Pellet Boiler
A pellet boiler is a solid fuel boiler that burns compressed wood pellets to heat water for a central heating system.
What is a pellet boiler?
A pellet boiler is a solid fuel boiler that burns compressed wood pellets to heat the water of a central heating system. Regulation (EU) 2015/1189 defines a solid fuel boiler as a device that provides heat to a water-based central heating system. The regulation lists pellets as one form of woody biomass, next to log wood, chipped wood, briquettes and sawdust. In Slovak the term is peletový kotol. The wider group is the biomass boiler.
What is the difference between a pellet boiler and a biomass boiler?
A pellet boiler is one type of biomass boiler, and it burns only pellets. A biomass boiler can also burn log wood, briquettes or wood chips. Slovak law defines biomass as the biodegradable part of products, waste and residues of biological origin from agriculture, forestry and related industries. The act is Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. d). The difference matters for subsidies, because Zelená domácnostiam supports only biomass boilers that burn pellets.
What fuel does a pellet boiler burn?
A pellet boiler burns wood pellets. The Slovak Innovation and Energy Agency (SIEA) describes them as round granules 6 to 8 mm in diameter and 10 to 30 mm long. SIEA gives a moisture content of 8 to 10 %. The same SIEA publication says a hopper usually holds about one week of fuel. A silo can hold a full year. It also says a house of 150 m² uses about 5 tonnes of pellets per season. The publication has no date, so treat that figure as an order of magnitude and not as a design value.
SIEA warns that fuel transported over 60 km makes the investment in the boiler almost unrecoverable. Ask local suppliers about delivery before you choose the boiler.
How efficient is a pellet boiler?
A pellet boiler sold in the EU must reach a minimum seasonal space heating energy efficiency. The minimum is 75 % up to 20 kW and 77 % above 20 kW. It applies to solid fuel boilers of 500 kW or less since 1 January 2020 (Regulation (EU) 2015/1189, Annex II point 1). Real boilers can do better. SIEA states that modern wood pellet boilers have an efficiency above 90 %, while older grate boilers reach 65 to 70 % in practice.
| Rated heat output | Minimum seasonal space heating energy efficiency |
|---|---|
| 20 kW or less | 75 % |
| More than 20 kW | 77 % |
Seasonal efficiency is not the same as the efficiency at full load. For automatically stoked boilers the regulation uses a weighted average. It combines the value at rated heat output and the value at 30 % of rated heat output.
What emission limits apply to a pellet boiler?
Regulation (EU) 2015/1189 sets four emission limits for solid fuel boilers placed on the market from 1 January 2020. The limits are in mg/m³. Annex III of the regulation gives the test method. The boiler must meet the limits with its preferred fuel and with any other suitable fuel.
| Pollutant | Automatically stoked boiler | Manually stoked boiler |
|---|---|---|
| Particulate matter | 40 | 60 |
| Organic gaseous compounds | 20 | 30 |
| Carbon monoxide | 500 | 700 |
| Nitrogen oxides, as nitrogen dioxide | 200 for biomass boilers | 200 for biomass boilers |
The regulation states these values for the product. It does not state what a boiler emits in your house. Poor fuel, poor adjustment and poor maintenance can raise the real emissions.
Is a pellet boiler a renewable energy source?
Yes. Slovak law lists biomass among renewable energy sources, and a renewable energy source is a non-fossil source of energy (Zákon č. 309/2009 Z. z., § 2 ods. 1 písm. a). Directive (EU) 2018/2001 uses the same list. The directive adds sustainability and greenhouse gas saving criteria for biomass fuels. It applies them to installations with a total rated thermal input of 20 MW or more, so a house boiler is far below that limit. A pellet boiler is renewable by definition, but the sources do not call it free of carbon emissions.
Does a pellet boiler need a building permit in Slovakia?
The Building Act version valid from 1 November 2025 to 31 December 2026 lists heat devices from renewable sources up to 50 kW. They need neither a decision on the building intent nor a notification (Zákon č. 25/2025 Z. z., § 18 ods. 5 písm. i). Replacement of technical building systems is also listed there as maintenance work (§ 18 ods. 5 písm. a) bod 6). A larger device is a minor building up to 100 kW (§ 2 ods. 4 písm. i) and a simple building above 100 kW (§ 2 ods. 6 písm. k).
