Floor Area Ratio
A floor area ratio is a limit on the total floor area of a building against its plot. A land-use plan sets the limit.
What is the floor area ratio?
A floor area ratio is a limit on total floor area compared with the area of the land. A land-use plan sets it. Slovak practice calls it index podlažných plôch (IPP). The decree that governs plans calls the limit regulatív podlažných plôch (decree 392/2023 Z. z., § 2 písm. z).
This page covers Slovak rules only. Other countries set their own definitions under their own laws.
How is the floor area ratio calculated?
Add the floor areas of all floors, then divide by the area of the land. The decree defines the limit as a maximum percentage of floor area against an area of land (§ 2 písm. z). That area is the spatial-functional unit (priestorovo-funkčný celok), a part of it, or the plot. The plan states which one it uses.
The decree expresses the limit as a percentage. A ratio of 1.5 is therefore 150 percent. A plan may print either form, so read the unit in the plan.
Example, for illustration only. A plot of 1,000 m² in a zone with a limit of 150 percent allows a total floor area of 1,500 m². The 150 percent is an assumed value, not a Slovak limit.
What counts as floor area?
Floor area (podlažná plocha) is the sum of the areas of all above-ground or below-ground floors of a building. It includes the perimeter structures (§ 2 písm. y). The perimeter walls are inside the figure. The result is larger than the area you can walk on.
A floor (podlažie) is the part of the inner space between a floor structure and the next ceiling structure. If the building has only a roof structure, the floor lies between the floor and the roof (§ 2 písm. x). The decree does not use the term hrubá podlažná plocha. Its term is podlažná plocha.
Do cellars and underground floors count?
The definition of the limit names the floor area of above-ground floors and of below-ground floors (§ 2 písm. z). Do not assume that a cellar is free. Read how the plan applies the limit in the regulation sheet of your zone.
Does every plan set a floor area limit?
No. A municipal plan and a zonal plan must hold either a built-area limit or a floor-area limit. The decree lists "regulatív zastavanosti alebo podlažných plôch" as one basic regulative (§ 16 ods. 2 písm. a, ods. 5 písm. a). A plan may use only the building coverage ratio.
The decree lists three more basic regulatives for a municipal plan: building height, vegetation areas and public space (§ 16 ods. 2). Plans approved before 31 March 2024 follow older rules. They remain the basis for binding opinions until the authority replaces them. They lose validity on 1 April 2032 if nobody replaces them (zákon 200/2022 Z. z., § 40 ods. 3 a 4).
How does it differ from the building coverage ratio?
The floor area ratio counts all floors. The building coverage ratio counts the footprint only. A tall building and a low building can have the same footprint and different floor area.
| Regulative | What it limits | Source |
|---|---|---|
| Built area (zastavanosť) | Projection of above-ground floors onto the terrain | § 2 písm. v, w |
| Floor area (podlažné plochy) | Sum of floor areas, perimeter structures included | § 2 písm. y, z |
| Height (výška zástavby) | Metres or number of standard floors | § 2 písm. aa |
For the height limit, an attic or set-back floor counts as a standard floor. Its floor area must be more than 50 percent of the floor below it (§ 2 písm. aa). That rule belongs to the height limit, not to the floor area limit.
Where is the floor area limit set, and how do you find it?
The limit sits in the binding part of the municipal land-use plan or the zonal land-use plan. The municipal plan sets the manner and intensity of land use (zákon 200/2022 Z. z., § 22 ods. 3 písm. c). No national maximum exists. Neither act nor the decree gives a value.
Ask for the extract from the binding part of the plan. It holds a cut-out of the regulation drawing and the regulation sheet (regulačný list) of the unit that holds your plot (§ 25 ods. 12). The planning information entry explains the document.
Can you exceed the floor area limit?
No general rule allows it. Construction may proceed only in line with the binding part of the planning documentation (zákon 25/2025 Z. z., § 21 ods. 1). The binding opinion (záväzné stanovisko) records whether the building intent matches the plan (zákon 200/2022 Z. z., § 24 ods. 1).
The act names one deviation rule. In Bratislava and Košice an agreement linked to an investment can set deviations from the binding part of the municipal plan. Special laws set the extent (§ 22 ods. 5).
Related entries: the green space coefficient sets a minimum of planted land. See also the entries on density and buildability of land.
Frequently asked questions
- What is index podlažných plôch (IPP)?
- Index podlažných plôch is the common Slovak name for the limit on total floor area against the area of the land. The decree 392/2023 Z. z. names it regulatív podlažných plôch and defines it as a maximum percentage.
- How do I calculate the floor area ratio of my plot?
- Add the floor areas of all floors, perimeter walls included, and divide by the plot area. A building with 1,500 m² of floor area on a plot of 1,000 m² has a ratio of 1.5, which is 150 percent.
- Is the floor area ratio a percentage or a decimal number?
- The decree defines it as a percentage. The decimal form is the same value divided by 100, so 150 percent equals 1.5. Check which form your plan prints.
- Is hrubá podlažná plocha the same as podlažná plocha?
- The decree does not use the term hrubá podlažná plocha. It defines podlažná plocha as the sum of all floor areas, perimeter structures included.
- Do cellars count toward the floor area limit?
- The definition of the limit names above-ground and below-ground floors. Read the regulation sheet of your zone to see how the plan applies it.
- What is the maximum floor area ratio in Slovakia?
- No national maximum exists. Each plan sets its own value for each zone. Ask for the extract from the binding part of the plan to read the value for your plot.
Sources
- Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky č. 392/2023 Z. z. o obsahu a spôsobe spracovania územnoplánovacej dokumentácie a o územnoplánovacích podkladoch a všeobecných požiadavkách na priestorové usporiadanie územia a funkčné využívanie územia · Úrad pre územné plánovanie a výstavbu SR, Slov-Lex · § 2 písm. v, w, x, y, z, aa, ab, ac, ap; § 16 ods. 1, 2, 3, 5
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 2 písm. j, § 18 ods. 1 a 2, § 22 ods. 3 a 5, § 24 ods. 1, 2, 4, 5, § 25 ods. 12, § 40 ods. 3 a 4
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 21 ods. 1