Passive House Guide: Criteria, A0 and Certification

9 min read
A window seated in an exceptionally deep insulated wall reveal in an unfinished passive house room

A passive house is a building that meets the performance standard of the Passive House Institute (PHI) in Darmstadt. The standard is voluntary and sets measurable limits, not a list of materials. This text explains what the criteria require. It shows how they differ from the legal requirement for a class A0 new build and what that means for a project.

What is a passive house and who sets its criteria?

A passive house is a building that meets the criteria of the Passive House standard. The Passive House Institute issues them, and its website showed version 10c of January 2023 as current on 11 November 2026. The criteria apply in all climates.

PHI describes the standard with five principles: very good thermal insulation, energy-efficient windows, controlled ventilation with heat recovery, no thermal bridges and airtightness. Anyone may build a passive house. Only a building examined by a PHI-accredited certifier may carry the word "certified" and the PHI seal. A house that meets the criteria without certification is in the standard, but it may not carry that label.

What values must a passive house reach?

The criteria of version 10c set these limits. Unless stated otherwise, they refer to the floor area TFA, which the PHPP method calculates.

CriterionLimitNote
Heating demandat most 15 kWh/(m²·a)Table 1 lists a heating load of at most 10 W/m² as an alternative.
Cooling and dehumidification demandat most 15 kWh/(m²·a) plus an allowanceThe allowance depends on climate, air change and internal gains.
Airtightness n50at most 0.6 1/hResult of a pressure test of the whole envelope.
Renewable primary energy (PER) demandClassic 60, Plus 45, Premium 30 kWh/(m²·a)Includes all energy uses in the building.
Renewable energy generationClassic no requirement, Plus at least 60, Premium at least 120 kWh/(m²·a)Refers to the building footprint, not to TFA.
Summer overheatingat most 10 % of hours a year above 25 °CFor buildings without active cooling.
Surface temperaturewalls and ceilings at most 4.2 K below the operative temperature, floor at least 19 °CCalculated for a room at 22 °C.

The Classic, Plus and Premium classes have the same limits for heating, cooling and airtightness. They differ only in the PER limit and the renewable generation requirement. Two values "per square metre" compare only when they use the same area definition, so ask which area a foreign figure refers to. Off-site generation counts only from new systems owned by the builder or a long-term user, and not from biomass, waste-to-energy plants or geothermal energy.

What is the difference between a passive house and a class A0 new build?

Class A0 is a legal minimum requirement, a passive house is a voluntary PHI standard. Under § 4b para. 1 of Act 555/2005, all new buildings must be nearly zero-energy buildings from 31 December 2020. Decree 364/2012 states this in § 5 para. 4 as the upper limit of energy class A0 of the global indicator, and § 4 para. 10 sets it at 0.25 Rr.

The act and the decree measure a different quantity than PHI. The global indicator is the primary energy of the building. For a family house the class A0 limit is 54 kWh/(m²·a) (annex 3, table F). The PHI criterion is a heating demand of 15 kWh/(m²·a) and airtightness. The numbers 54 and 15 therefore cannot be compared. Neither Act 25/2025, Act 555/2005 nor Decree 364/2012 defines a passive house as a separate category.

From 1 January 2027, Act 246/2026 changes § 3 of Act 555/2005. The class scale becomes A0 to F. By total primary energy demand, a nearly zero-energy building falls into class A. The text of the amendment contains no numeric limits for the new scale. The article on the energy certificate and class A0 explains the context.

What is a low-energy house and how does it differ from a passive house and class A0?

Decree 364/2012 links the names to the upper limits of the energy classes of the global indicator in § 4 para. 15. The upper limit of class B sets the low-energy level of construction. Class A1 sets the ultra-low-energy level and class A0 the level of nearly zero-energy buildings. For a family house the limits are at most 216, 108 and 54 kWh/(m²·a) (Annex 3, table F). A passive house is not part of this scale, because it is a PHI standard with different quantities.

PHI has two more standards. EnerPHit is for the retrofit of existing buildings and allows an airtightness n50 of at most 1.0 h⁻¹. PHI Low Energy Building is for buildings that do not fully meet the passive house criteria. It sets heating demand at most 30 kWh/(m²·a), n50 at most 1.0 h⁻¹ and PER at most 75 kWh/(m²·a). The word "low-energy" can therefore mean class B under the decree or the PHI standard, and the numbers in each case measure different quantities.

What does the law require for the design and kolaudácia of a passive house?

A passive house goes through the same procedure as any other new build, because the law does not know the PHI standard. Under § 4 para. 1 of Act 555/2005, a new building must meet the minimum energy performance requirements. Under § 4a para. 2, the project energy assessment takes place in the design phase. Under § 35 para. 6 let. j of Act 25/2025, the designer must design the materials of the perimeter and dividing structures to reach at least the minimum energy performance requirements. This applies where it is technically, functionally and economically possible.

At kolaudácia, the proposal includes the building's energy certificate if the building is subject to certification (§ 66 para. 2 let. j). During the inspection, the office also checks whether the building meets the required energy performance (§ 66 para. 4 let. g). The office does not assess compliance with the PHI criteria. That stays with the designer and, where used, the certifier.

