Authorised land surveyor
An authorised land surveyor is a licensed geodesist who verifies surveying results, such as a geometric plan, under Slovak law.
What is an authorised land surveyor?
An autorizovaný geodet a kartograf (authorised geodesist and cartographer) is a natural person with special professional competence and an authorisation. This person verifies certain surveying and mapping results in Slovakia. The rules sit in act 215/1995 Z. z. on geodesy and cartography. The title does not describe anyone who measures land. It describes a legal role. Act 487/2021 defines the activity (section 10(1)). The surveyor verifies whether the documentation meets the generally binding and technical regulations in content and form.
The geometrický plán (geometric plan) is one result the authorised surveyor verifies. Under act 162/1995, section 67, it shows a property before and after a change, with the old and new parcel numbers and areas. It is a technical basis for legal acts and for entries in the cadastre. Act 215/1995 puts the verification on a natural person (section 6 and section 7(1)), even when a surveying firm carries out the field work.
Which surveying results need authorised verification?
Section 6 of the act lists the surveying activities in letters a) to j). Letters a) to e) that are taken into the state documentation (štátna dokumentácia) must be verified by an authorised person under section 7(1). Section 9(1) adds a second, official verification by the district office for some of them. The table below shows the three activities most relevant to a plot split or boundary question.
| Activity under section 6 | Authorised verification (section 7(1)) | Official verification by district office (section 9(1)) |
|---|---|---|
| a) Geometric plans | Yes, when taken into state documentation | Yes |
| b) Geodetic work for land consolidation (pozemkové úpravy) | Yes, when taken into state documentation | Yes |
| c) Marking of plot boundaries (vytyčovanie hraníc pozemkov) | Yes, when taken into state documentation | Not listed in section 9(1) |
How does the authorised verification differ from the district office verification?
The two verifications answer different questions and are carried out by different people. Section 9(3) states that the same natural person may not perform both the official and the authorised verification of one result. The comparison below summarises the difference.
| Feature | Authorised verification | District office verification |
|---|---|---|
| Who carries it out | A natural person with special professional competence and an authorisation | An employee of the district office performing state service in the cadastre field, who has special professional competence |
| Legal basis | Section 7(1) of act 215/1995 | Section 9(1) and 9(2) of act 215/1995 |
| Can the same person do both? | No, section 9(3) prohibits it | No, section 9(3) prohibits it |
How does someone become an authorised land surveyor?
Section 7(2) of the act sets two conditions. The first is a second-degree university degree in geodesy and cartography, or a recognised equivalent. A second-degree degree in mining surveying also counts, with five years of practice in the listed surveying activities. The second is passing a qualification examination before the Office of Geodesy, Cartography and Cadastre (Úrad geodézie, kartografie a katastra). After a successful examination, the office issues a certificate of special professional competence under section 7(4).
The authorisation itself comes from the Chamber of Geodesists and Cartographers (Komora geodetov a kartografov), under act 487/2021 Z. z., in force from 1 January 2022. The chamber is a self-governing professional organisation and keeps the list of authorised geodesists and cartographers (zoznam autorizovaných geodetov a kartografov). One condition for entry is a qualification examination before the chamber. The other route is proof of the special professional competence with a certificate (section 6(1)(c)). Entry in the list gives the right to verify the selected surveying results (section 6(15)). The surveying act still refers to the earlier 1995 chamber act in its footnote 4. Act 487/2021 repealed that act (section 25), so the newer act is the one to read for current chamber rules.
How is an authorised land surveyor different from a geodetic survey?
A geodetic survey is the measurement work itself. It fixes points, measures the terrain and produces the results. An authorised land surveyor is the person who verifies that work for entry into the state documentation. One term describes an activity, the other describes a legal status. A single project can involve a surveying firm doing the measurement and an authorised person verifying the result.
Cadastre records are a separate layer again. A cadastral map shows the parcels, and the ownership sheet is described in register C. The authorised surveyor's work typically feeds into those records once the verification is complete.
Why does the authorised verification matter for a plot split?
When an owner divides a plot, a surveyor measures and documents the new boundaries. The cadastre records them afterwards. The geometric plan is the document that carries those measurements, and the act makes its authorised verification a separate step from the field work. Owners who commission a split should ask whether the surveyor holds the authorisation under section 7. They should also ask whether the district office will verify the plan. The boundary survey and the boundary line articles explain the measuring and marking side in more detail.
What are common misconceptions about authorised land surveyors?
The first misconception is that a surveying company verifies a plan as a company. The act places the verification on a natural person, so a firm can employ the surveyor but the verification is still a named person's act. The second is that an architect's licence covers the work. The act requires special professional competence and authorisation under section 7, which is separate from an architect's qualification. The third is that the district office verification is the same as the authorised verification. They are distinct steps, and section 9(3) keeps them with different people.
This article describes the legal framework only. It does not replace the act's text. For a specific project, read the current consolidated version of the act on slov-lex.
Frequently asked questions
- Who can verify a geometric plan in Slovakia?
- A natural person with special professional competence and an authorisation, under section 7(1) of act 215/1995 Z. z. The verification is done by a named person, not by a company as such.
- Does a geometric plan get two verifications?
- Yes, when the plan goes into the state documentation. Section 9(1) requires an official verification by the district office in addition to the authorised verification. Section 9(3) says the same person cannot perform both.
- Can an architect verify a geometric plan?
- Not on the strength of an architect's licence alone. Section 7(1) requires special professional competence and an authorisation granted under the separate rules for surveyors, so an architect would need that qualification as well.
- What is the Chamber of Geodesists and Cartographers?
- It is a self-governing professional organisation under act 487/2021 Z. z., in force from 1 January 2022. It keeps the list of authorised geodesists and cartographers. When it enters a person in the list, it issues the authorisation, an official stamp and a mandate certificate.
- What does the qualification examination involve?
- Act 215/1995, section 7(2), requires a second-degree university degree in geodesy and cartography, or a recognised equivalent, and a successful qualification examination. The same section names the Office of Geodesy, Cartography and Cadastre as the examiner. Act 487/2021, section 6(1)(c), names two routes into the chamber's list. One is an examination before the chamber. The other is a certificate of the competence.
Sources
- Zákon 215/1995 Z. z. o geodézii a kartografii (consolidated version from 1 April 2025) · Národná rada SR, via Slov-Lex · § 6 písm. a) to c), § 7 ods. 1, 2 and 4, § 9 ods. 1 to 3, footnote 4
- Zákon 487/2021 Z. z. o Komore geodetov a kartografov (version from 1 January 2022) · Národná rada SR, via Slov-Lex · § 2 písm. a), § 3 ods. 1, § 6 ods. 1 písm. c), ods. 14 and 15, § 10 ods. 1, § 25
- Zákon 216/1995 Z. z. o Komore geodetov a kartografov (version from 1 July 2016, repealed) · Národná rada SR, via Slov-Lex · Version header (repeal notice)
- Zákon č. 162/1995 Z. z. o katastri nehnuteľností (katastrálny zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 67 ods. 1 a 2