Boundary survey

A boundary survey is a geodetic job that marks the break points of a parcel line on the ground, using the cadastral data.

What is a boundary survey?

A boundary survey (Slovak vytýčenie hranice pozemku) is a geodetic job that shows on the ground where the legal boundary of a parcel runs. A surveyor takes the break points of the boundary from the cadastral data. The surveyor marks them in the field, so the owners can see where their land ends. Decree 461/2009 calls this activity boundary staking (vytyčovanie hraníc pozemkov). Section 51 defines it as a geodetic activity. It marks in the field the position of the break points of a parcel boundary or another boundary.

The job answers one question: where does the line run? It records the line on the ground. It does not settle a dispute about the line, and it does not change the cadastre. The cadastral act defines a parcel by its boundary, and the boundary is fixed by its break points (lomové body). A boundary survey makes those points visible again. See site boundary staking for the building job. See land survey plan for the document that records a change in the cadastre.

How does a boundary survey differ from staking out a building?

Two jobs in Slovak practice use the same word, vytýčenie. People often confuse them. A boundary survey marks the edges of a parcel. Staking out a building (vytýčenie stavby) marks the spatial position of a structure. The geodesy act lists it separately (section 6(h)). The two jobs answer different questions.

JobWhat it marksBasisWho does it
Boundary surveyBreak points of the parcel lineGeodesy act § 6(c); decree 461/2009 § 51Authorised natural person verifies (§ 7(1))
Building stakingSpatial position of a structureGeodesy act § 6(h)Authorised natural person verifies (§ 8)
Cadastral survey planProperty before and after a change, for recordingResults of geodetic work (cadastral act § 67(2))Maker under § 67(3); authorised verification (§ 7(1))

Who may carry out a boundary survey?

The geodesy act lists boundary staking among the selected geodetic and cartographic activities (§ 6 písm. c). It says that selected activities must be verified by an authorized natural person, and § 7 ods. 1 names the staking that is taken into the state documentation. In practice, an owner should look for an authorized land surveyor, who verifies the staking record before it goes to the district office. A neighbour with a tape measure can help to find the approximate line, but that is not a boundary survey.

Who has to mark the boundary points?

The cadastral act puts the duty on the owner. Owners and other authorized persons must mark the break points of a parcel boundary permanently, at their own cost (§ 19 písm. c). The duty has two exclusions. One is boundaries under a court dispute. The other is parts of boundaries that are leased and merged into larger units. The district office may call on the owner to mark the boundary by a deadline. If the owner does not, the office may have it marked at the owner's cost.

PartyRole in a boundary surveySource
OwnerMarks the break points permanently at own cost; takes part in the cadastral procedureCadastral act § 19 písm. b), c)
Authorized land surveyorStakes the boundary and makes the staking recordGeodesy act § 6; decree 461/2009 § 51 and § 54
District officeReceives the verified record; may have the boundary marked at the owner's cost after a callCadastral act § 19 písm. c); decree 461/2009 § 54 ods. 2

How is a boundary survey recorded?

The decree sets out what the staking leaves behind. The record includes a staking sketch, a technical report, a list of the point coordinates and a staking protocol. Where it applies, it also includes a vector geodetic base (§ 54 ods. 1). The authorisation-verified record goes to the district office (§ 54 ods. 2). The staked boundary is marked permanently at all break points only when owners and other authorized persons consent to the staked position of the points. Otherwise it is marked temporarily (§ 53). Before accepting a staked line, an owner should read the protocol. The owner should ask what the surveyor staked and against which cadastral data.

What if the neighbours disagree about the line?

A boundary survey shows where the line is in the field. It does not decide a dispute. The cadastral act has a rule for boundaries by actual possession (§ 3 ods. 2). If the owners of neighbouring parcels recognise that line and do not dispute it, it counts as the boundary. A boundary that is the subject of a court dispute is not marked under § 19 písm. c). The dispute itself is for the parties to resolve by agreement or before a court.

When is a boundary survey worth ordering?

Order a boundary survey before any work on or near the edge of a plot. Typical cases are a new fence or boundary wall. Others are a driveway or shed close to the line, a plot split, or a building on a tight site. The survey is advice, not a legal condition in every case. Its value is that the line is fixed on the ground before money is spent. The line itself is explained on the boundary line page, and the cadastral basis is on the cadastral map page.

What should an owner check before ordering the survey?

Check three things. First, that the surveyor is authorized for this kind of work. Second, that the cadastral data used for the job is current. The district office provides the documents for staking on request (decree 461/2009 § 52). Third, that the owner has a clear list of what is to be marked and where the markers will stand. If a neighbour is involved, invite them to the field visit. A survey that the neighbours never saw is easier to dispute later.

Frequently asked questions

Is a boundary survey the same as staking out a building?
No. A boundary survey marks the break points of a parcel line. Staking out a building marks the spatial position of a structure. Both are geodetic jobs, but they rest on different records and answer different questions.
Does a boundary survey change who owns the land?
No. The survey shows where the legal boundary runs on the ground. The survey itself does not change ownership or the cadastral entries. The parties or the courts resolve a dispute about the line.
Who must mark the boundary points?
The owner and other authorised persons, at their own cost, under section 19(c) of the cadastral act. Boundaries under court dispute and leased boundaries merged into larger units are excluded from this duty.
Does a boundary survey have to be done by an authorized surveyor?
The geodesy act lists boundary staking among the selected activities (section 6(c)). Section 7(1) says that a selected activity taken into the state documentation is verified by an authorised natural person. The decree says the authorised record goes to the district office. Ask the surveyor for proof of authorisation before ordering the work.
What happens if an owner does not mark the points?
After a call by the district office and a deadline in that call, the district office may have the boundary marked. The cost of that work falls on the owner.
Is a boundary survey needed before building a fence?
A boundary survey is a practical step, not a condition set by the sources checked for this term. It fixes the line before the work. Whether the fence itself needs a notice is a separate question covered on the fence page.

Sources

  1. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 3 ods. 2; § 19 písm. c)
  2. Zákon č. 215/1995 Z. z. o geodézii, kartografii a katastri (zákon o geodézii a kartografii) · Národná rada Slovenskej republiky, Slov-Lex · § 6 písm. c), h) and the closing sentence; § 7 ods. 1; § 8
  3. Vyhláška Úradu geodézie, kartografie a katastra SR č. 461/2009 Z. z., ktorou sa vykonáva katastrálny zákon · Úrad geodézie, kartografie a katastra SR, Slov-Lex · § 51, § 52, § 53, § 54 ods. 1 and 2
  4. Zákon č. 162/1995 Z. z. o katastri nehnuteľností (katastrálny zákon), § 67 · Národná rada Slovenskej republiky, Slov-Lex · § 67 ods. 2 and 3