November 2026.

Frequently asked questions

What does Zelená domácnostiam support?
As of November 2026, it supports photovoltaic panels, wind turbines, solar collectors, pellet biomass boilers and heat pumps in family houses. The device model must be on the SIEA list of eligible devices.
How much money can a household get from Zelená domácnostiam?
A heat pump earns 400 €/kW up to 10 kW, so at most 4 000 € as of November 2026. A photovoltaic panel earns at most 1 000 €. The contribution never exceeds 50 % of the eligible expenses.
Who can apply for Zelená domácnostiam?
An owner of a family house or of a flat in a family house can apply. The property must not belong to a legal person or sit in business assets. A household may not rent out more than 20 % of the floor area.
How does the programme work in November 2026?
Registration opened on 26 October 2026 and reservation requests opened on 2 November 2026. SIEA reserves funds step by step. After the reservation you have 45 days to submit the installation and payment documents.
What is Zelená solidarita?
Zelená solidarita is the SIEA programme for low-income households at risk of energy poverty. The page states that it can cover up to 90 % of eligible expenses. It lists photovoltaic panels, solar collectors and biomass boilers.
What is the 15 % bonus in Zelená domácnostiam?
The bonus raises the base rate by 15 %. It applies to zero-emission devices in air quality management areas or when a household stops using solid fuels. SIEA checks the claim if it suspects misuse.

Sources

  1. Všeobecné podmienky národného projektu Zelená domácnostiam II., verzia 1, účinné od 21. októbra 2026 · SIEA (Slovenská inovačná a energetická agentúra) · čl. A až J, Príloha 1 Technické podmienky
  2. Podmienky pre rodinné domy, Zelená domácnostiam · SIEA (zelenadomacnostiam.sk)
  3. Harmonogram projektu Zelená domácnostiam · SIEA (zelenadomacnostiam.sk)
  4. Ako na to v Zelenej domácnostiam · SIEA (zelenadomacnostiam.sk)
  5. Podmienky pre rodinné domy, Zelená solidarita · SIEA (zelenadomacnostiam.sk)