How are airtightness and ventilation verified?

You prove airtightness by measurement. A calculation does not prove the limit. The n50 value is the air change per hour at a pressure difference of 50 Pa. The test follows ISO 9972 (method 1) at positive and negative pressure, and the average of both must meet the n50 limit. The test covers the whole heated or cooled volume, not random parts. The person who made the airtight layer may not do the test, and neither may the owner or close relatives. PHI recommends testing while the airtight layer is still accessible. Then you can repair defects. The article on the blower door test covers the procedure, and the blower door test entry defines it.

Ventilation must serve all rooms. In residential buildings the minimum is 20 m³/h per person. The flow must also give at least 0.30 air changes per dwelling unit, based on TFA multiplied by a height of 2.5 m. The user must be able to change the flow permanently. For certification, you submit a commissioning report signed by the person who set the flows (§ 3.2.6). The related topics are heat recovery ventilation and the article on heat recovery in practice.

What heat recovery efficiency do the decree and PHI require?

Decree 364/2012 calculates heating demand with a minimum average air change of 0.5 per hour. For buildings with the required airtightness and a very low heating demand, it requires heat recovery of at least 60 % (Annex 3, note q). Table 1 of the PHI criteria sets no minimum efficiency for a new passive house. A certificate or a test proves the efficiency of the unit. Only table 2 requires at least 75 % or 80 % in the colder climate zones (75 % for the Slovak climate). It is the component method for EnerPHit retrofits. This applies only when that method is chosen instead of table 3.

What about comfort and summer overheating?

The criteria measure comfort. The surface of a wall or ceiling may not be more than 4.2 K below the operative temperature. The floor may not fall below 19 °C. For windows, the check uses a point 0.5 m in front of the window. A less strict requirement applies to smaller windows.

A building without active cooling may have at most 10 % of hours a year above 25 °C. It may have at most 20 % of hours with air humidity above 12 g/kg. With active cooling, you must size the system adequately. The overheating risk is therefore calculated in the design, not added later. The article on summer overheating covers shading, cooling and other measures.

A defective insulation detail: rigid boards fixed to a wall with a ragged gap left open, daylight showing through
A gap in the insulation that lets daylight through is a point of air leakage and a thermal bridge.

Can a passive house have large windows?

Neither the PHI criteria nor Decrees 259/2008 and 364/2012 set a maximum glazed area. Windows are a design decision: heat loss in winter, solar gain in summer and daylight. Under § 2 para. 14 of Decree 259/2008 the indoor microclimate need not be measured if four conditions hold. A calculation proves the thermal properties of the structures and the thermal stability of the room. Heating provides the conditions in winter. The openings take at most 40 % of the area of the perimeter structures of the room. The openings on the sunny sides have external shading. Large glass therefore needs a calculation and external shading. The text on large glazing in a low-energy house covers the details.

How much does a passive house cost and does it pay off?

We give no flat sum or percentage surcharge here, because we found no dated official source for the Slovak market. The cost follows the five principles of the standard: insulation thickness, window quality, controlled ventilation with heat recovery, handling of thermal bridges and airtightness. Measurement adds cost. Certification adds the certifier's fee, which the certifier sets.

Compare quotes for the same house at the same level of completion, not by a price per square metre from different sources. Payback depends on the future price of energy, which nobody can guarantee. The calculation and its variables are in the article on whether a passive house pays off.

Does an energy certificate prove that a house is passive?

No. An energy performance certificate under Act 555/2005 places a building in a class by the global indicator in primary energy. PHI or a PHI certifier issues a passive house certificate under the PHI criteria, that is by heating demand, airtightness and PER. A class on one document therefore does not prove compliance with the other, and the passive standard needs PHI certification.

Why does the heat source change the A0 class and how is it chosen?

The global indicator is primary energy, that is delivered energy multiplied by a factor for the carrier. Annex 2 of Decree 364/2012 gives 2.2 for grid electricity and 1.1 for natural gas. A heat pump uses electricity, but it delivers several kilowatt-hours of heat for each kilowatt-hour of electricity, so it needs less delivered energy. The heat source can move the same envelope into a different class, but technology does not replace the envelope. A worked example is in the text on the energy certificate and class A0.

The efficiency of a heat pump depends on the water temperature. Regulation (EU) No 813/2013 defines the low-temperature application at a water outlet temperature of 35 °C. It defines the medium-temperature application at 55 °C. Compare the SCOP at the same temperature. The heating surface sets that temperature, and you cannot change it once it is built in. The texts on a heat pump or gas in a new build and on underfloor heating or radiators with a heat pump cover the choice.

Can a passive house get a subsidy?

The Zelená domácnostiam programme does not support the standard as such. SIEA runs the programme. It supports small renewable energy devices in family houses: photovoltaic panels, wind turbines, solar collectors, pellet boilers and heat pumps. The general conditions of Zelená domácnostiam II, version 1, apply from 21 October 2026. Amounts and eligibility change between calls, so check them in the current conditions before you apply. More is in the Zelená domácnostiam entry.

Who issues the certificates and where do you find experts?

