Cadastral map
A cadastral map is a large-scale planimetric map that shows all real estate in the Slovak cadastre as projected parcel boundaries.
What is a cadastral map?
A cadastral map (katastrálna mapa) is a large-scale planimetric map. It shows all real estate and cadastral territories recorded in the Slovak cadastre (act 162/1995 Z. z., § 3 ods. 10). The act says that each plot appears as the projection of its boundaries onto the map plane. The map labels it with its parcel number and, as a rule, with a symbol for the land type.
The map belongs to the geodetic file of the cadastral records. The same file holds the maps of the determined operator, the geometric plans and the records of detailed survey (§ 8 ods. 1 písm. a). The wider system is described in cadastre of real estate. The district office manages and updates the cadastral records on behalf of the ÚGKK SR (§ 18 ods. 1 písm. c).
How does a cadastral map differ from a geometric plan?
The two are often confused because both show parcels. A geometric plan is a drawing of real estate that arises by division or merger. It shows the state before and after the change, with the old and new parcel numbers, areas and land types (decree 461/2009 Z. z., § 3). The cadastral map is the standing map of the whole cadastral territory. A transaction does not create it.
| Feature | Cadastral map | Geometric plan |
|---|---|---|
| What it shows | All real estate and cadastral territories in the cadastre (§ 3 ods. 10) | Real estate before and after a division or merger (decree § 3) |
| Who keeps or makes it | The cadastre authorities keep it up to date (§ 18 ods. 1 písm. c) | The district office, a person with a trade licence, or a court-appointed expert (§ 67 ods. 3) |
| Form | Vector map in electronic form, or paper map sheets (decree § 1 ods. 1) | Graphic drawing with parcel numbers, areas and land types |
| Main use | Locating parcels and reading their numbers | Technical basis for legal acts and for entries into the cadastre (§ 67 ods. 1) |
Does the cadastral map show the real boundary on the ground?
Not always. The map shows the recorded boundaries as a projection onto a flat plane. A new survey of a cadastral territory follows the finding of where the boundaries run (§ 67d ods. 1). That is a separate step from the map itself.
The act also sets a rule for the line between neighbouring plots. It counts the boundary of actual possession as the boundary, if the owners recognise it and do not dispute it (§ 3 ods. 2). A fence or hedge can therefore sit in a different place from the line on the map.
The district office corrects a boundary that the map shows wrongly. The map must not match the boundary marked on the ground, and the marks must not have moved since the original measurement (§ 59 ods. 2 písm. b). A boundary survey finds where the recorded line runs on the ground. The map cannot do that.
The act treats several cadastre data as credible and binding unless the contrary is shown. They include the parcel number, the geometric determination of real estate and the land type (§ 70 ods. 2). It does not make a distance that you read off a zoomed viewer exact. Treat any measurement taken from a screen as an estimate.
How accurate is the cadastral map?
The decree 461/2009 Z. z. sorts the map into a numerical and a non-numerical form. A numerical map rests on numerical survey data (§ 1 ods. 2). A non-numerical map rests on the graphic results of a detailed survey. The decree notes the lower absolute accuracy of its content. It says that a file of taken-over measurements may complete the map (§ 1 ods. 3).
The decree also sets accuracy criteria for surveying and for the drawing of points. New detail points must have a basic mean coordinate error of at most 0.08 m (§ 59 ods. 4 písm. a). On a paper map, the mean error of a point drawn on the map may not exceed 0.16 mm (§ 59 ods. 10). These values apply to surveying and drawing. They do not guarantee every boundary on the map. Check any figure that a design depends on against the cadastral record.
| Map form | Origin under decree 461/2009 Z. z. | What it means for a reader |
|---|---|---|
| Numerical vector map | Made from numerical geodetic measurement, or by vectorising a numerical map (§ 1 ods. 2) | Coordinates come from measured values |
| Non-numerical vector map | Made by vectorising a map from the graphic results of a detailed survey (§ 1 ods. 3) | Absolute accuracy is lower. Ask the district office about the parcel before a design depends on the exact boundary |
| Paper map sheets | One of the two forms in which the cadastral map is made and updated (§ 1 ods. 1) | A paper map has its own drawing criterion (§ 59 ods. 10) |
What coordinate system does the cadastral map use?
The vector cadastral map holds the numerical measurement results in the S-JTSK system (§ 1 ods. 4 of decree 461/2009 Z. z.). The same provision covers the newer JTSK03 realisation of ETRS89. A conversion table (Prevodná interpolačná tabuľka) defines the link between JTSK03 and S-JTSK. A transformation service (Rezortná transformačná služba) converts the coordinates. Both are on the website of the ÚGKK SR. If you overlay the map on your own survey or on GPS data, check first that both use the same system.
How does a new cadastral map replace the old one?
A new survey of a cadastral territory produces a new geodetic file. Its large-scale map becomes the cadastral map when the renewal of the cadastral records ends (§ 67d ods. 2). The decree lists the cases in which the cadastre takes over a vector cadastral map. They include the renewal by new mapping and the compilation of the register of renewed land records (§ 1 ods. 5).
