Occupancy Decision (Legacy Term)

An occupancy decision (kolaudačné rozhodnutie) is a decision of the building office that allowed use of a finished building under the old Building Act.

What is an occupancy decision (kolaudačné rozhodnutie)?

An occupancy decision (kolaudačné rozhodnutie) is a decision of the building office that allowed use of a finished building under the old Building Act. That act is zákon č. 50/1976 Zb. The office issued it at the end of the occupancy proceedings (kolaudačné konanie).

The decision allowed the use of the building for a set purpose and, where needed, set conditions of use (§ 82 ods. 1). A finished building that needed a building permit could be used only on the basis of this decision (§ 76 ods. 1). The same rule applied to simple structures that the builder only had to notify (§ 76 ods. 3).

Act 50/1976 applied to building matters until 31 March 2025. Since 1 April 2025 the procedure has the name occupancy approval (kolaudácia). It ends in a kolaudačné osvedčenie (§ 84 ods. 11 písm. c and § 67 ods. 1 of zákon č. 25/2025 Z. z.).

Is an old kolaudačné rozhodnutie still valid?

Yes. The new act keeps legal relations that rest on decisions of building authorities under the old rules (§ 84 ods. 1 of zákon č. 25/2025 Z. z.). A decision issued in 2018 stays in place.

What is the difference between the kolaudačné rozhodnutie and the kolaudačné osvedčenie?

The kolaudačné rozhodnutie is the outcome of the old procedure. The kolaudačné osvedčenie is the outcome of kolaudácia since 1 April 2025.

AspectOld act 50/1976 (until 31 March 2025)Act 25/2025 (from 1 April 2025)
ProcedureKolaudačné konanieKolaudácia (§ 84 ods. 11 písm. c)
OutcomeKolaudačné rozhodnutie, which allows the use of the building (§ 82 ods. 1)Kolaudačné osvedčenie, which certifies the technical fitness of the building for its designed purpose (§ 67 ods. 2)
OfficeThe building office that issued the building permit (§ 77)The office that ran the intent proceedings (§ 48 ods. 1)
Notice of the inspectionAt least 10 days before the oral hearing with a site inspection (§ 80 ods. 1)Date announced within 7 working days of a complete proposal. Inspection within 30 days of the announcement (§ 66 ods. 3)
State fee for a family house100 euro (položka 62a písm. a bod 1 of zákon č. 145/1995 Z. z., version of 15 March 2025)90 euro, which is 30% of 300 euro (položka 59 písm. a bod 1 and písm. e, version of 1 September 2026)

Does a building still get a kolaudačné rozhodnutie after 31 March 2025?

Sometimes. The old rules still apply to some applications that the builder files after 31 March 2025. The table shows which.

SituationRules for the application
The building has a territorial decision from the old actOld rules, also for an application filed after 31 March 2025 (§ 84 ods. 5 of zákon č. 25/2025 Z. z.)
The building has an old building permit and the old rules did not require a territorial decisionOld rules, also for an application filed after 31 March 2025 (§ 84 ods. 6)
The proceedings began on or before 31 March 2025Old rules (§ 84 ods. 4 písm. b)
The building has a decision on the building intent under the new actKolaudácia and the kolaudačné osvedčenie (§ 66 and 67)

Proceedings under the old rules keep the old state fees (§ 19w of zákon č. 145/1995 Z. z.). Sections 84 ods. 5 and 6 name no end date for these applications.

How did the occupancy proceedings work under the old act?

  1. The builder filed a written proposal. It named the structure and its site, the expected completion date, and whether trial operation would run and for how long (§ 79 ods. 2).
  2. The building office that issued the building permit ran the proceedings (§ 77). The parties were the builder, the owner of the building and the owner of the land (§ 78 ods. 1).
  3. The office announced the start at least 10 days before the oral hearing with a site inspection. For linear structures and some very large structures it used a public notice at least 15 days before (§ 80 ods. 1).
  4. The office invited the designer. For a structure that the builder built without a contractor, it also invited the construction supervisor (§ 80 ods. 3).
  5. The office checked whether the builder built the structure by the documentation verified in the building proceedings. It also checked the conditions of the territorial decision and the building permit, and whether use would endanger the public interest (§ 81 ods. 1).
  6. If the office found defects that prevented use, it set a deadline to remove them and interrupted the proceedings (§ 81 ods. 3).
  7. The office issued the decision and announced it in the same way as the start of the proceedings (§ 82 ods. 6).

Which documents did the old kolaudačné konanie need?

The act lists no attachments to the proposal. Section 81b lists the cases in which the office did not issue the decision.

