Heat source replacement is the removal of a building's heat generator, such as a boiler, and the installation of a different one.

What is heat source replacement?

Heat source replacement (Slovak: výmena zdroja tepla) is the removal of the heat generator of a building and the installation of another one. A typical case is a gas boiler that a household replaces with a heat pump or a pellet boiler.

Slovak law calls the heating equipment of a building a technical building system. The Building Act defines it as the technical equipment of a building. The equipment covers heating, hot water, cooling, ventilation and interior lighting (Act 25/2025, § 11, paragraph 2, point e).

EU law sets a duty for the work itself. When someone installs a technical building system, the Member State shall ensure an assessment of the energy performance of the altered part. The result goes to the owner in documented form (Directive (EU) 2024/1275, Article 13, paragraph 6).

Does replacing a heat source need a building permit in Slovakia?

Often it needs neither a permit nor a notification, but the answer depends on the work. The rule is in the Building Act, which applies from 1 April 2025. It requires a building intent decision for every building work unless the act says otherwise (§ 18, paragraph 2). Paragraph 5 lists work that needs neither the decision nor a notification to the building office. The consolidated text read here is valid from 1 November 2025 to 31 December 2026.

WorkRule in Act 25/2025, § 18, paragraph 5
Repair and replacement of technical building systems and their componentsPoint a), item 6: no decision and no notification
Device for electricity, heat and cooling from renewable sources with a total installed output up to 50 kW inclusivePoint i): no decision and no notification

Paragraph 3 lists cases where notification is required. Examples are work on a cultural monument, work in a heritage zone, and work that may endanger health or significantly harm the environment. The text does not say how paragraph 3 interacts with paragraph 5 for a boiler swap. Ask the building office if one of these cases applies to your house.

Act 243/2026 amends § 18 from 1 January 2027. Its new paragraph 4, point b) requires a notification for a renewable heat or cooling device of 50 kW to 300 kW inclusive. This applies if the work is a building alteration. A family house heat pump is far below these limits.

This page did not check other rules that may apply, such as rules on gas equipment, chimneys or the air quality act (Act 146/2023). Ask the installer which apply.

Does EU law ban fossil fuel boilers?

The directive text read for this page sets no ban date for fossil fuel boilers in single homes. It sets goals for national plans and one rule on subsidies.

  • Member States shall strive to replace stand-alone fossil fuel boilers in existing buildings. They do this under national phase-out plans (Directive (EU) 2024/1275, Article 13, paragraph 7).
  • From 1 January 2025, Member States shall not give financial incentives for new stand-alone fossil fuel boilers, with named exceptions (Article 17, paragraph 15).
  • Member States may set requirements on the fuel of heat generators or on a minimum renewable share. These must not be an unjustified market barrier (Article 13, paragraph 1).
  • The template for national renovation plans mentions the aim of "a complete phasing out of fossil fuel boilers by 2040" (Annex II).

Member States had to transpose most articles by 29 May 2026 (Article 35, paragraph 1). The Slovak transposition is outside the sources read for this page, so no Slovak deadline for fossil boilers is stated here.

Which heat sources does Zelená domácnostiam support?

As of November 2026, the programme supports heat pumps and pellet biomass boilers for heat. It also supports photovoltaic panels, wind turbines and solar collectors. The rate for a heat pump is 400 €/kW. The programme supports at most 10 kW, so the maximum contribution is 4 000 € (4 600 € with the 15 % bonus). The rate for a pellet boiler is 120 €/kW with a limit of 15 kW, so the maximum is 1 800 €. The bonus does not apply to boilers in the programme table. The source is SIEA (Slovak Innovation and Energy Agency), general conditions version 1, effective from 21 October 2026.

DeviceRateOutput supportedMaximumMaximum with 15 % bonus
Heat pump400 €/kWup to 10 kW4 000 €4 600 €
Pellet biomass boiler120 €/kWup to 15 kW1 800 €none

The contribution is at most 50 % of the eligible expenses. See Zelená domácnostiam, heat pump and pellet boiler.

What conditions apply when you replace an old boiler with a subsidised device?