Two points limit this answer. Section 18 ods. 3 lists cases that need a notification, for example work in a heritage zone. The amendment Zákon č. 243/2026 Z. z. rewrites § 18 ods. 4 from 1 January 2027 and adds a notification for heat devices from renewable sources of 50 to 300 kW in a building alteration. Ask the building office of your municipality before you start. The act does not give a rule on the chimney of a new boiler, so the chimney needs a separate check with the designer.
Does Zelená domácnostiam pay for a pellet boiler?
Yes, for a family house. The programme supports "kotly na spaľovanie biomasy vo forme peliet", so a log or chip boiler is not eligible. SIEA runs the programme. As of 4 November 2026 the SIEA page lists 120 EUR/kW for a biomass boiler. The maximum contribution is 1 800 EUR. The 15 % increase for emission-free devices or for households that stop using solid fuel does not apply to biomass boilers. The household must operate the device for at least 5 years from the start of the contract. Rates changed in September 2026, so read the current page before you plan. See Zelená domácnostiam.
The related programme Zelená solidarita lists "kotly na drevné pelety, splyňovanie dreva a brikiet" for low-income households. Its page says the amounts shown apply only to applications already activated, with income consent delivered by 30 September 2026. Other applications fall under new conditions.
What does a pellet boiler change in the energy certificate of a building?
A pellet boiler is a technical building system. The Slovak energy performance act defines it as equipment for heating, cooling, ventilation, hot water, lighting or on-site electricity. This includes systems that use renewable energy (Zákon č. 555/2005 Z. z., § 2). The energy certificate states the share of energy from renewable sources located in or near the building (§ 7 ods. 1 písm. k). The act does not say whether delivered fuel counts as such a share. Ask the certifier. For the wider rules see nearly zero-energy building, heat source replacement and hybrid heat pump. A pellet boiler is one option for heat from renewable sources. An air-to-air heat pump is another.
Frequently asked questions
- What is the difference between a pellet boiler and a biomass boiler?
- A pellet boiler is a type of biomass boiler that burns only pellets. A biomass boiler can also burn log wood, briquettes or chipped wood. Zelená domácnostiam supports only the pellet type.
- How efficient must a pellet boiler be?
- The seasonal space heating energy efficiency must be at least 75 % up to 20 kW and at least 77 % above 20 kW. This applies to solid fuel boilers of 500 kW or less since 1 January 2020 (Regulation (EU) 2015/1189, Annex II).
- How much dust may a pellet boiler emit?
- An automatically stoked boiler may emit at most 40 mg/m³ of particulate matter, and a manually stoked boiler at most 60 mg/m³. The limit applies to boilers placed on the EU market from 1 January 2020 (Regulation (EU) 2015/1189, Annex II).
- Does a pellet boiler need a building permit?
- Not in every case. Heat devices from renewable sources up to 50 kW need neither a decision nor a notification (§ 18 ods. 5 písm. i). This is the version valid until 31 December 2026. The rules change on 1 January 2027, so ask your building office.
- Can I get a subsidy for a pellet boiler?
- Yes, for a family house under Zelená domácnostiam. As of 4 November 2026 the rate is 120 EUR/kW with a maximum of 1 800 EUR. The SIEA page gives biomass boilers no 15 % increase.
- How much space does the pellet fuel need?
- SIEA says a hopper is usually sized for about one week of fuel, and a silo can hold a full year. The same publication gives about 5 tonnes of pellets per season for a 150 m² house, but it has no date.
Sources
- Commission Regulation (EU) 2015/1189 of 28 April 2015 implementing Directive 2009/125/EC with regard to ecodesign requirements for solid fuel boilers · Official Journal of the European Union · Art. 1, 2, 3, Annex II point 1
- Základné podmienky podpory pre rodinné domy, Zelená domácnostiam · Slovenská inovačná a energetická agentúra (SIEA)
- Základné podmienky podpory pre rodinné domy, Zelená solidarita · Slovenská inovačná a energetická agentúra (SIEA)
- Ako vybrať zdroj na biomasu · Slovenská inovačná a energetická agentúra (SIEA)
- Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 1 písm. a), d)
- Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources · Official Journal of the European Union · Art. 2, recital on 20 MW
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 2 ods. 4 písm. i), § 2 ods. 6 písm. k), § 18 ods. 3 a 5
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Slov-Lex · Art. I bod 62 (nový § 18 ods. 4)
- Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2, § 7 ods. 1 písm. k)