Register E parcel

A register E parcel is a land parcel recorded on the map of the determined operator rather than on the cadastral map.

What is a register E parcel?

A register E parcel (parcela registra E) is a parcel that the cadastre records on the map of the determined operator (mapa určeného operátu). It is not recorded on the cadastral map. The cadastre act 162/1995 Z. z. lists these parcels next to register C parcels among the contents of the cadastre (§ 7 písm. b).

The act describes the map of the determined operator as a map of plots in the lease of legal and natural persons. Ownership boundaries delimit the plots, and they are merged into larger units (§ 3 ods. 11).

A register E parcel still has a parcel number, an area and a land type. The act defines a parcel as the geometric and positional definition of a plot, and its drawing on a map, with its parcel number. The map is the cadastral map, the map of the determined operator or a geometric plan (§ 3 ods. 3). Register E is the label for the second case.

The decree 461/2009 Z. z. says that the vector map of the determined operator shows the plots recorded as register E parcels (§ 2 ods. 1). The cadastre takes the map in by recording the decision that approves the register of renewed land records (§ 2 ods. 2). A register E parcel is therefore tied to that renewal process.

How does a register E parcel differ from a register C parcel?

The Slovak cadastre uses two parcel registers. Register C parcels are recorded on the cadastral map, a large-scale map of all real estate in the cadastre (§ 3 ods. 10). Register E parcels are recorded on the map of the determined operator. The table compares the two, based on the cadastre act and the decree 461/2009 Z. z.

FeatureRegister C parcelRegister E parcel
Map that carries the parcelCadastral mapMap of the determined operator
What the map showsAll real estate, each plot as a projection of its boundaries (§ 3 ods. 10)Plots that ownership boundaries delimit, merged into larger units (§ 3 ods. 11)
Data the decree listsParcel number, area, land type, land use code, protected property code, legal relationship code, location code, common property code, ownership list (decree § 9 ods. 1)Parcel number, area, land type, legal relationship code, location code, common property code, original cadastral territory, ownership list (decree § 9 ods. 2)
Is the land type binding?Yes, unless the contrary is shown (act § 70 ods. 2)No (act § 70 ods. 2)
Area correctionCorrected if it fails the coordinate criterion (act § 59 ods. 2 písm. f)The district office corrects it (act § 59 ods. 2 písm. g)

The table matters for a buyer. A register E parcel has a parcel number and an area, but you cannot rely on its land type as a binding cadastre datum. Read the land type in the current record, and do not assume it from the parcel label. The register C parcel entry covers the other side.

Why do register E parcels complicate buying and building?

The main problem is the boundary. The act sets one rule for the line between neighbouring plots. It counts the boundary of actual possession as the boundary, if the owners recognise it and do not dispute it (§ 3 ods. 2). A boundary on a map can therefore differ from the line the owners use.

The district office corrects a boundary that the cadastral map or the map of the determined operator shows wrongly. The map must not match the boundary marked on the ground, and the marks must not have moved since the original measurement (§ 59 ods. 2 písm. b). The office also corrects the area of a register E parcel (§ 59 ods. 2 písm. g).

For a house project, the plot you see on a map may differ from the plot you can use. The footprint of the house, access and distances to neighbours all depend on where the boundary runs. A neighbour's fence, an old wall or a shared driveway may sit on a line that the map does not show. Ask for a boundary survey before the site plan is drawn (see boundary line).

  • Check in the cadastre extract whether the parcel is register C or register E.
  • Compare the area in the record with the area you measure on site.
  • Look for visible marks, such as stones, pegs or fences, and note where they stand.
  • Read the current Building Act rules for the documents your project needs before you sign a purchase contract.

How are errors on a register E parcel corrected?

The district office corrects errors in the cadastral records in a correction procedure. It starts on the proposal of a person whose rights the data affect. It can also start on its own initiative or on a finding made in its work (§ 59 ods. 4).

The administrative procedure code does not apply to two corrections. They are the area and a wrongly shown boundary of a register E parcel (§ 59 ods. 5 písm. d). The office can make the correction in another cadastre procedure too. It then relies on the entry of a geometric plan (§ 59 ods. 6).

A geometric plan is a technical basis for legal acts, public deeds and entries into the cadastre (§ 67 ods. 1). It shows the real estate before and after a change. It gives the old and new parcel numbers, areas and land types (§ 67 ods. 2). The district office, a person with a trade licence, or a court-appointed expert may make it (§ 67 ods. 3). The cadastre uses only a plan that the district office has also checked (§ 67 ods. 5). The surveying act 215/1995 Z. z. says that the surveyor hands the plan, or the result of a boundary staking, over to the state documentation. The surveyor does this free of charge within 30 days of making it (§ 12 ods. 2 písm. d).

