Register C parcel
A register C parcel is a land parcel that the Slovak cadastre records on the cadastral map, identified by its parcel number.
A register C parcel is a land parcel that the Slovak cadastre records on the cadastral map. The cadastre act 162/1995 Z. z. names two registers, register C and register E, and ties each one to its own map. Read the register label first when you check a plot, because it tells you which map carries the parcel.
What is a register C parcel?
Slovak law calls the cadastral record of land the kataster nehnuteľností, or cadastre of real estate. Section 7 of the act lists what the cadastre contains. The list includes parcel numbers and data on register C parcels recorded on the cadastral map. It also includes data on register E parcels recorded on the map of the determined operator (§ 7 písm. b).
The act defines a parcel as the geometric and positional definition of a plot, and its drawing on a map, with its parcel number. The map is the cadastral map, the map of the determined operator or a geometric plan (§ 3 ods. 3). A parcel number alone does not say which of these maps carries the parcel. The register label does.
The label also appears in legal documents. A document for an entry into the cadastre must name the plot as a register C or register E parcel. This covers a contract and a public deed (§ 42 ods. 2 písm. c).
Where is a register C parcel recorded?
The cadastral map is a large-scale planimetric map that shows all real estate and cadastral territories recorded in the cadastre. A plot appears on it as the projection of its boundaries onto the map plane. The map labels it with its parcel number and, as a rule, with a symbol for the land type (§ 3 ods. 10).
The decree 461/2009 Z. z. says that the cadastral map is made and updated as a vector map in electronic form or on paper map sheets (§ 1 ods. 1). The act puts the cadastral map in the geodetic file of the cadastral records. The same file holds the maps of the determined operator and the geometric plans (§ 8 ods. 1 písm. a).
The map of the determined operator is a different source. The act describes it as a map of plots that ownership boundaries delimit, in the lease of legal and natural persons. The plots are merged into larger units (§ 3 ods. 11). The decree says that its vector form shows the plots recorded as register E parcels (§ 2 ods. 1). The cadastre takes it in by recording the decision that approves the register of renewed land records (§ 2 ods. 2). The register E parcel entry covers that case.
How is a register C parcel different from a register E parcel?
The two registers differ in three ways: the map that carries the parcel, the land type, and the data the decree lists.
| Feature | Register C parcel | Register E parcel |
|---|---|---|
| Map that shows it | Cadastral map (katastrálna mapa) | Map of the determined operator (mapa určeného operátu) |
| What the map shows | All real estate, each plot as a projection of its boundaries (§ 3 ods. 10) | Plots that ownership boundaries delimit, merged into larger units (§ 3 ods. 11) |
| Land type as a binding datum | Binding, unless the contrary is shown (§ 70 ods. 2) | Not binding (§ 70 ods. 2) |
| Area correction | Corrected if the recorded area fails the coordinate criterion (§ 59 ods. 2 písm. f) | The district office corrects the area (§ 59 ods. 2 písm. g) |
| Data the decree lists | Parcel number, area, land type, land use code, protected property code, legal relationship code, location code, common property code, ownership list number (§ 9 ods. 1) | Parcel number, area, land type, legal relationship code, location code, common property code, original cadastral territory, ownership list number (§ 9 ods. 2) |
The decree records some of these data only when they are known (§ 9 ods. 3). A register E parcel and a register C parcel can look alike on a plan while resting on different map sources. Read the register label before you draw any conclusion about a boundary.
How do you read the register on a cadastre extract?
The cadastre enters rights to real estate into the list of ownership (list vlastníctva) and into the descriptive file (§ 41 ods. 1). The decree lists the number of the list of ownership among the data of a register C parcel (§ 9 ods. 1 písm. i). Use the table below as a checklist when you receive a parcel description, a deed or an extract.
| What to check | Why it matters |
|---|---|
| Register label next to the parcel number | A contract must name the plot as register C or register E (§ 42 ods. 2 písm. c). The number alone does not tell you which map applies. |
| Land type | Binding unless the contrary is shown for a register C parcel. Not binding for a register E parcel (§ 70 ods. 2). |
| Area | The act has separate rules for correcting the area of a register C parcel and of a register E parcel (§ 59 ods. 2 písm. f and g). |
| Boundary | The district office corrects a wrongly shown boundary. The map must not match the boundary marked on the ground, and the marks must not have moved since the original measurement (§ 59 ods. 2 písm. b). |
Who can correct an error in a register C record?
