What is a geometric plan and what does it contain?
A geometric plan (geometrický plán) is the technical document from which the cadastre records a change to land. The cadastral act (act 162/1995 Z. z.) describes it as a technical basis for legal acts, public documents and other documents, which also serves as a basis for the entry of rights to real estate by vklad and záznam (§ 67 ods. 1). It is made from the results of geodetic work and shows the property before and after the change: the old and new parcel numbers, the land types, their areas and the data on rights (§ 67 ods. 2). See the glossary entry on the geometric plan.
The plan itself does not change ownership. When land is transferred by contract, the buyer becomes owner of the new parcel only by vklad into the cadastre (Civil Code, § 133 ods. 2).
When do you need a geometric plan?
A proposal to start a cadastral proceeding must give the official verification number of the geometric plan in these cases (act 162/1995 Z. z., § 24 ods. 1 písm. g):
- a parcel is divided, which is a land subdivision, or parcels are merged,
- an easement is set up on a part of a parcel, for example a right of way along a strip by the boundary,
- data on buildings, flats and non-residential premises are entered under § 46 ods. 2 to 4 and 6 to 8.
How an easement differs from a protection zone is explained in the article Protection zones and easements on a plot.
With a new house the geometric plan comes back once more, at the end of construction. The Building Act (act 25/2025 Z. z.) requires the geodet to make the geodetic part of the as-built documentation, the as-built survey of the building and a geometric plan to update the cadastral records (§ 40 ods. 3 písm. h). Depending on the type of building, this plan is also an attachment to the proposal for kolaudácia, the final inspection (§ 66 ods. 2 písm. d). The cadastre records a building once it is enclosed by perimeter walls and a roof structure (act 162/1995 Z. z., § 46 ods. 2).
Who makes the plan and who verifies it?
A geometric plan can be made by the district office, by a legal or natural person with a trade licence under a special regulation, or by an expert in geodesy and cartography appointed in court proceedings (act 162/1995 Z. z., § 67 ods. 3). A maker without a special authorisation from the Office has the plan verified by a person who holds the right to verify geometric plans (§ 67 ods. 4). The cadastre uses only a plan that the district office has also verified (§ 67 ods. 5).
The authorisation verification is done by an authorised land surveyor with special professional competence and an authorisation under a special regulation (§ 7 ods. 1). A natural person gains the special professional competence with a master's degree in geodesy and cartography, five years of professional practice and a pass in the qualification exam before the Office (act 215/1995 Z. z., § 7 ods. 2). The official verification is done on behalf of the district office by a cadastre employee with special professional competence (§ 9 ods. 2). The same person may not do both verifications (§ 9 ods. 3).
What are register C and register E parcels and why do they matter to a buyer?
The cadastre keeps land in two registers. Register C parcels are recorded on the cadastral map, register E parcels on the map of the determined operát (mapa určeného operátu) (act 162/1995 Z. z., § 7 písm. b). The cadastral map shows all real estate recorded in the cadastre (§ 3 ods. 10). The map of the determined operát shows plots delimited by ownership boundaries in the lease of legal and natural persons, merged into larger units (§ 3 ods. 11).
| Question | Register C | Register E | Source |
|---|---|---|---|
| Which map shows the parcel | Cadastral map | Map of the determined operát | 162/1995, § 7 písm. b |
| Is the land type binding data | Yes, unless proven otherwise | No | 162/1995, § 70 ods. 2 |
| Is the register named in the contract | Yes | Yes | 162/1995, § 42 ods. 2 písm. c |
On request, the district office prepares a parcel identification (identifikácia parcely) (§ 69 ods. 2). It compares the record and drawing of a property in a document and in other records with the record and drawing in the cadastre (§ 3 ods. 12). On paper it is a public document (§ 69 ods. 3).
For a register E parcel the land type is also not binding cadastre data (§ 70 ods. 2), so do not rely on it when you buy.
What is the difference between a boundary survey and setting out a building?
Boundary staking is a geodetic activity that marks in the field the position of the break points of a parcel boundary or another boundary (decree 461/2009 Z. z., § 51). If the owners and other entitled persons agree with the staked position, the points are marked permanently, otherwise only temporarily (§ 53). You order a boundary survey before a purchase or before building a fence.
Setting out a building is a different task. A new building, an extension and landscaping works may be carried out only after a geodet has set them out in the field. The exception is a minor structure that needs a notification (act 25/2025 Z. z., § 42 ods. 1). From 1 January 2027, amending act 243/2026 Z. z. removes this exception.
| Task | What it does | Source |
|---|---|---|
| Geometric plan | Shows the state before and after the change, is the basis for the entry in the cadastre | 162/1995, § 67 |
| Boundary staking | Marks the break points of a boundary in the field | 461/2009, § 51 and 53 |
| Setting out a building | Marks the position of the building in the field | 25/2025, § 40 ods. 3 písm. e, § 42 |
| As-built survey | Measures the finished building, and the geodet also makes a geometric plan to update the cadastre | 25/2025, § 40 ods. 3 písm. h |
Does dividing a plot need a permit from the building office?