  • The verified documentation required heating or a connection to water, electricity or sewer, and it was missing (§ 81b písm. a).
  • The lifts were not safe and reliable.
  • There was no safe access to the structure.
  • The builder did not meet the conditions of the building permit on the completeness of the construction and on effects on the environment.
  • The builder did not present records of the prescribed tests and the manufacturer declarations of conformity of building products.
  • The building was a residential building under mandatory energy certification and the builder did not present the energy certificate.

The office could waive the proceedings for some notified minor structures and works. It could also waive them for simple structures, except dwellings, recreation buildings, garages and structures with operating or production equipment (§ 81c). For the documents of the current procedure see occupancy approval.

What did a kolaudačné rozhodnutie contain?

It allowed the use of the structure for the determined purpose and, where needed, set conditions of use (§ 82 ods. 1). The office could set a deadline to remove minor defects. It could do so only when the defects did not endanger health or safety and did not prevent proper use (§ 82 ods. 2).

For a non-residential building the office set a deadline of at most six months to submit the energy certificate (§ 82 ods. 3). If the building served as a commercial premises (prevádzkáreň), the decision also certified that it was fit for operation (§ 82 ods. 5). Under the new act the certificate does not replace a permit for operation under other laws (§ 67 ods. 3 of zákon č. 25/2025 Z. z.).

What did the kolaudačné rozhodnutie cost?

The state fee for the proposal was 100 euro for a family house and 500 euro for an apartment building (položka 62a písm. a bod 1 and 2 of zákon č. 145/1995 Z. z., version of 15 March 2025). Proceedings under the old rules keep the old fee (§ 19w). The current fee for the kolaudačné osvedčenie is on the occupancy approval page.

What if a building has no kolaudačné rozhodnutie?

If the owner built and used the building without a permit or against it, the owner can ask for a review of fitness for occupancy. The decision on the review has the effects of a kolaudačné rozhodnutie (§ 140d ods. 5 of zákon č. 50/1976 Zb.).

Using a building without a kolaudačné osvedčenie is an offence under the current act (§ 79 ods. 3 písm. c of zákon č. 25/2025 Z. z.). From 1 January 2027, amendment 243/2026 Z. z. adds an offence for the use of a building without the kolaudačné rozhodnutie or against it, where § 84 ods. 5 or 6 applies (čl. I bod 193).

Frequently asked questions

What is a kolaudačné rozhodnutie?
A kolaudačné rozhodnutie is the decision of the building office that allowed use of a finished building under the old Building Act 50/1976. It ended the kolaudačné konanie (§ 76 ods. 1 and § 82 ods. 1 of zákon č. 50/1976 Zb.).
Is the kolaudačné rozhodnutie the same as the kolaudačné osvedčenie?
No. The kolaudačné rozhodnutie is the outcome of the old procedure. The kolaudačné osvedčenie is the outcome of kolaudácia since 1 April 2025 (§ 84 ods. 11 písm. c and § 67 ods. 1 of zákon č. 25/2025 Z. z.).
Is an old kolaudačné rozhodnutie still valid?
Yes. The new act keeps legal relations that rest on decisions under the old rules (§ 84 ods. 1 of zákon č. 25/2025 Z. z.). A decision from 2018 stays in place.
Does a building still get a kolaudačné rozhodnutie after 1 April 2025?
Sometimes. The old rules still apply when the building has a territorial decision or a building permit from the old act. This holds also for an application after 31 March 2025 (§ 84 ods. 5 and 6 of zákon č. 25/2025 Z. z.).
Which documents did the old kolaudačné konanie need?
The act lists no attachments to the proposal (§ 79 ods. 2 of zákon č. 50/1976 Zb.). Section 81b names the evidence that the office needed. Examples are records of the prescribed tests and the manufacturer declarations of conformity. A residential building under mandatory certification also needed the energy certificate.
How much did the kolaudačné rozhodnutie cost?
The state fee for the proposal was 100 euro for a family house and 500 euro for an apartment building (položka 62a písm. a of zákon č. 145/1995 Z. z., version of 15 March 2025). Proceedings under the old rules keep this fee (§ 19w).

Sources

  1. Zákon č. 50/1976 Zb. o územnom plánovaní a stavebnom poriadku (stavebný zákon) · Slov-Lex · § 76 až 82, 140d
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 48, 66, 67, 79, 84
  3. Zákon č. 145/1995 Z. z. o správnych poplatkoch · Slov-Lex · položka 62a písm. a
  4. Zákon č. 145/1995 Z. z. o správnych poplatkoch · Slov-Lex · položka 59 písm. a, e, § 19w
  5. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex · čl. I bod 193