  • A pellet boiler must replace a solid fossil fuel appliance. The household proves it with photos of the connected and the removed appliance.
  • The 15 % bonus applies to zero-emission devices in air quality management areas, or when the household stops using solid fuels. A photo proves the removal.
  • SIEA rules that an application fails if an air-to-air heat pump goes into a building with a hydronic heating system.
  • A water-based heat pump must be in the EPREL database with class A++ or higher at 35 °C. The manufacturer must state in writing a life of at least 10 years.
  • The household must run the device for at least 5 years from the effective date of the contract.

The conditions do not define "air quality management area" in the text read here. Ask SIEA or the installer whether your address counts.

How do you get the subsidy step by step?

SIEA lists ten steps on its page "Ako na to". The core steps are below. The page still uses the word voucher (poukážka) in places. The general conditions of October 2026 speak of a contribution (príspevok) paid after a contract.

  1. Read the conditions, choose the device and agree on the installation with a supplier.
  2. Register the application on zelenadomacnostiam.sk. The registration opened on 26 October 2026.
  3. Request a reservation of funds. SIEA accepts requests from 2 November 2026 and reserves funds when the reserved volume falls below a minimum limit.
  4. After SIEA sends the reservation notice, submit the invoice and the proof of payment within 45 days.
  5. SIEA assesses the application within 60 working days. If the conditions are met, it sends a contract.
  6. SIEA pays the contribution to the household bank account after it receives the signed contract.

The device must be installed and put into operation after 1 January 2024 to be eligible. A household may send a complete application before the reservation if the device is already installed.

What if a hybrid system suits the house better?

A hybrid keeps the boiler as a second source next to a heat pump. The Directive (EU) 2024/1275 says incentives for hybrid systems with a considerable renewable share remain possible (recital 14). Read hybrid heat pump for the ecodesign terms.

Frequently asked questions

Do I need a building permit to replace a gas boiler with a heat pump?
Usually no permit and no notification, but the exact case decides. Act 25/2025, § 18, paragraph 5 exempts the replacement of technical building systems and renewable heat devices up to 50 kW. Heritage and other cases in paragraph 3 may differ.
How much subsidy can I get for a heat pump in 2026?
As of November 2026, Zelená domácnostiam pays 400 €/kW for a heat pump, up to 10 kW, so at most 4 000 €. The 15 % bonus raises the maximum to 4 600 €. The contribution is at most 50 % of eligible expenses.
Who can apply for the subsidy for a new heat source?
An owner of a family house or of a flat in a family house can apply. The property must not belong to a legal person or sit in business assets. More than 20 % of the floor area must not be rented out.
Is there a date after which I must replace my fossil fuel boiler?
This page found none. Directive 2024/1275 asks Member States to strive to replace stand-alone fossil boilers under national phase-out plans. It sets no date for a household.
Does the subsidy cover a replacement made before I apply?
It can. As of November 2026, a device installed and put into operation after 1 January 2024 is eligible. The expenses must also have arisen after that date, and the application must still win a reservation.
Is a pellet boiler subsidised if it replaces a gas boiler?
No. The conditions require a pellet boiler to replace a solid fossil fuel appliance. SIEA marks an application as not meeting the conditions when this is not the case.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 11 ods. 2 písm. e), § 18 ods. 2, 3 a 5
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (novela) · Slov-Lex · Čl. I bod 62 (nový § 18 ods. 4 písm. b)
  3. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · Official Journal of the European Union · Art. 13 par. 1, 6 and 7, Art. 17 par. 15, Art. 35 par. 1, Annex II, recital 14
  4. Všeobecné podmienky národného projektu Zelená domácnostiam II., verzia 1, účinné od 21. októbra 2026 · SIEA (Slovenská inovačná a energetická agentúra) · čl. B, C, F, G, H bod 12, I bod 2 až 4, Príloha 1
  5. Ako na to v Zelenej domácnostiam · SIEA (zelenadomacnostiam.sk)
  6. Harmonogram projektu Zelená domácnostiam · SIEA (zelenadomacnostiam.sk)