Neither the Building Act nor the Spatial Planning Act (act 200/2022 Z. z.) has a proceeding for the division of land. The cadastre enters the data on parcels created by a geometric plan even without a legal act, at the owner's request (act 162/1995 Z. z., § 67 ods. 1).
A division does not by itself create a building plot. The Building Act defines a building plot as a part of the territory that spatial planning documentation designates for building, and a plot with a building on it (§ 7 ods. 1). Whether you can build on the new parcel depends on the spatial plan. A zonal plan sets the conditions for the spatial arrangement and functional use of individual plots and the conditions for placing buildings on them (act 200/2022 Z. z., § 23 ods. 3 písm. a). None of these acts sets a minimum area for a building plot. If your municipality's plan has one, you find it in the regulations for the zone. How to read them is explained in the article How to read a municipal land-use plan.
For agricultural and forest land outside the built-up area of a municipality, act 180/1995 Z. z. also applies (§ 21 ods. 1). A division by legal act, by a court settlement of co-ownership or by an inheritance decision may not create an agricultural parcel smaller than 3,000 m² or a forest parcel smaller than 5,000 m² (§ 23 ods. 1). If the new parcel is agricultural land of 3,001 to 20,000 m² or forest land of 5,001 to 20,000 m², the acquirer pays a levy (§ 22 ods. 1). These limits do not apply when the land is divided for construction (§ 24 ods. 3 písm. a).
How do you divide a plot held in co-ownership?
With co-ownership in shares, a division means ending the co-ownership and giving each owner a parcel of their own. Co-owners may agree to end the co-ownership and settle among themselves. For real estate the agreement must be in writing (Civil Code, § 141 ods. 1). The co-owners' signatures on such a contract must be certified. This does not apply to a contract for the transfer of real estate made as a notarial deed or authorised by an attorney (act 162/1995 Z. z., § 42 ods. 3).
If they do not agree, the court ends the co-ownership on the proposal of any co-owner. It considers the size of the shares and the sensible use of the thing. If a division is not well possible, the court gives the thing to one or more co-owners for fair compensation (Civil Code, § 142 ods. 1). When it divides the thing, the court may set an easement on a new property for the owner of another new property (§ 142 ods. 3), for example for access to a rear parcel.
Have the geometric plan made before you sign the agreement. The contract must identify the property by parcel number, register, land type and area (act 162/1995 Z. z., § 42 ods. 2 písm. c), and for new parcels these data come into being only in the plan. If a new parcel is made from pieces of parcels with different legal relations, the plan can be entered only together with the ownership rights to all the pieces (decree 461/2009 Z. z., § 46 ods. 3).
How does a division work step by step and how long does the vklad take?
The table applies to a division where one of the new parcels is sold.
| Step | Who | Period or rule | Source |
|---|---|---|---|
| 1. Marking the break points of the boundaries that change | Owner | Before the survey, if the points are not yet marked | 461/2009, § 46 ods. 1 |
| 2. Survey and drawing of the plan | Geodet | The plan shows the state before and after the change | 162/1995, § 67 ods. 2 and 3 |
| 3. Authorisation verification | Authorised surveyor | A different person from the official verification | 215/1995, § 7, § 9 ods. 3 |
| 4. Official verification | District office, cadastre department | The file is submitted in at least four copies | 162/1995, § 67 ods. 5, 461/2009, § 50 ods. 1 |
| 5. Contract naming the new parcels | Seller and buyer | In writing, the transferor's signature as a rule certified | 162/1995, § 42 |
| 6. Proposal for vklad with the plan's verification number | Parties to the contract | Decision within 30 days of delivery of the proposal, within 20 days for a notarial deed or a contract authorised by an attorney if the contract agrees with the cadastral records, within 15 days in the expedited procedure for a fee | 162/1995, § 24 ods. 1 písm. g, § 32, 145/1995, položka 11 |
| 7. Entry on the title deed (list vlastníctva) | District office | On the day the decision becomes final, at the latest the next working day | 162/1995, § 43 ods. 1 písm. a |
| 8. Permanent marking of the new break points | Owner | Within 30 days of delivery of the decision allowing the vklad or of the notice of the entry | 461/2009, § 46 ods. 2 |
The district office decides on the cadastral deposit (vklad): if the conditions are met it allows the vklad, otherwise it rejects the proposal (act 162/1995 Z. z., § 31 ods. 3).
If you divide a plot to build on it, ask an architect whether the house, with its distances and access, fits on the new parcel before the geodet draws the boundary. After the entry only another plan can change it. The article below covers the full review of a plot before purchase: How to choose a building plot.