An energy certificate under Act 555/2005 is prepared by a person who runs an energy certification trade and passed a competence exam (§ 6 para. 1). Before handing it to the owner, that person submits the draft certificate to the central register (§ 7 para. 6). A certificate is valid for at most ten years, and building works that affect energy performance end it earlier (§ 7 para. 7).

A passive house certificate is issued by a PHI-accredited certifier. The PHI website offers a search for certifiers and professionals. The certifier may not design the same house, but may be consulted by the designer. PHI recommends working with the certifier early, especially when the designer or the builder has no experience with passive houses.

In what order is a passive house designed and proven?

The order follows the documents that PHI requires for certification:

  1. Decide whether to certify the house and which class it targets.
  2. Prepare the energy balance in PHPP at the design stage. It is the basis of the documents for the certifier.
  3. Draw the position of the insulation and airtight layers and their connections in details.
  4. Measure airtightness while the layer is accessible.
  5. Commission the ventilation and hand over the report of the set flows.

The criteria and the procedure are the same for a masonry house and a timber frame house, because the standard sets performance, not material.

Frequently asked questions

Must a passive house be certified?
No, certification is voluntary. A house that meets the PHI criteria without certification is in the standard, but may not carry the label. Only a building examined by a PHI-accredited certifier may use the label and the PHI seal.
Is a class A0 house a passive house?
They are not the same. Class A0 comes from the act and the decree and measures the global indicator in primary energy. A passive house requires a heating demand of at most 15 kWh/(m²·a) and n50 of at most 0.6 1/h. Meeting one does not prove meeting the other.
Can a passive house be a timber frame building?
Yes. The PHI criteria set performance limits, not the material of the structure. What matters is that the house reaches and proves the limits, whether it is masonry or timber frame.
Does a passive house need a heating system?
Yes, the criteria limit the heating demand to 15 kWh/(m²·a), not to zero. The standard does not prescribe the heat source, but its consumption counts toward PER, which includes all energy uses in the building.
Can an existing house be converted to a passive house?
For retrofits PHI has a separate standard, EnerPHit, with an airtightness limit of n50 up to 1.0 1/h. The passive house standard with n50 up to 0.6 1/h applies to an existing building only if it can meet it.
What do Classic, Plus and Premium mean?
The classes have the same limits for heating, cooling and airtightness. They differ in the PER limit (60, 45 and 30 kWh/(m²·a)). They also differ in the generation requirement per footprint (none, at least 60 and at least 120 kWh/(m²·a)).
Is a low-energy house the same as a passive house?
No. Decree 364/2012 links the low-energy level to the upper limit of class B of the global indicator, 216 kWh/(m²·a) for a family house. A passive house is a PHI standard with a heating demand of at most 15 kWh/(m²·a). PHI also has its own Low Energy Building standard with a heating demand of at most 30 kWh/(m²·a).
Must a passive house have heat recovery of at least 75 %?
Table 1 of the PHI criteria sets no minimum heat recovery efficiency for a new passive house. For an EnerPHit retrofit, Table 2 requires at least 75 % or 80 % in the colder climate zones (75 % for the Slovak climate). This applies only when the component method is chosen instead of Table 3. Decree 364/2012 requires heat recovery of at least 60 % for buildings with a very low heating demand.

Sources

  1. Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c, January 2023, valid with PHPP 10 · Passive House Institute · Section 2.1, Table 1 and notes 1 to 8
  2. Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c, January 2023, valid with PHPP 10 · Passive House Institute · Section 2.4.1, 2.4.2, 2.4.3, 2.4.5
  3. Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c, January 2023, valid with PHPP 10 · Passive House Institute · Section 2.2 and 2.3, Tables 2 to 5
  4. Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c, January 2023, valid with PHPP 10 · Passive House Institute · Section 3.1, 3.1.1, 3.2.6, 3.2.10
  5. Building Certification: Building Criteria Version 10c · Passive House Institute · Page text and list of criteria versions
  6. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 10, § 4 ods. 1, § 4a ods. 2, § 4b ods. 1, § 6 ods. 1, § 7 ods. 6 a 7
  7. Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · § 4 ods. 7, 10, 11, 12, 15, § 5 ods. 4, Príloha č. 2, Príloha č. 3 tabuľka F a poznámka q
  8. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Slov-Lex · čl. I body 19 a 20, čl. IV
  9. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 35 ods. 6 písm. j, § 66 ods. 2 písm. j, § 66 ods. 4 písm. g
  10. Všeobecné podmienky národného projektu Zelená domácnostiam II., verzia 1, účinné od 21. októbra 2026 · SIEA (Slovenská inovačná a energetická agentúra) · čl. A až J, Príloha 1 Technické podmienky
  11. Podmienky pre rodinné domy, Zelená domácnostiam · SIEA (zelenadomacnostiam.sk) · Základné podmienky podpory pre rodinné domy
  12. Vyhláška č. 259/2008 Z. z. o podrobnostiach a požiadavkách na vnútorné prostredie budov · Slov-Lex · § 2 ods. 14
  13. Commission Regulation (EU) No 813/2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · European Union, EUR-Lex · Article 2

Topic

  • Passive house and energy