Plus-Energy House
A plus-energy house is a building that makes more renewable energy over one year than it uses, with the exact test set by each label.
What is a plus-energy house?
A plus-energy house is a building that makes more renewable energy over one year than it needs. Slovak law does not define "plus-energy house" (energeticky plusový dom), and neither does Directive (EU) 2024/1275. It is an industry label, and each body that uses it sets its own test. The tests below come from the Passive House Institute, the German federal building ministry and Slovak law.
Who defines a plus-energy house, and how?
Four definitions are in use. They do not give the same answer for the same house. Ask which label a project means before you compare designs, prices or results.
| Label | Who defines it | Test |
|---|---|---|
| Passive House Plus and Premium | Passive House Institute, Criteria for Buildings, Version 10c (January 2023) | Limits on renewable primary energy demand and on renewable energy generation. The values are in the second table. |
| Effizienzhaus Plus | German federal building ministry, brochure "Wege zum Effizienzhaus Plus", 2018 | Negative annual primary energy demand and negative annual final energy demand. The plot is the balance boundary. |
| Class A0+ | Slovak law. Decree 364/2012 Z. z. now, Act 555/2005 Z. z. as amended by Act 246/2026 Z. z. from 1 January 2027 | See the section on Slovak law below. |
The Effizienzhaus Plus brochure describes the German EnEV rules of its time. Check the current German rules before you rely on it.
What do the Passive House classes require?
The Passive House Institute sorts buildings into Classic, Plus and Premium by renewable primary energy (PER) demand and renewable energy generation. All three classes share a heating demand of at most 15 kWh/(m²a) and an airtightness result n50 of at most 0.6 per hour. PER demand uses the treated floor area as reference. Generation uses the projected building footprint.
| Class | PER demand, at most | Renewable generation, at least |
|---|---|---|
| Classic | 60 kWh/(m²a) | None required |
| Plus | 45 kWh/(m²a) | 60 kWh per m² of footprint per year |
| Premium | 30 kWh/(m²a) | 120 kWh per m² of footprint per year |
Within limits, higher demand can be offset by higher generation, and the reverse (Passive House Institute fact sheet 2015). A Classic building that generates energy may have a PER demand of up to 75 kWh/(m²a). Generation does not have to sit on the building. Renewable energy from other places counts if it comes from new systems, for example a new wind power plant the owner invests in.
Is a Passive House Plus the same as a plus-energy house?
Not necessarily. The Passive House Institute describes Plus as annual generation equal to consumption. It describes Premium as significantly more generation than consumption. Only Premium is therefore described as an energy surplus. See Passive House classes and Passive House.
How does Slovak law treat a house that makes a surplus?
Since 2021, Slovak law has an A0+ subclass for a nearly zero-energy building that exports or stores energy (Decree 364/2012 Z. z., § 4 ods. 11). The decree sets no balance test for this subclass.
From 1 January 2027, Act 555/2005 Z. z. § 3 ods. 8, added by Act 246/2026 Z. z., defines class A0+ more tightly. It corresponds to a building that meets two tests. Its primary energy need is at least 20 % lower than the maximum value for a zero-emission building. It also makes more renewable energy on site each year than its total annual primary energy need. Directive 2024/1275 lets Member States define such an A+ class but does not require it (Art. 19(2)). For an existing building renovated to A+, the Directive also requires an estimate of the life-cycle global warming potential on the energy certificate. The Slovak text quoted here does not repeat that rule. See energy class and energy performance certificate.
Does Slovak or EU law require a plus-energy house?
No. A new house in Slovakia built after 31 December 2020 must meet the nearly zero-energy level. That level is the upper limit of class A0 (Decree 364/2012 Z. z., § 5 ods. 4). Under the Directive, public bodies must build zero-emission buildings from 1 January 2028. All new buildings must follow from 1 January 2030 (Art. 7(1)). A plus-energy house goes beyond both and is voluntary. See nearly zero-energy building and zero-energy house.
What is the difference between a zero-energy house and a plus-energy house?
A zero-energy house has an annual balance of zero or better, and a plus-energy house has a stated surplus or a stated minimum generation. The U.S. Department of Energy definition of a zero energy building allows delivered energy to equal the exported energy or to fall below it. It therefore also admits a surplus. Labels such as Passive House Premium, Effizienzhaus Plus and Slovak A0+ set a stricter, written test. The balance is yearly in all of them, so a plus-energy house can still take energy from the grid at night and in winter.
Frequently asked questions
- What is the difference between a zero-energy house and a plus-energy house?
- A zero-energy house balances energy over a year. A plus-energy house makes more than it needs. The label sets the test, for example Passive House Premium, Effizienzhaus Plus or Slovak class A0+. The U.S. DOE zero energy wording also admits a surplus.
- Is a plus-energy house defined in Slovak law?
- No. Slovak law has no term for it. The nearest legal concept is class A0+. Decree 364/2012 Z. z. gives it to a nearly zero-energy building that exports or stores energy. From 1 January 2027 Act 555/2005 Z. z. sets a stricter test.
- Is Passive House Plus a plus-energy house?
- Not necessarily. The Passive House Institute describes Plus as annual generation equal to consumption. The Institute describes only the Premium class as generating significantly more than the building consumes.
- Does the EU require plus-energy houses?
- No. Directive (EU) 2024/1275 requires zero-emission buildings for new buildings from 2028 (public bodies) and 2030 (all). It only lets Member States define an optional A+ class for buildings that generate more renewable energy on site than their annual primary energy demand.
- What is an Effizienzhaus Plus?
- It is a German federal level. The ministry brochure of 2018 defines it as negative annual primary energy demand and negative annual final energy demand. The plot is the balance boundary. The ministry wrote it under the German EnEV rules.
- Is a plus-energy house independent of the grid?
- No. The definitions count a yearly total, not each hour. A plus-energy house can take grid energy when its generation is low, and none of the definitions above requires it to be disconnected.
Sources
- Criteria for Buildings: Passive House, EnerPHit, PHI Low Energy Building, Version 10c (January 2023) · Passive House Institute, Darmstadt · Section 2.1, Table 1
- Building certification: Passive House Classic, Plus and Premium · Passive House Institute
- Passive House Fact Sheet 2015/04, Part 3: The new Passive House Classes based on the PER system and their implications · International Passive House Association / Passive House Institute
- Wege zum Effizienzhaus Plus: Grundlagen und Beispiele für energieerzeugende Gebäude (6th edition, 2018) · Bundesministerium des Innern, für Bau und Heimat (Germany) · Definition: Effizienzhaus Plus
- A Common Definition for Zero Energy Buildings · U.S. Department of Energy, Building Technologies Office (with the National Institute of Building Sciences), September 2015 · Definition of Zero Energy Building (ZEB)
- Vyhláška Ministerstva dopravy, výstavby a regionálneho rozvoja Slovenskej republiky, ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (version from 10.03.2020) · Ministerstvo dopravy, výstavby a regionálneho rozvoja Slovenskej republiky · § 2, § 4 ods. 7, 10 a 11, § 5 ods. 4
- Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov (promulgated 08.10.2026, in force 01.01.2027) · Národná rada Slovenskej republiky · Čl. I bod 14 (§ 2 ods. 12 až 14), bod 19 a 20 (§ 3 ods. 7 a 8), bod 22 (§ 4 ods. 2)
- Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council, OJ L, 8.5.2024 · Art. 2 points 2 and 3, Art. 7(1), Art. 11, Art. 19(2), Art. 35(1)