Plot boundary

A plot boundary is a legal line that separates one parcel from its neighbours. Turning points recorded in the cadastre fix its course.

What is a plot boundary in the Slovak cadastre?

A plot boundary (hranica pozemku) is the legal line that separates one parcel from its neighbours. In the Slovak cadastre a parcel is defined by its geometric determination. That means the shape and size of the parcel, set out by its boundary lines. Each boundary runs as a straight line between two neighbouring turning points (lomové body). A surveyor fixes those points when the parcel is measured.

The cadastre is run by the cadastral department of the district office, and its data count as valid until someone proves otherwise. The online cadastral portal is meant for information and online access, and a legally valid extract has to be requested from the district office. A cadastral map shows parcels as projections of their boundaries onto a plane. It is a drawing of the boundary, not a separate legal line.

Why does the fence on site not always match the boundary?

A boundary does not have to be realised on the ground, and it need not be a fence. A fence on site shows where people use the land. That is not the same thing as the legal line. Where turning points are not marked, the investigation of the boundary (prešetrovanie) works from the legal state in the cadastre. The difference from the ground is noted in the record.

Under section 3(2) of the cadastral act, the boundary of neighbouring parcels is the line of actual possession. This applies when the neighbours accept it and do not dispute it. A fence that marks such a line can therefore count. A contested fence does not become the legal line by being there. A corner of a wall, a masonry fence or a building counts as a marked turning point when it is clearly fixed on the ground.

ElementWhat it showsWeight
Cadastral boundary (C-register)Turning points and the straight lines between themGeometric determination is a reliable and binding cadastral datum unless the opposite is proved (section 70(2))
Fence or wall on siteWhere the owners or earlier users put itNot binding on its own; the line of actual possession counts where neighbours accept it and nothing is disputed
Map in the online portalParcel outlines for informationInformational; the legal extract is the document to rely on

How do old maps and E-register parcels cause discrepancies?

Most discrepancies come from how the cadastre was built. Before 1927 the basic mapping was largely graphic: lines were drawn straight onto paper, for example with a plane table. A numeric map keeps coordinates for every detail point, so the original can be rebuilt if it is destroyed. A non-numerical map keeps only the drawing. In a non-numerical map the position of the turning points is not reliable. The shape and size of a parcel on the ground should still match its legal record. A mismatch is noted in the record of the investigation.

The E-register (E-register parcel) is a second group. These parcels were entered into the cadastre from land-register records (pozemková kniha). Their area was taken from that register without testing the figure. The cadastral act says that the kind of land of an E-register parcel is not a binding datum (section 70(2)). In a judgment of 30 September 2015 (10Sžr/113/2014) the Supreme Court of the Slovak Republic upheld this reading. It also held that the area of an E-register parcel is not a binding datum. The binding datum is the geometric determination of the property.

BasisWhat it recordsPractical effect
Numeric cadastral mapMeasured coordinates for every detail pointCan be rebuilt if the original is destroyed
Non-numerical map (graphic mapping before 1927)A drawing with no stored coordinatesTurning points may not be reliable; compare with the ground
E-register parcelArea and kind of land taken from older land-register recordsArea and kind are not binding; the geometric determination is

Why does the boundary line matter for building rules?

Some building rules start from the boundary line. The Building Act, act 25/2025 Z. z. in the version in force until 31 December 2026, defines a neighbouring parcel (section 7(2)). It is a parcel that shares a common boundary with the parcel where work is planned. A parcel with no common boundary also counts when the planned building or its use may directly affect how that parcel is used today. Some minor structures and alterations less than 2 m from the parcel boundary need a notification to the building office (section 18(3)(b)). These rules depend on the line being clear. If the cadastral line and the fence differ, the same building can be far from a neighbour on paper and close on site.

The distance values themselves are covered in building setback distances. This article covers only the line those distances start from.

How is a disputed or unclear boundary settled?

Start with a legal extract from the district office rather than the portal. Then compare the parcel shape in the cadastre with what stands on site. If the neighbours accept a line and nobody disputes it, the situation is simple. If they do not agree, a surveyor can locate the turning points and prepare a boundary survey. A survey documents the difference, but it does not by itself settle who is right.

How does a plot boundary differ from a building setback?

The plot boundary is a line the cadastre records. A building setback is a distance rule that starts from that line. Confusing the two is common: a setback rule applied to the wrong boundary gives the wrong answer. The land survey plan (geometrický plán) is a technical basis for legal acts and for cadastre entries (section 67(1) of the cadastral act). It is the document used when a boundary changes, for example when a parcel is divided. Check the boundary in the cadastre before you measure any distance.

Frequently asked questions

Is the fence the legal boundary of my plot?
Not automatically. The legal line is the one recorded in the cadastre. A fence can match it. Where it does not, the cadastral line counts. The exception is the line of actual possession that the neighbours accept and do not dispute (section 3(2) of the cadastral act).
Can I rely on the map in the online cadastral portal?
For a quick look, yes. For a purchase, a building application or a dispute, order a legal extract from the district office, because the portal is meant for information only.
What is an E-register parcel?
It is a parcel entered in the cadastre from older land-register records. Its area and kind of land are not binding, so get a survey before relying on its size or its line.
Who marks the turning points of my parcel?
The owner marks them permanently and pays for it. A corner of a wall, a masonry fence or a building that is clearly fixed on the ground counts as a marked point.
What should I check before buying land next to an E-register parcel?
Find out which register the plot sits in, get a legal extract, and ask a surveyor to show the turning points on the ground. A missing entry in the C-register is a reason to look more closely.

Sources

  1. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon), znenie od 1. apríla 2025 · Slov-Lex (Ministerstvo spravodlivosti SR) · § 3 ods. 2, 3, 4, 6 a 10; § 19 ods. 1 písm. c); § 67 ods. 1; § 70 ods. 1 a 2 (version from 1 April 2025)
  2. Kataster nehnuteľností · Ústredný portál verejnej správy (slovensko.sk) · Záväznosť údajov; Platný výpis z listu vlastníctva
  3. Rozsudok Najvyššieho súdu SR, sp. zn. 10Sžr/113/2014, ECLI:SK:NSSR:2015:7013200356.1 · Najvyšší súd Slovenskej republiky (nsud.sk) · Reasoning on E-KN parcels (judgment of 30 September 2015)
  4. Vyučba v teréne z mapovania a katastra nehnuteľností (Hudecová, L.; Geisse, R.) · STU Bratislava, Stavebná fakulta (svf.stuba.sk) · 3.3 Prešetrovanie hraníc pozemkov; 3.3.1; 3.3.2; section on map types (číselná a nečíselná mapa)
  5. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex (Ministerstvo spravodlivosti SR) · § 7 ods. 2; § 18 ods. 3 písm. b) (version 1 November 2025 to 31 December 2026)