The district office corrects errors in the cadastral records in a correction procedure. It starts the procedure on the proposal of a person whose rights the data affect. It can also start on its own initiative or on a finding made in its work (§ 59 ods. 4).
The act treats the two registers differently. The administrative procedure code does not apply to some corrections. They are a wrongly shown register C boundary, and a register E area or boundary (§ 59 ods. 5 písm. d and e). The office can also correct a register E area or boundary in another cadastre procedure. It then relies on the entry of a geometric plan (§ 59 ods. 6).
What does a register C parcel mean for a land subdivision?
When an owner divides or merges plots, a geometric plan (geometrický plán) records the change. The decree describes it as a graphic drawing of the real estate that arises by division or merger. It shows the state before and after the change, with the old and new parcel numbers, areas and land types (§ 3).
The act calls the plan a technical basis for legal acts and public deeds. It also serves for the entry of rights into the cadastre (§ 67 ods. 1). The district office, a person with a trade licence, or a court-appointed expert in geodesy and cartography may make the plan (§ 67 ods. 3). Land surveyors are covered in authorized land surveyor, and the plan itself in geometric plan.
The plan needs two verifications. An authorised person verifies it (surveying act 215/1995 Z. z., § 7 ods. 1), and the district office verifies it officially (§ 9 ods. 1). The same person may not do both (§ 9 ods. 3). The cadastre uses only a plan that the district office has also verified (162/1995 Z. z., § 67 ods. 5). The surveyor hands the plan over to the state documentation free of charge within 30 days of making it (215/1995 Z. z., § 12 ods. 2 písm. d).
Check the register label of the starting parcel before the subdivision is designed. A boundary survey by an authorised surveyor is the usual way to find where a boundary runs on the ground. Register letters are a cadastre concept. They describe where a parcel is recorded, not whether a building on it is permitted.
Frequently asked questions
- What does register C mean in the Slovak cadastre?
- Register C is the label for parcels that the cadastre records on the cadastral map. The cadastre act 162/1995 Z. z. lists register C parcels and register E parcels separately in its list of cadastre contents (§ 7 písm. b).
- Is a register E parcel the same as a register C parcel?
- No. A register E parcel is recorded on the map of the determined operator (mapa určeného operátu). That map shows plots merged into larger units (§ 3 ods. 11). A register C parcel is recorded on the cadastral map.
- Does the register label change the land type of a parcel?
- It changes how far you can rely on the land type. The land type is a binding datum unless the contrary is shown. The act excludes the land type of a register E parcel (§ 70 ods. 2).
- Where should I look for the register label?
- Look in the cadastre extract and in any contract that transfers a right to the plot. A contract must name the plot as a register C or register E parcel (§ 42 ods. 2 písm. c).
- Does a register letter decide whether I can build on a plot?
- No. The register letter describes how the cadastre records a parcel. It is not a building rule. Ask the local building office which documents your project needs.
- Can the area of a register C parcel be corrected?
- Yes, in one case. The district office corrects the recorded area if it fails a criterion. The criterion compares it with the area computed from coordinates (§ 59 ods. 2 písm. f).
Sources
- Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon), version from 1 April 2025 · Slov-Lex (NR SR) · § 3 ods. 3, 10, 11; § 7 písm. b; § 8 ods. 1 písm. a; § 41 ods. 1; § 42 ods. 2 písm. c; § 59 ods. 2, 4, 5, 6; § 67 ods. 1, 3, 5; § 70 ods. 2
- Vyhláška ÚGKK SR č. 461/2009 Z. z. implementing the cadastral act, version from 1 October 2018 · Slov-Lex (ÚGKK SR) · § 1 ods. 1; § 2 ods. 1 a 2; § 3; § 9 ods. 1 až 3
- Zákon č. 215/1995 Z. z. o geodézii a kartografii, version from 1 April 2025 · Slov-Lex (NR SR) · § 7 ods. 1; § 9 ods. 1 a 3; § 12 ods. 2 písm. d