SituationUsual first stepBasis
Boundary on the map does not match the fenceBoundary staking by a surveyor, and agreement between the ownersAct 162/1995 Z. z., § 3 ods. 2 and § 59 ods. 2 písm. b. Surveying act, § 6 písm. c
Area in the record looks wrongMeasurement, and a proposal to the district office to correct the areaAct 162/1995 Z. z., § 59 ods. 2 písm. g and ods. 4
Plot is to be split or merged for the projectGeometric plan, checked and delivered to the cadastreAct 162/1995 Z. z., § 67. Decree 461/2009 Z. z., § 3

The surveying act lists geometric plans and boundary staking among the selected geodetic activities (§ 6 písm. a and c). An authorised person must check these activities (§ 7 ods. 1). See boundary survey and geometric plan for the two documents.

Can a register E parcel be sold and built on?

A register E parcel has a parcel number in the cadastre. A contract that transfers it must name it as a register E parcel (§ 42 ods. 2 písm. c). The practical question is whether the drawn boundary and the area are reliable enough for your project. Treat doubt as a reason to measure first.

The register label is a cadastre record. It is not a building rule. Ask the building office which documents it expects for your project under the current Building Act. The Slovak term parcela registra E is the one that the cadastre act uses.

How do you check a register E parcel before buying?

Start with the cadastre extract for the plot. Anyone has the right to look into the cadastral records and to make extracts for their own use (§ 68 ods. 1). The district office charges a fee for a certified extract (§ 72 ods. 1). Compare the parcel number, the area and the land type with the map.

If the parcel is register E, ask a licensed surveyor to check the boundary on site before you agree a price. The cost and the time depend on the surveyor and the size of the plot, so get a written quote.

A good check answers three questions. Where does the boundary run on the ground? Does the area agree with the measurement? Do the neighbours agree with the line? If one answer is open, add the cost of a geometric plan or of a boundary dispute to the purchase decision.

Frequently asked questions

What does register E mean in the Slovak cadastre?
Register E is the label for parcels recorded on the map of the determined operator (mapa určeného operátu). The cadastre act 162/1995 Z. z. lists these parcels next to register C parcels (§ 7 písm. b).
Is the land type of a register E parcel legally binding?
No. The act says the land type of a register E parcel is not a binding cadastre datum (§ 70 ods. 2). Check the land type in the current record. Do not assume it from the parcel label.
Can the area of a register E parcel be corrected?
Yes. The district office corrects the area of a register E parcel (§ 59 ods. 2 písm. g). It also corrects a boundary that the map shows wrongly (§ 59 ods. 2 písm. b).
Does a register E parcel stop me from building a house?
The register label alone is a cadastre record. It is not a building rule. Ask a licensed surveyor to check the boundary, then ask the building office which documents it expects for your project.
What is a geometric plan and how does it relate to register E?
A geometric plan is a technical basis for legal acts and for entries into the cadastre (§ 67 ods. 1). The office can also correct a register E area or boundary on the basis of an entry of a geometric plan (§ 59 ods. 6).
Can I look up the register of a parcel myself?
Yes. Anyone has the right to look into the cadastral records and to make extracts or copies for their own use (§ 68 ods. 1). The district office charges a fee for a certified extract (§ 72 ods. 1).

Sources

  1. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon), version from 1 April 2025 · Slov-Lex, Ministerstvo spravodlivosti SR · § 3 ods. 2, 3, 10, 11; § 7 písm. b; § 42 ods. 2 písm. c; § 59 ods. 2 písm. b a g, ods. 4, 5, 6; § 67 ods. 1, 2, 3, 5; § 68 ods. 1; § 70 ods. 2; § 72 ods. 1
  2. Vyhláška Úradu geodézie, kartografie a katastra Slovenskej republiky č. 461/2009 Z. z., version from 1 October 2018 · Slov-Lex, Ministerstvo spravodlivosti SR · § 2 ods. 1 a 2; § 3; § 9 ods. 1 a 2
  3. Zákon č. 215/1995 Z. z. o geodézii a kartografii, version from 1 April 2025 · Slov-Lex, Ministerstvo spravodlivosti SR · § 6 písm. a a c; § 7 ods. 1; § 12 ods. 2 písm. d