Hybrid Heat Pump
A hybrid heat pump is a heat pump paired with a boiler on one water-based heating system. The boiler covers demand the heat pump cannot.
What is a hybrid heat pump?
A hybrid heat pump is a heat pump that works together with a fuel boiler to heat one water-based heating system. The EU ecodesign regulation does not use the word "hybrid". It says a heat pump space heater may have one or more supplementary heaters. These burn fossil or biomass fuels or use electric resistance elements (Regulation (EU) No 813/2013, Article 2, point 17).
A supplementary heater is a non-preferential heater. It generates heat when demand is greater than the rated heat output of the preferential heater (Article 2, point 19).
The regulation defines a space heater as a device that heats a water-based central heating system (Article 2, point 2). A hybrid with a boiler therefore heats radiators or floor heating through water. Read heat pump and air-to-water heat pump for the heat pump side. Read condensing boiler for a common boiler side.
At what outdoor temperature does a hybrid heat pump switch to the boiler?
The installer sets the switching point for each system, and no rule fixes it. The ecodesign regulation defines two related values that the manufacturer declares for a heat pump.
- The bivalent temperature is the outdoor temperature at which the declared heating capacity equals the part load. Below it, the heater needs supplementary capacity (Article 2, point 39).
- The operation limit temperature is the outdoor temperature below which an air-to-water heat pump delivers no heating capacity (Article 2, point 40).
For test and labelling, the regulation sets reference design conditions for average climate (Annex III, Table 4).
| Reference value | Average climate |
|---|---|
| Reference design temperature | -10 °C |
| Bivalent temperature | at most +2 °C |
| Operation limit temperature | at most -7 °C |
These values compare products. They are not the settings for your house. Ask the installer which bivalent temperature the system uses and why.
How does ecodesign regulate the efficiency of a heat pump in a hybrid?
Regulation 813/2013 sets a minimum seasonal space heating energy efficiency (ηs). It applies to heaters with a rated heat output up to 400 kW (Article 1, Annex II). The efficiency ηs is the space heating demand of a heating season divided by the annual energy consumption that meets it (Article 2, point 20). Measurement and calculation include the supplementary heater (Annex III).
| Heater type | Minimum ηs from 26 September 2015 | Minimum ηs from 26 September 2017 |
|---|---|---|
| Heat pump space heater, not low-temperature | 100 % | 110 % |
| Low-temperature heat pump | 115 % | 125 % |
Manufacturers design a low-temperature heat pump for low-temperature application. In the reference design conditions it cannot deliver 52 °C outlet water at -7 °C outdoors (Article 2, point 52).
The seasonal coefficient of performance (SCOP) is the reference annual heating demand divided by the annual energy consumption (Article 2, point 28). See heat pump SCOP. This page uses the original 2013 text of the regulation. A later amendment was not checked.
Can a hybrid heat pump get a subsidy in Slovakia?
The Zelená domácnostiam programme does not name hybrid systems. Its general conditions list heat pumps and pellet biomass boilers among the supported devices. The device type must be on the list of eligible devices that SIEA (Slovak Innovation and Energy Agency) keeps.
As of November 2026, the heat pump rate is 400 €/kW. SIEA supports at most 10 kW of output, so the maximum contribution is 4 000 €. With the 15 % bonus the rate is 460 €/kW and the maximum is 4 600 €.
A water-based heat pump must be registered in the EPREL database. It must reach seasonal energy efficiency class A++ or higher at 35 °C in average climate. Check the SIEA device list for the exact model. See Zelená domácnostiam.
What does EU law say about subsidies for hybrid heating?
From 1 January 2025, Member States shall not provide financial incentives for the installation of stand-alone boilers powered by fossil fuels. The directive excepts projects selected before 2025 under named EU funds (Directive (EU) 2024/1275, Article 17, paragraph 15).
Recital 14 adds that incentives for hybrid heating systems with a considerable share of renewable energy remain possible. Examples are a boiler combined with solar thermal or with a heat pump.
Article 13, paragraph 8 says the Commission shall issue guidance on what qualifies as a fossil fuel boiler. The directive text does not say where a hybrid ends and a stand-alone boiler begins.
What decides if a hybrid heat pump is worth installing?
The result depends on four things. They are the heat demand of the building, the water temperature of the heat emitters, the existing boiler, and local energy prices.
The regulation shows why the heat pump share changes over a season. A heat pump declares a coefficient of performance at specified outdoor temperature bins. Its capacity reaches zero at the operation limit temperature (Article 2, points 38 and 40). The EPREL data sheet of a model shows its declared values.
A payback figure needs these values and current tariffs, so this page gives none. Ask the installer for a calculation with your own consumption.
Does a hybrid heat pump differ from a heat pump with an electric heater?
Yes, in the fuel of the supplementary heater. Regulation 813/2013 allows both. The supplementary heater may use the Joule effect in electric resistance elements, or it may burn fossil or biomass fuels (Article 2, point 17). A hybrid in the sense of this page uses a fuel boiler as the second source.
The permit position for fitting such a system in an existing house is in heat source replacement.
Frequently asked questions
- What is a hybrid heat pump?
- A hybrid heat pump is a heat pump that works together with a fuel boiler on one water-based heating system. The EU ecodesign regulation 813/2013 lets a heat pump space heater have a supplementary heater. That heater may burn fossil or biomass fuels.
- At what temperature does a hybrid heat pump switch to its backup boiler?
- The installer sets the switching point per system and no rule fixes it. The regulation defines a bivalent temperature that the manufacturer declares. Its reference value for the label test is at most +2 °C in average climate.
- Is a hybrid heat pump eligible for Zelená domácnostiam?
- The programme conditions name heat pumps and pellet boilers. They do not name hybrid systems. As of November 2026 the device type must be on the SIEA list of eligible devices. Check the model there before you buy.
- Does the EU ban fossil boilers in hybrid systems?
- The text read for this page contains no ban. Directive 2024/1275 bans only financial incentives for stand-alone fossil boilers from 1 January 2025. Its recital 14 says incentives for hybrid systems with a considerable renewable share remain possible.
- What minimum efficiency must a heat pump reach under ecodesign rules?
- A heat pump space heater, not low-temperature, must reach a seasonal space heating energy efficiency of at least 110 % from 26 September 2017. A low-temperature heat pump must reach at least 125 %. The source is Regulation 813/2013, Annex II.
- Is a hybrid heat pump cheaper to run than a gas boiler alone?
- It depends on your heat demand, your emitter temperature and current electricity and gas prices. No official source supports a general payback figure, so this page gives none. Ask the installer for a calculation with your consumption.
Sources
- Commission Regulation (EU) No 813/2013 of 2 August 2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · Official Journal of the European Union · Art. 1, Art. 2 points 2, 17, 19, 20, 28, 38 to 40, 52, Annex II point 1, Annex III Table 4
- Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · Official Journal of the European Union · Art. 13 par. 8, Art. 17 par. 15, recital 14
- Všeobecné podmienky národného projektu Zelená domácnostiam II., verzia 1, účinné od 21. októbra 2026 · SIEA (Slovenská inovačná a energetická agentúra) · čl. B, čl. I bod 3 a 4, Príloha 1 Technické podmienky bod 5