The vector map then becomes the cadastral map in electronic form, and the previous map becomes invalid. The district office marks the old map sheets or files as invalid (§ 1 ods. 6). The ÚGKK SR publishes the takeover on its website (§ 1 ods. 8).
Where can you view the cadastral map online?
The Geodetic, Cartographic and Cadastral Authority of Slovakia (ÚGKK SR) runs two public viewers. MAPKA (ZBGIS) at zbgis.skgeodesy.sk lets you browse and search cadastre data. The Môj kataster portal at katasterportal.skgeodesy.sk is a specialised cadastre portal. Use either viewer to find a parcel number and its approximate position.
The surveying act 215/1995 Z. z. says that information from the central cadastre portal is free of charge, and that it is not a public deed (§ 11 ods. 4 písm. b). For a legal, financing or design matter, order an official extract or copy from the district office. The office charges administrative fees for a certified extract or copy (162/1995 Z. z., § 72 ods. 1). Anyone has the right to look into the cadastral records and to make extracts for their own use (§ 68 ods. 1).
How does the cadastral map matter for a land subdivision?
When a parcel is divided or two parcels are merged, the cadastral map is the starting point, not the final record. A geometric plan records the new parcels. It is a technical basis for legal acts and for entries into the cadastre (§ 67 ods. 1). Only a plan that the district office has also checked goes to the cadastre (§ 67 ods. 5).
Before you buy or divide land, read the map together with the boundary line on the ground and a current extract. The map shows the geodetic side of the record, and the extract shows the descriptive side. The map also tells you which register a parcel belongs to. See register C parcel and register E parcel.
What are common misconceptions about the cadastral map?
- The map is a survey. It is a map of recorded parcels. It shows location and numbering. It does not mark boundaries on the ground.
- A scale reading on screen gives the exact boundary. Do not measure a boundary on a zoomed viewer. A boundary dispute needs a survey.
- A fence always marks the cadastral line. The act counts the boundary of actual possession, if the owners recognise it and do not dispute it (§ 3 ods. 2). The map and the ground can still differ, and the office corrects a wrongly shown boundary (§ 59 ods. 2 písm. b).
- Any printout is an official document. The viewer is an information tool. For a legal step, order an official extract from the district office.
Frequently asked questions
- Is the cadastral map the same as a cadastral extract?
- No. The cadastral map shows where parcels lie and what their numbers are. An extract (výpis) from the cadastre gives recorded data such as the owner and the rights to a parcel (§ 7 písm. c). Both come from the same cadastre, but they answer different questions.
- Can I use the cadastral map to prove where my boundary runs?
- Not on its own. The map shows the recorded boundaries as a projection onto a flat plane. Where a boundary is disputed or must be marked on the ground, a boundary survey by a surveyor is the usual route.
- Is the cadastral map a vector or a raster file?
- Under decree 461/2009 Z. z. the cadastral map is made and updated as a vector map in electronic form, or on paper map sheets (§ 1 ods. 1). Online viewers show it, but the underlying data is the vector map.
- Where can I view the cadastral map online?
- The Geodetic, Cartographic and Cadastral Authority of Slovakia (ÚGKK SR) runs two public viewers. They are MAPKA (ZBGIS) at zbgis.skgeodesy.sk and the Môj kataster portal at katasterportal.skgeodesy.sk. Use them to find a parcel. They are not public deeds.
- Do I need a geometric plan to change a parcel boundary?
- A division or a merger of parcels is recorded through a geometric plan. The district office, a person with a trade licence, or a court-appointed expert may make it (§ 67 ods. 3). The cadastre then records the change from the plan that the district office has also checked.
- What coordinate system does the cadastral map use?
- The vector cadastral map holds measurement results in the S-JTSK system (decree 461/2009 Z. z., § 1 ods. 4). The ÚGKK SR publishes a conversion table and a transformation service for coordinates from JTSK03 and ETRS89.
Sources
- Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon), version from 1 April 2025 · Národná rada SR, via Slov-Lex · § 3 ods. 2 a 10; § 7 písm. c; § 8 ods. 1 písm. a; § 18 ods. 1 písm. c; § 59 ods. 2 písm. b; § 67 ods. 1, 3, 5; § 67d ods. 1 a 2; § 68 ods. 1; § 70 ods. 2; § 72 ods. 1
- Vyhláška č. 461/2009 Z. z., ktorou sa vykonáva katastrálny zákon, version from 1 October 2018 · Úrad geodézie, kartografie a katastra SR (ÚGKK SR), via Slov-Lex · § 1 ods. 1 až 6 a 8; § 3; § 59 ods. 4 písm. a a ods. 10
- Zákon č. 215/1995 Z. z. o geodézii a kartografii, version from 1 April 2025 · Národná rada SR, via Slov-Lex · § 11 ods. 4 písm. b
- Úrad geodézie, kartografie a katastra SR: prehľad portálov (MAPKA / ZBGIS, Môj kataster) · Úrad geodézie, kartografie a katastra SR (ÚGKK SR) · Portal list and notice section